HomeMy WebLinkAbout89-91 RESOLUTIONRESOLUTION NO.
•
89-91
A RESOLUTION APPROVING TASK ORDER #3 TO THE
ENGINEERING CONTRACT WITH MCCLELLAND
CONSULTING ENGINEERS, INC. TO DO SURVEY,
EASEMENT, AND PLAT WORK REQUIRED FOR EASEMENT
AND PROPERTY ACQUISITION FOR THE AIRPORT.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE,.ARKANSAS:
Section 1. That the Mayor and City Clerk are hereby
authorized and directed to execute Task Order No. 3 to the
engineering contract with McClelland Consulting Engineers, Inc. to
do survey, easement and plat work required for easement and land
acquisitions for the runway protection zones andtransitional
surfaces purchase project at the airport. A copy of the task order
authorized for execution hereby is attached hereto marked Exhibit
"A" and made a part hereof.
PASSED AND APPROVED this 21st day of May , 1991.
F .e r
i 4g-
- APPROVED:
t•".t e
rfl
„ATTEST: 1, ,`4
ti
4 ,
1!.
=By : /� N -'lS� f4arys?O/J�
City CNerk
_ .
- : -
i. j t
f * 1 I.
-c
Mayor t
TASK ORDER NO. 3
LAND ACQUISITION AND AVIGATION EASEMENTS
FOR RUNWAY APPROACH SLOPES
DRAKE FIELD, FAYETTEVILLE, ARKANSAS
This Task Order is hereby made a part of the Basic Agreement
executed September 21, 1989 between McClelland Consulting
Engineers, Inc., (ENGINEER) and the City of Fayetteville (OWNER) in
accordance with the provisions of that Agreement.
ARTICLE 1
The Owner and Engineer have completed an Obstruction Study for the
Approaches into Drake Field with acceptance by the FAA. The
results of this study and recommendations from FAA indicate that
numerous easements and property acquisitions are required in order
to control the height of objects or to .mark obstruction with
obstruction lights within the approach slopes to Drake Field.
The Owner and the FAA have agreed to change funding priorities in
order to acquire the property and easements on a first priority
basis. Therefore, Task Order Nos. 1 and 2 executed between the
Owner and the Engineer are hereby modified. Task Order No. 1 is to
be considered Null and Void following payment for services rendered
through February 1, 1991. Task Order No.'2is hereby modified to
delete "Project I, Phase II Obstruction Removal/Lighting" from
Article 1 and from Article 2, paragraphs 2, 3, 4, and 5, thereby
decreasing the fee under Task Order No. 2 by $58,500.00.
The Owner wishes to obtain property within the Runway Protection
Zones and easements within the Part 77 Surfaces for the 34:1 Non -
Precision Approach to Runway 16 (Northend) and acquire property
20:1 and easements within the Part 77 Surfaces for the Visual
Approach to Runway 34 (South end) under FAA Grant No. AIP
0020-11 and future grant.
The Engineer will provide the following services necessary to
provide Property Deeds, and Property Ownership, complete property
surveys, plats of survey and easement, as required to acquire the
property and/or easement to meet FAA Criteria.
1. Perform a record search to determine present
property boundary description, ownership, name and
address, and any existing avigation easement.
Develop a Property Map indicating parcels of land
to be acquired by fee simple title and parcels to
acquire by avigation easement.
2. Perform field surveys to determine the property
boundary locations for approximately 28 property
acquisition tracts and approximately 86 avigation
easement acquisition tracts. Prepare plats of
survey for property or easement acquisition and a
profile of easement tracts indicating the height
limitations. Field staking for the property
boundary corners and easement boundary corners.
3. Provide assistance to Acquisition Consultants and
to Airport and City staff during the acquisition
process.
4. Perform Project Management duties including
meetings with Surveyors, Airport Property
Acquisition Consultants, Airport and City staff and
FAA as required; provide letters to property
owners; and overall project management for related
ownership search, surveying and plat preparation
activities.
ARTICLE 2
The compensation for services to be provided in Article 1 above
shall be according to the following schedules:
1. For development of current property ownership
deeds, names, addresses, and existing avigation
easements by an abstractor at an hourly rate of $35
per hour.
An amount not to exceed $ 5,000.00
2. For the development of property map indicating
parcels designated to be acquired by fee simple or
by avigation easement: '
A lump sum amount of $ 4,300.00
•
3. For the field surveying and office computation
required to locate and determine property boundary,
corners for simple parcels and easement ,boundary
corners for easement acquisition parcels, a fee per
parcel to be determinedfrom actual direct labor,
payroll cost, direct non -payroll cost, indirect
cost and profit in accordance with the attached
Exhibit "A" incurred divided equally between all
parcels within Corporate City Limits and equally
between all parcels lying outside the Corporate
City Limits within the County. The maximum fee for
parcels within Corporate limits shall not exceed
$820.00 per parcel. The maximum fee for parcels
•
lying outside the corporate City Limits within the
County shall not exceed $1,250.00 per parcel. The
fourteen (14) parcels for which field surveys
completed under the AIP 3-05-0020-11 Grant will not
be subject to a fee under -this project. Several
separate parcels under the same ownership may be
combined for acquisition purposes there by reducing
the number of total parcels and the total fee.
An amount not to exceed $85,900.00
•
4. For the preparation of Descriptions and property
survey plats and easement description and easement
plats (2 per parcel required by FAA), a fee per
parcel to be determined from actual direct labor
payroll cost, non -payroll cost, indirect cost and
profit in accordance with the attached Exihibit "A"
incurred divided equally between all parcels. The
maximum fee per parcel shall not exceed $520.00.
The fourteen (14) parcels for which easements were
prepared under the AIP 3-05-0020-11 Grant will have
a maximum fee of $300.00 for required revisions.
An amount not to exceed $56,000.00
5. For Project Management and assistance to
acquisition consultants and Airport and City staff,
A lump sum fee of $ 8,260.00
The Hourly Rate Schedule "Exhibit B: to the Basic Agreement shall
be modified according to paragraph 2 of Article 2. The revised
Hourly Rate Schedule shall be as follows:
HOURLY RATE SCHEDULE
July, 1991 - June 1992
Project Director $75.00
Project Manager 68.00
Project Engineer 48.00
Electrical Engineer 60.00
Electrical Designer 50.00
Chief Draftsman 45.00
Senior Draftsman 35.00
Draftsman 25.00
Engineering Technician 25.00
Registered Land Surveyor 35.00
Survey Technician 30.00
Survey Crew (2 -man) 60.00
Survey Crew (3 -man) 75.00
Construction Observer 45.00
ARTICLE 5
IN WITNESS WHEREOF, the parties hereto each herewith subscribe the
same in triplicate.
SEAL
tS '
SATTESTY.
City Glerk
SEAL
ey
• (�
FORY�7" ' T` FAYETTEVILLE, ARKANSAS
By• � �n
Dated this 21st day of v May 1991
FOR McCLEL CONS G ENGINEERS, INC.
By: C—
Dated this tS�
day of V v 1CGLt(r 1991
TASK
EXHIBIT "A"
ENGINEERING MANPOWER AND COST ESTIMATE
McCLELLAND CONSULTING ENGINEERS INC.
LAND & EASEMENT ACQUISTION SURVEYING SERVICES
DRAKE FIELD
FAYE TEVILLE MUNCIPAL AIRPORT
FAYETTEVII.LE, ARKANSAS
AIP 3-05-0020-11 & **
MAY 1, 1991
LEVEL OF PERSONNEL
MANHOURS COST MAJOR TASK COST
PROPERTY OWNERSHIP RESEARCH (GREER ABSTRACT)
INITIAL DEVELOPMENT OF PROPERTY MAP,
DEEDS, & OWNER,SHIP INFORMATION
PROJECT MANAGER
LAND SURVEYOR
DRAFTSMAN
CLERICAL
$5,000.00
PROPERTY OWNERSHIP $5,000.00
45.0 $990.00
18.0 $189.00
30.0 $255.00
4.0 $30.80
SUBTOTAL $1,464.80
INITIAL DEVELOPMENT COST $1,464.80
PROJECT MANAGEMENT
PROJECT DIRECTOR 15.0
PROJECT MANAGER 100.0
CLERICAL 20.0
$465 00
$2,200.00
$160.00
SUBTOTAL $2,825.00
PROJECT MANAGEMENT
SURVEY, DESCRIPTION, EASEMENT AND PLAT DEVELOPMENT COST (PER TRACT)
COURT HOUSE RESEARCH
RECORDED SURVEYS
LAND SURVEYOR 0.5
FIELD SURVEY WORK
FIELD RESEARCH
SURVEY CREW (2 MAN) 2.0
FIELD SURVEY TRAVERSE
SURVEY CREW (2 MAN) 6.0
STAKE EASEMENT OR PROPERTY CORNERS
LAND SURVEYOR 0.5
SURVEY CREW (2 MAN) 3.0
OFFICE COMPUTATIONS
REDUCE TRAVERSE
LAND SURVEYOR 3.0
DETERMINE TRACT & EASEMENT OR
LAND ACQUISITION CORNERS
LAND SURVEYOR
$5.50
COURT HOSE RESEARCH
$31.50
$94.50
$5.50
$47.25
SUBTOTAL $52.75
FIELD SURVEY PER TRACT
$33.00
3.0 $33.00
OFFICE COMPUTATIONS
Page 1
$2,825.00
85.50
$178.75
$66.00
TASK
1
EXHIBIT "A"
ENGINEERING MANPOWER AND COST ESTIMATE
McCLELLAND CONSULTING ENGINEERS INC.
LAND & EASEMENT ACQUISTION SURVEYING SERVICES
DRAKE FIELD
FAYETTEVILLE MUNCIPAL AIRPORT
FAYEPI'fVILLE, ARKANSAS
AIP 3-05-0020-11 & **
MAY 1, 1991
LEVEL OF PERSONNEL
PREPARATION OF EASEMENT OR
AND TRACT MAPS
PREPARE EASEMENT
LAND SURVEYOR
CLERICAL
PREPARATION OF PLATS
LAND SURVEYOR
SURVEY TECHNICIAN
DIRECT LABOR
PAYROLL EXPENSE (35%)
DIRECT NON -PAYROLL COSTS
MATERIALS AND SUPPLIES
REPRODUCTION
DATA PROCESSING
TRAVEL EXPENSES.
EQUIPMENT RENTAL
OUTSIDE CONSULTANT
SUBTOTAL DIRECT COSTS
INDIRECT COSTS (126%)
SUBTOTAL DIRECT & INDIRECT
PROFIT
TOTALS
TOTAL FEE
PREPARED BY:
MANHOURS COST
LAND DESCRIPTION
2.0
1.0
SUBTOTAL
$22.00
$7.00
$29.00
MAJOR TASK COST
6.0 $66.00
8.0 $80.00
SUBTOTAL $146.00
PREPARE EASE. & PLATS $175.00
TOTAL COST (PRE TRAGI)
TOTAL TRACTS = 114
TOTAL EASEMENT OR DESORPTION
AND PLAT COST
SUMMARY OF COSTS
OWNERSHIP
RESEARCH
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$5,000.00
$5,000.00
$0.00
$5,000.00
$0.00
$5,000.00
SURVEYING
COST
$48,478.50 -
$16,967.48-
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$65,445.98
$61,082.91-
$126,528.89-
$15,183.47-
$141,712.35
Page 2
INITIAL
DEVELPCMENT
$1,464.80•
$512.68-
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,977.48
$1,845.65-
$3,823.13
$458.78-
$4,281.90
DATE:
$425.25
$48,478.50
PROJECT TOTAL
MANAGEMENT
$2,825.00'
$988.75'
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,813.75
$52,768.30
$18,468.91-
$0.00
$0.00
$0.00
$0.00
$0.00
$5,000.00•
$76,237.21
$3,559.50- $66,488.06• •
$7,373.25- $142,725.26
$884.79. $16,527.03-
$8,258.04 $159,252.29
$159,252.29
///%f7