HomeMy WebLinkAbout67-91 RESOLUTION• RESOLUTION NO. 67-21 • ti r A RESOLUTION APPROVING TWO CHANGE ORDERS TO THE CONTRACT OF MCCLINTON-ANCHOR FOR THE GULLEY PARK PARKING LOT AND SIDEWALK CONSTRUCTION/. • , 1x 1 1 • BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Mayor and City Clerk are hereby• authorized and directed to execute two change orders in the amount of $16,167.00 to the'contract of McClinton -Anchor for the Gully Park parking lot and sidewalk construction. A copy of the change orders authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 16th day of April APPROVED:�, By:`� Le: `" Mayor `�`1 .: u. tee+.. -t• f/rfr .�-•,n1. yA. pATTEST: By: .--i 'j`� .. -4r'f'rf City Cl%rk ar_ • , 1991. AV ✓ WENDY BROOKE LANE IPVT.I J 'Q G co W P9 W N [IT •In a W i Prod I Y 11 LI STR;Er PEEL ST. W 2 m ST. IIe m OVERCREST o �Q cc m 2 2 > 0 m I ST. Occ1 C ELIZABETH AVENUE CENTURY DR. 1 '//'�( GULLEY PARK SUSAN CARD NAL 6!I �s EAST OAKS '4s 1 DRIVE ♦4 C. R OA s PL KANTZ DRIVE ELMWOOD M HACKBERRY DRIVE DRIVE AWELOT PLACE s CALVIN ST. NSFIE REVERE PL CE PLACE HAMMOND ST 0 0 CAROLYN BIRWIN • ST. J J E. LAKESIDE L ocArio aJ MfiP Guar( /3/2A- CmwN e c9ec e PROJECT: CONTRACTOR: CHANGE ORDER NO. 1 Gulley Park Parking Lot, Gravel Drive, and Concrete Apron, Bid No. 90-49 APAC Arkansas, McClinton -Anchor Division PROPOSED CHANGE: Add to the Contract the removal of approximately 1280 cubic yards of existing subgrade material and replace with cherty "hillside" material compacted to 95 percent of standard proctor. JUSTIFICATION: ADDED COST: TIME CHANGE: APPROVALS: The original contract did not cover the possibility of poor subgrade conditions such as was found in the project. The change will add a lump sum of $10,880.00 to the price of the contract (1280 cubic yards at $8.50 per yard). Original Contract Price Change Order No. 1 New Contract Price $ 17,519.00 $ 10.880.00 $ 28'.399.00 This change shall add 10 calendar days to the contract time period for a total of 40 calendar days. CONTRACTOR OWNER APAC-ARKANSAS CI OF FAYETTEVILLE n .,ems Date Date PROJECT: CONTRACTOR: PROPOSED CHANGE: JUSTIFICATION: ADDED COST: TIME_CHANGE: APPROVALS: CHANGE ORDER NO. 1 Gulley Park Sidewalk, Bid No. 90-60 APAC Arkansas, McClinton -Anchor Division Add to the Contract the removal of approximately :62.2) cubic yards of existing subgrade material and replace with cherty "hillside" material compacted to 95 percent of standard proctor. The original contract did not cover the possibility of poor subgrade conditions such as was found in the project. The change will add a lump s the price of the contract (6 $8.50 per yard). um of $8;-2!87-�00`to 22 cubic yards at Original Contract Price Change Order No. 1 New Contract. Price $ 20,000.00 $ 5,287.00 $ 25,287.00 This change shall add 10 calendar days to the contract time period for a total of 40 calendar days. CONTRACTOR APAC-ARKANSAS zattai 4. Leif Date OWNER CIITY OF FAYETTEVILLE aTric -171?-/(6 -1 Date