Loading...
HomeMy WebLinkAbout65-91 RESOLUTION• RESOLUTION NO. 65-91 A RESOLUTION .AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A CONTRACT WITH GOODWIN & GOODWIN CONSTRUCTION COMPANY FOR SEWER FORCE MAIN REPLACEMENTS. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute a contract with Goodwin & Goodwin Construction Company in the amount of $57,900.00 plus $2,100.00 for contingencies for'sewer force main replacements in the vicinity of the airport. A copy of the contract authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. • PASSED AND APPROVED this 16th day of April , 1991. "irii fat 'r Vii. a _ .. ATTEST: City Cl • • • APPROVED: By: /meq Mayor • obit eP k O E 9Tli2 ci lA . w rr "' ST 1 D_ W a j Z W 3 a a �•IITH ST MC CLINT')V N O E 12TH O ST E. 1aTH ST 2 5TH16 ST ELLA ST EMPLANE ST ST E 15TH 0 I U(xIYE fT,OF ;S 0 ENG EERIMG: co • OUTHI ROAD a UEN o a CIR < SELL, F 2 LAURA LEE ST O ]O WELL RO Dowell Cement TREAT ST ONNAMANEP SOR Olv Property INDUSTRIAL Pucer. • • Animal Cornet • • FAIET7EV!LLE ^. INDUSTRIAL r , ',': .PARK,. ca re 1 •L I P. 1 •. (COMMERCE �R •"•� tier' 1 CHERRY ST p Us DR HILLOCK ST • E TAW RD uar czC y BAILEY( I RI I,L' le • ZIGHBV roject Loca4iori RIVER L 1. ..11.. 1RORAI�PLIFlELD , •1 ; I reiretli S'.• ••. et •h,'l� l.•. ,.I 1 1414.7 ROAD irj 44.15 illi A.Yti ! I_ F' II t: CC /W acc \cc 0 ur IS■ -I //LLI C.) § TABULATION OF BIDS ai / -9 #§ t# §§ $§ §§ $§ 2| K§ �° §° ■ ! § BOO u. % ƒ 2§ BID AWARD SUMMARY: ( « a CERTIFIED 8Y • co | SECTION 00'500 CONTRACT THIS AGREEMENT, made and entered into on the , 1991, by and between day of herein called the Contractor, and the City of Fayetteville, Arkansas, hereinafter called the Owner: WITNESBET$S That the Contractor, for the consideration hereinafter fully set out, hereby agrees with the Owner as follows: 1. That the Contractor shall furnish all the materials, and perform all of the work in manner and form as provided by the following enumerated Drawings, Specifications, and Documents, which are attached hereto and made a part hereof, as if fully contained herein and are entitled AIRPORT FORCE MAIN REPLACEMENT dated December, 1991, including: Invitation to Bid; Addenda; Instructions to Bidders; General Conditions; Supplementary Conditions; Performance and Payment Bonds; Specifications; the Proposal and acceptance thereof; and the Drawings. DRAWING INDEX DWG. NO. TITLE 1. Cover 2. Plan and Profile 3. Plan and Profile 4. Pump Station Modifications 5. Details 2. That the Contractor shall commence the work to be performed under this Agreement on a date to be specified in a written order of the Owner and shall fully complete all work hereunder in 45 calendar days. 3 That the Owner hereby agrees to pay to the Contractor for the faithful performance of this Agreement, subject to additions and deductions as provided in the Specifications or Proposal, in lawful money of the United States, the amount of: Dollars ($ ), based on the Base Bid contained herein. Section 00500 - 1 MCCI.IIaM �' , CoowltInp Engineers Incorporated Fayetteville, Arkansas 4. That within 30 days of receipt of an approved payment request, the Owner shall make partial payments to the Contractor on the basis of a duly certified and approved estimate of work performed during the preceding calendar month by the Contractor, LESS the retainage provided in the General Conditions, which is to be withheld by the Owner until all work within a particular part has been performed strictly in accordance with this Agreement and until such work has been accepted by the Owner. 5. That upon submission by the Contractor of evidence satisfactory to the Owner that all payrolls, material bills, and other costs incurred by the Contractor in connection with the construction of the work have been paid in full, final payment on account of this Agreement shall be made within 60 days after the completion by the Contractor of all work covered by this Agreement and the acceptance of such work by the Owner. 6. In the event that the Contractor shall fail to complete the work within the time limit or the extended time limit agreed upon, as more particularly set forth in the Contract Documents, liquidated damages shall be paid at the rates designated in the Proposal. 7. It is further mutually agreed between the parties hereto that if, at any time after the execution of this Agreement and the Surety Bond hereto attached for its faithful performance and payment, the Owner shall deem the Surety or Sureties upon such bond to be unsatisfactory or if, for any reason such bond ceases to be adequate to cover the performance of the work, the Contractor shall, at his expense, within 5 days after the receipt of notice from the Owner, furnish an additional bond or bonds in such form and amount and with such Surety or Sureties as shall be satisfactory to the Owner. In such event, no further payment to the Contractor shall be deemed to be due under this Agreement until such new or additional security for the faithful performance of the work shall be furnished in manner and form satisfactory to the Owner. • No additional work or extras shall be done unless the same shall be duly authorized by appropriate action by the Owner in writing. „ McClsfrond Como s In000ln..rorporofM Foy*111vllny Arkansas Section 00500 - 2 • 1 1 r. IN WITNESS WHEREOF, the parties hereto have executed on the day and date first above written, in ( ) each of which shall, without proof or accounting counterpart be deemed an original Contract. WITNESSES: ATTEST: City Clerk Approved as to form: Attorney for Owner Contractor BY Title this Agreement counterparts, for the other CITY OF FAYETTEVILLE Owner By Mayor Title McClelland n /ft, Enn1• • Inoocporvnd FayelHville, Arkansas Section 00500 - 3