RESOLUTION NO. 65-91
A RESOLUTION .AUTHORIZING THE MAYOR AND CITY
CLERK TO EXECUTE A CONTRACT WITH GOODWIN &
GOODWIN CONSTRUCTION COMPANY FOR SEWER FORCE
MAIN REPLACEMENTS.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the Mayor and City Clerk are hereby
authorized and directed to execute a contract with Goodwin &
Goodwin Construction Company in the amount of $57,900.00 plus
$2,100.00 for contingencies for'sewer force main replacements in
the vicinity of the airport. A copy of the contract authorized for
execution hereby is attached hereto marked Exhibit "A" and made a
part hereof.
•
PASSED AND APPROVED this 16th day of April , 1991.
"irii fat
'r Vii.
a _ ..
ATTEST:
City Cl
•
•
•
APPROVED:
By: /meq
Mayor
•
obit
eP k
O
E 9Tli2 ci lA . w rr
"'
ST 1 D_
W a j Z W
3 a a
�•IITH ST MC CLINT')V N O
E 12TH O
ST
E. 1aTH ST 2
5TH16 ST
ELLA ST
EMPLANE ST
ST
E 15TH
0
I U(xIYE fT,OF ;S 0
ENG EERIMG: co
•
OUTHI
ROAD
a
UEN o a
CIR < SELL,
F
2 LAURA
LEE ST
O
]O WELL
RO
Dowell
Cement
TREAT ST
ONNAMANEP
SOR
Olv
Property
INDUSTRIAL
Pucer.
•
•
Animal
Cornet
•
•
FAIET7EV!LLE
^. INDUSTRIAL r ,
',': .PARK,.
ca
re
1
•L I
P.
1
•. (COMMERCE �R
•"•� tier' 1
CHERRY ST p
Us DR
HILLOCK ST
•
E
TAW RD
uar
czC
y BAILEY(
I
RI
I,L'
le
•
ZIGHBV
roject Loca4iori
RIVER
L
1.
..11.. 1RORAI�PLIFlELD ,
•1
;
I
reiretli
S'.• ••.
et
•h,'l� l.•. ,.I 1
1414.7
ROAD
irj 44.15
illi A.Yti ! I_ F'
II
t:
CC
/W
acc
\cc
0 ur
IS■ -I
//LLI
C.)
§
TABULATION OF BIDS
ai
/
-9
#§ t# §§ $§ §§ $§ 2| K§
�° §° ■ ! §
BOO
u.
%
ƒ
2§
BID AWARD SUMMARY:
(
«
a
CERTIFIED 8Y
•
co
|
SECTION 00'500
CONTRACT
THIS AGREEMENT, made and entered into on the
, 1991, by and between
day of
herein called the Contractor, and the City of Fayetteville,
Arkansas, hereinafter called the Owner:
WITNESBET$S
That the Contractor, for the consideration hereinafter fully set
out, hereby agrees with the Owner as follows:
1. That the Contractor shall furnish all the materials, and
perform all of the work in manner and form as provided by the
following enumerated Drawings, Specifications, and Documents,
which are attached hereto and made a part hereof, as if fully
contained herein and are entitled AIRPORT FORCE MAIN
REPLACEMENT dated December, 1991, including:
Invitation to Bid; Addenda; Instructions to Bidders; General
Conditions; Supplementary Conditions; Performance and Payment
Bonds; Specifications; the Proposal and acceptance thereof;
and the Drawings.
DRAWING INDEX
DWG. NO. TITLE
1. Cover
2. Plan and Profile
3. Plan and Profile
4. Pump Station Modifications
5. Details
2. That the Contractor shall commence the work to be performed
under this Agreement on a date to be specified in a written
order of the Owner and shall fully complete all work hereunder
in 45 calendar days.
3 That the Owner hereby agrees to pay to the Contractor for the
faithful performance of this Agreement, subject to additions
and deductions as provided in the Specifications or Proposal,
in lawful money of the United States, the amount of:
Dollars ($ ),
based on the Base Bid contained herein.
Section 00500 - 1
MCCI.IIaM
�' , CoowltInp
Engineers
Incorporated
Fayetteville, Arkansas
4. That within 30 days of receipt of an approved payment request,
the Owner shall make partial payments to the Contractor on the
basis of a duly certified and approved estimate of work
performed during the preceding calendar month by the
Contractor, LESS the retainage provided in the General
Conditions, which is to be withheld by the Owner until all
work within a particular part has been performed strictly in
accordance with this Agreement and until such work has been
accepted by the Owner.
5. That upon submission by the Contractor of evidence
satisfactory to the Owner that all payrolls, material bills,
and other costs incurred by the Contractor in connection with
the construction of the work have been paid in full, final
payment on account of this Agreement shall be made within 60
days after the completion by the Contractor of all work
covered by this Agreement and the acceptance of such work by
the Owner.
6. In the event that the Contractor shall fail to complete the
work within the time limit or the extended time limit agreed
upon, as more particularly set forth in the Contract
Documents, liquidated damages shall be paid at the rates
designated in the Proposal.
7. It is further mutually agreed between the parties hereto that
if, at any time after the execution of this Agreement and the
Surety Bond hereto attached for its faithful performance and
payment, the Owner shall deem the Surety or Sureties upon such
bond to be unsatisfactory or if, for any reason such bond
ceases to be adequate to cover the performance of the work,
the Contractor shall, at his expense, within 5 days after the
receipt of notice from the Owner, furnish an additional bond
or bonds in such form and amount and with such Surety or
Sureties as shall be satisfactory to the Owner. In such
event, no further payment to the Contractor shall be deemed to
be due under this Agreement until such new or additional
security for the faithful performance of the work shall be
furnished in manner and form satisfactory to the Owner.
•
No additional work or extras shall be done unless the same
shall be duly authorized by appropriate action by the Owner in
writing.
„
McClsfrond
Como s
In000ln..rorporofM
Foy*111vllny Arkansas
Section 00500 - 2
•
1
1
r.
IN WITNESS WHEREOF, the parties hereto have executed
on the day and date first above written, in
( )
each of which shall, without proof or accounting
counterpart be deemed an original Contract.
WITNESSES:
ATTEST:
City Clerk
Approved as to form:
Attorney for Owner
Contractor
BY
Title
this Agreement
counterparts,
for the other
CITY OF FAYETTEVILLE
Owner
By
Mayor
Title
McClelland
n
/ft, Enn1• •
Inoocporvnd
FayelHville, Arkansas
Section 00500 - 3