HomeMy WebLinkAbout40-91 RESOLUTION1 • RESOLUTION NO. 40-91 A RESOLUTION AUTHORIZING CHANGE ORDER NO. 3 TO THE WALTON ARTS CENTER CONSTRUCTION PROJECT. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute Change Order No. 3 to the construction contract of Carson & Associates for the Walton Arts Center in the amount of $600,293.00 (this amount will be paid by privately donated funds). A copy of the change order authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 5th day of March APPROVED: By n ATTEST: ifmv�404. City CC1oik S.C.- • • Mayor , 1991. itY<.yo�_ J • Mott Mobley McGowan 8 Grit fin, P.A.: Architects • 3C2 Norm Sixtn Street Fort Srnrtn. Arkansas 72901 Telephone 1501) 752•1051 January 28, 1991 Carson S Associates 1310 West 14th Street Little Rock, Arkansas 72202 Gentlemen: Our Project No. 1369 .Re: Agreement dated April 28, 1990 Walton Arts Center Fayetteville, Arkansas CHANGE ORDER NO. 3 You are hereby authorized to make the following changes in the Work included in the referenced Agreement with the City of Fayetteville and the University of Arkansas: 1. Refer which doors to Paragraph 7.3.2, Item a. Reinstate this consists of allowance No. 1, finish hardware and exterior aluminum doors (Addendum No. 4, item of Work for interior Item No. 1). 2. Refer to Paragraph 7.3.2, Item m. Reinstate this item of Work which consists of Chillers C-1 and C-2; Air Handling Units 3, 5, 8 and 10; Return Air Fans 1 and 2; and Unit Heaters UH -1 and LTH -1 (Addendum No. 4, Item Nos. 17 and 18). MM MG Refer to Paragraph 7.3.2, Item n. Reinstate this item of Work which consists of Steam Humidifiers H-3, H-5, H-8 and H-10 in Mechanical Room 114 (Addendum No. 4, Item No. 19). Refer to Paragraph 7.3.2, Item p. Reinstate this item of Work which consists of flexible connectors for chillers and pumps in Mechanical Room 114; Convertor C-1 and Unit Heaters UH -1 and UH -2 in Mechanical Room 114; and Expansion Tanks, Air, Separa- tors and Pumps P-2, P-3, P-4 and P-5 in Mechanical Room 114 (Addendum No. 4, Item No. 21). • Change Order No. 3 January 28, 1991 Page two • 5. Refer to Paragraph 7.3.2, Item q. Reinstate a portion of this item of Work consisting of the piping in Mechanical Room 114 (Addendum No. 4, Item No. 22). 6. Refer to Paragraph 7.3.2, Item r. Reinstate a portion of this item of Work consisting of all sheet metal in Mechanical Room 114 (Addendum No. 4, Item No. 24). . 7. Refer to Paragraph 7.3.2, Item s. Reinstate this item of Work consisting of mechanical insulation on piping, ductwork and equipment in Mechanical Room 114 (Addendum No. 4, Item No. 26). 8. Refer to Paragraph 7.3.2, Item t. Reinstate this item of Work consisting of automatic temperature controls (Addendum No. 4, Item No. 27). 9. Refer to Paragraph 7.3.2, Item x. Reinstate this item of Work consisting of lighting fixtures (Addendum No. 4, Item No. 31). 10. Refer to Paragraph 7:3.2, Item y. Reinstate a portion of this item of Work consisting of all masonry materials and work in access ramp covers and entry canopies (Alternate Bid No. 4). 11. A11 work in conjunction with the items listed above shall be installed as shown on the Drawings and as specified. Accordingly, the Contract will be INCREASED by $600,293.00 Original CONTRACT SUM Change Order No. 1 Change Order No. 2 Change per this CHANGE ORDER Adjusted CONTRACT SUM The Contract Time WILL NOT BE CHANGED by the work Change Order. MM MG $ 5,476,370.00 12,968.00 28,297.00 600,293.00 $ 6,117,928.00 to be done under this • RECOMMENDED: ACCEPTED: MOTT MOBLEY McGOWAN & GRIFFIN, P.A. CARSON & ASSOCIATES APPROVED: BOARD OF TRUSTEES UNIVERSITY OF ARKANSAS Distribution: O -an e r Architect Contractor Date: By L"o b CITY OF FAYETTEVILLE, ARKANSAS._ 14 — University.of Arkansas 3 — City of Fayetteville, Arkansas 1 — Arts Center CQgncil---........ 1 1 Vice ChanceIIDr for Fi^ , ce a Administration APPROVED: Or ICE OF FACILITIES PLANNING AND CONSTRUCTION UNIVERSITY OF ARKA} SAS BY: DATE: MM MG DAs 417,16'! C UM Pr `i SI'_w:L i'h:i r APPROVED PR 2 91991 • • :j2 Contractor hereby agrees to add the .following items of work'to the -scope of work under this Agreement at the;costs lilted provided that written notice to proceed with specific items is given to„the...Contractor_by;,thee dates listed for each item of.work. If`„written..noti�e isnot Fitt/414W by thedatei:liated, the Owner makes a determinatioe-that work ie td be.done,Sthercost. for eechIitem.willsEe.negotiated vith the Contractor; :providint.the•date of substantial completion has not been reached, using aa_a.:basista,'written breakdown of material costs, labor costs and labor burden`to"be•filed with the Owner prior to Cke date of commencement. • a. Allowance No. 1, finish hardware for interior doors and exterior aluminum doors (Addendumu N& 4, Item No. 11 if Contractor is notified no later calendar days following the date of b. Allowance No. 2, purchase and installation No. 4, Item No. 2). ($-417500:0 -61 than 180 consecutive commencement. of carpet (Addendum $ 37,000.00 if Contractor is notified no later than 180 consecutive calendar days following the date of commencement. c. Allowance No. 3, design, purchase and installation of interior signs, exterior signs, applied letters and plaques (Addendum No. 4, Item No. 3). $ 17,000.00 if Contractor is notified no, later than 180 consecutive calendar days following the date of commencement. d. Interior painting (Addendum No. 4, Item No. 4). e. Sound if Contractor calendar days $ 88,957.00 is notified no later than 300 consecutive following the date of commencement. reinforcement system '(Addendum No. 4, Item No. 5). $ 75,896.00 if Contractor is notified no later than 300 consecutive calendar days following the date of commencement. f. Stage drapery, stage rigging, and fire curtain (Addendum No. 4, Item Nos. 6, 7 and 8). $ 280,350.00 if Contractor is notified no later than 300 consecutive calendar days following the date of commencement. 5a g. Acoustical reflector panelskat the ceiling and` at surrounding walls in Auditorium 105 (Addendum No..:4, Item No. 9). - $ 115,402.00 if Contractor is notified no later than 180 consecutive calendar days following the date of commencement. . ` Suspended acoustical ceilings (Addendum No. 4, Item No. 10). $ 21,745.00 if Contractor is notified no later than 300 consecutive calendar days following the date of commencement. i. Resilient flooring, base and accessories (Addendum No. 4, Item Nos. 11 and 1.2). j. Ceramic $ 14,450.00 if Contractor is notified no later than 360 consecutive calendar days following the date of commencement. tile and marble (Addendum No. 4, Item No. 13). $ 14,214.00 if Contractor is notified no later than 270 consecutive calendar days following the date of commencement. k. Acoustical wall panels and wood-fibered acoustic panels (Addendum No. 4, Item Nos. 14 and 15). $ 10,517.00 if Contractor is notified no later than 330 consecutive calendar days following the date of commencement. 1. Window treatment (Addendum No. 4, Item No. 16). m. Chillers Air Fans_ 1 and.2 iN&s. 17 and 18)`. $ 4,081.00 if Contractor is notified no later than 390 consecutive calendar days following the date of commencement. C-1 and C-2; Air Handling Units 3, 5, 8 and 10; Return ; and Unit Heaters 11H-1 and UH -1 ¶(Addendum No. 4, Item. 0'98730811001 if Contractor notified no later than October 1, 1990. 5b • n. Steam Humidifiers H-3, H-5,5/1-8 and H-10 in Me hanical Room 114 (Addendum No. 4, Item No. 19). $ 2,036.00 if. Contractor notified no later than October 1, 1990. O. Steam Boilers B-1 and B-2 and Domestic Hot Water Generator in Mechanical Room.114 (Addendum No. 4, Item No. 20). $ 28,297.00 if Contractor notified no later than August 31, 1990. p. Flexible connectors for chillers and pumps in Mechanical Room 114; Convertor C-1 and Unit Heaters UH -1 and UH -2 in Mechanical Room 114; and Expansion Tanks, Air Separators and Pumps P-2, P-3, P-4 and P-5 in Mechanical Room 1141(Addendum No. 4, Item No. 21) (1-19;,79-117,-0016 if Contractor notified no later than October 1, 1990. q. Piping in Mechanical Room 114 and all plumbing fixtures in the building (Addendum'N6. 4; Item Nos. 22; and 23). $ 53,128.00 if Contractor notified no later than November 1, 1990. r. All sheet metal in Mechanical Room 114 and all grilles, registers and diffusers throughout the building '(Addendum No...4, Item `Nos. 2 jand 25). $ 51,689.00 • if Contractor notified no later than January 1, 1991. s. Mechanical insulation on piping,__ductwork and equipment in Mechanical Room 114' (Addendum No. 4, Item No._26): $ 14,024.00 if Contractor notified no later than September 1, 1990. Automatic temperature controls?(Addendum,No._4,_Item_No.'"-27) $ 172,359.00 if Contractor notified no later than September 30, 1990. 5c • u. Stage lighting control system (Addendum No. 4, Item No. 28). $ 226,240.00 .if Contractor notified no later than January 1, 1991. y.' -Emergency electrical generator (Addendum No. 4, Item No. 29). $ .12,194.00 if Contractor notified no later than December 31, 1990. w. Fire alarm equipment (Addendum No. 4, Item No. 30). $ 7,859.00 if Contractor notified no later than November 1, 1990. x. Lighting fixtures (Addendum„No. 4, Item No. 31 CL1±2,238.00' if Contractor notified no later than September 30, 1990. y. Access ramp covers, entry canopies and construction of solid masonry walls above elevation 57.0' including precast architectural copings ttAlternate'Bid_Nos. 4;and 5). $ 118,000.00 if Contractor is notified no later than 30 consecutive calendar days following the date of commencement. z. Asphalt concrete paving and installation of planting materials (Alternate Bid No. 3). $ 28,000.00 if Contractor is notified no later than 270 consecutive calendar days following the date of commencement. aa. Hydraulic elevator (Alternate Bid No. 2). $ 29,000.00 if Contractor is notified no later than 120 consecutive calendar days following the date of commencement. bb. Orchestra pit lift (Alternate Bid No. 1).. $ 151,000.00 if Contractor is notified no later than 60 consecutive calendar days following the date of commencement. 5d P.O. Box 3547 Fayetteville, Arkansas 72702 Business: 501-443-9216 FAX: 501-443-6461 ARTS CENTER COUNCIL Stephen E. Adams Fayelleville Gerry Bomotti Fayetteville • P. Elliott Burnside - Springdale ...Sonja Decker Fayelleville Karen Botts Bella Vista D. Andrew Gibbs Fayelleville lames Gilbreath Fayelleville Bernard Madison Fayelleville Carol Peters Bella Vista Chalon Ragsdale Fayetteville Frank Sharp Fayelleville Shirley Stacy Bentonville Billie to Starr Fayelleville Nancy Van Poucke Siloam Springs lane Wafers Springdale Linda Wray Springdale 00110" - EXECUTIVE EXECUTIVE DIRECTOR R. William Mitchell February 14, 1991 Mr. Jerry Cooper Staff Administrator City of Fayetteville 113 W. Mountain St. Fayetteville, AR 72701 RE: • CHANGE ORDER NUMBER 3 WALTON ARTS CENTER Dear Jerry: Attached please find twenty (20) •originals of Change Order No. 3 for the Walton Arts Center Project. This change order reinstates the canopy masonry, hardware, some plumbing, most of the mechanical system along with the temperature controls and the lights with related electrical work (Addendum No. 4, Items 1, 17, 18, 19, 21, 22, 24, 26, 27, 31, and Alternate No. 4). These were deleted originally to allow the contract to be awarded and are being added at this time with privately raised funds. The Arts Center Council has approved adding this change order at this time with the funds to be taken out of the privately donated funds. This will require Scott Linebaugh's signature. Change Order No. 3 will also need the University of Arkansas' approval so please return this as soon as possible so I can forward this to the U of A for their approval. If you have any questions, please call. Sincerely, Bob H. Kelly, AtA Construction Manager cc: Ron Cox, U of A Mott Mobley McGowan & Griffin, P.A.: Architects 302 North Sixth Street Telephone (501) 782-1051 January 31, 1991 Fort Smith. Arkansas 72901 Mr. Bob Kelly, AIA Project Manager UofA/Fayetteville Arts Center Council P.O. Box 3547 Fayetteville, AR 72702 Re: Project No. 1369 Walton Arts Center Fayetteville, Arkansas Dear Bob: Enclosed are nineteen (19) copies of Change Order No. 3 in the amount of $600,293.00. All copies have been signed by the Contractor and we are recommending approval. You will note that there is a place for signature by the City and by the University. This is because the base contract which is being modified by the change order is the agreement signed by both of those parties and only they can modify it. You have said that the change order doesn't have to be approved by SBS as it would if it were being paid out of state funds. However, I don't know if the University can approve a change order, even if it's at no cost, without going through the usual process. Since the funds to pay for the items in this change order I'm presuming that the Contractor will now be getting three checks to cover each payment request. Assuming this is correct we will modify our cover letter to indicate what is to be paid by the City, the University, and the Foundation. If you find everything in order please obtain the necessary signatures and return one completed copy to Carson & Associates and one to us as well. Sincerely, MOTT MOBLEY McGOWAN & GRIFFIN, P.A. John K. Mott, FAIA m enc. MM MG • Mott Mobley McGowan & Griffin, P.A.: Architects 302 North Sixth Street Fort Smith. Arkansas 72901 Telecnone (501) 782-1051 January 28, 1991 Our Project No. 1369 Carson & Associates 1310 West 14th Street Little Rock, Arkansas 72202 Re: Agreement dated April 28, 1990 Walton Arts Center Fayetteville, Arkansas CHANGE ORDER N0. 3 Gentlemen: You are hereby authorized to make the following changes in the Work included in the referenced Agreement with the City of Fayetteville and the University of Arkansas: 1. Refer to Paragraph 7.3.2, Item a. Reinstate this item of Work which consists of Allowance No. 1, finish hardware for interior doors and exterior aluminum doors (Addendum No. 4, Item No. 1). 2. Refer to Paragraph 7.3.2, Item m. Reinstate this item of Work which consists of Chillers C-1 and C-2; Air Handling Units 3, 5, 8 and 10; Return Air Fans.1 and 2; and Unit Heaters UH -1 and UH -1 (Addendum No. 4, Item Nos. 17 and 18). 3. Refer to Paragraph 7.3.2, Item n. Reinstate this item of Work which consists of Steam Humidifiers H-3, H-5, H-8 and H-10 in Mechanical Room 114 (Addendum No. 4, Item No. 19). 4. Refer to Paragraph 7.3.2, Item p. Reinstate this item of Work which consists of flexible connectors for chillers and pumps in Mechanical Room 114; Convertor C-1 and Unit Heaters UH -1 and UH -2 in Mechanical Room 114; and Expansion Tanks, Air Separa- tors and Pumps P-2, P-3, P-4 and P-5 in Mechanical Room 114 (Addendum No. 4, Item No. 21). MM MG Change Order No. 3 January 28, 1991 Page two 5. Refer to Paragraph 7.3.2, Item q. Reinstate a portion of this item of Work consisting of the piping in Mechanical Room .114 (Addendum No. 4, Item No. 22). 6. Refer to Paragraph 7.3.2, Item r. Reinstate a portion of this item of Work consisting of all sheet metal in Mechanical Room 114 (Addendum No. 4, Item No. 24). 7. Refer to Paragraph 7.3.2, Item s. Reinstate this item of Work consisting of mechanical insulation on piping, ductwork and equipment in Mechanical Room 114 (Addendum No. 4, Item No. 26). 8. Refer to Paragraph 7.3.2, Item t. Reinstate this item of Work consisting'of automatic temperature controls (Addendum No. 4, Item No. 27). 9. Refer to Paragraph 7.3.2, Item x. Reinstate this item of Work consisting of lighting fixtures (Addendum No. 4, Item No. 31). 10. Refer to Paragraph 7.3.2, Item y. Reinstate a portion of this item of Work consisting of all masonry materials and work in access ramp covers and entry canopies (Alternate Bid No. 4). • 11. All work in conjunction with the items listed above shall be installed as shown on the Drawings and as specified. Accordingly, the Contract will be INCREASED by $600,293.00 Original CONTRACT SUM Change Order No. 1 Change Order No. 2 Change per this CHANGE ORDER Adjusted CONTRACT SUM The Contract Time WILL NOT BE CHANGED by the Change Order. MM MG $ 5,476,370.00 12,968.00 28,297.00 600,293.00 $ 6,117,928.00 work to be done under this 1 Change Order No. 3 January 28, 1991 Page three RECOMMENDED: ACCEPTED: MOTT MOBLEY McGOWAN & GRIFFIN, P.A. CARSON & ASSOCIATES By dbte-tRaJ11--- APPROVED: By anZAL BOARD OF TRUSTEES UNIVERSITY OF ARKANSAS CITY OF FAYETTEVILLE, ARKANSAS By Distribution:. Owner 14 - University of Arkansas 3 - City of Fayetteville, Arkansas 1 - Arts Center Council Architect 1 Contractor 1 MM MG • • J 7.3.2 Contractor hereby agrees to add the following items of intik to the scope of work under this Agreement at the.`costs listed provided that written notice to proceed with specific Stene is given to the. Contractor by the dates listed for each item of.work. It"written Sober is not provided L.autStinftildreteds_amtthe Owner makes a determination that work is to ,brb,eosj for Qach item will be negotiated with the Contractor, provi "'t e.date of substantial completion has not been reached, using as s.b1�a.i ..a written breakdown of material costs, labor costs and labor Gutdiel0"be filed with the Owner prior to the date of commencement. a. Allowance No. 1, finish hardware for interior doors and exterior aluminum doors (Addendum No. 4, Item No. 1). No. $ 41,500.00 if Contractor is notified no later than 180 consecutive calendar days following the date of commencement. b. Allowance No. 2, purchase and installation of carpet (Addendum 4, Item No. 2). c. signs, No. 3). d. $ 37,000.00 if Contractor is notified no later than 180 consecutive calendar days following the date of commencement. Allowance No. 3, design, purchase and installation of interior exterior signs, applied letters and plaques (Addendum No. 4, Item $ 17,000.00 if Contractor is notified no, later than 180 consecutive calendar days following the date of commencement. • Interior painting (Addendum No. 4, Item No. 4). $ 88,957.00 if Contractor is notified no later than 300 consecutive calendar days following the date of commencement. e. Sound reinforcement system '(Addendum No. 4, Item No. 5). $ 75,896.00 if Contractor is notified no later than 300 consecutive calendar days following the date of:commencement. f. Stage drapery, stage rigging, and fire curtain (Addendum No. 4, Item Nos. 6, 7 and 8). $ 280,350.00 if Contractor is notified no later than 300 consecutive calendar days following the date of commencement. • • g. Acoustical reflector panels at the ceiling and at surrounding walls in Auditorium 105 (Addendum No." 4, Item No. 9). • $ 115,402.00 • if Contractor is notified no later than 180 consecutive calendar days following the date of commencement. h. Suspended acoustical ceilings (Addendum No. 4, Item No. 10). • $ 21,745.00 if Contractor is notified no later than 300 consecutive calendar days following the date of commencement. i. Resilient flooring, base and accessories (Addendum No. 4, Item Nos. 11 and 12). $ 14,450.00 if Contractor is notified no later than 360 consecutive calendar days following the date of commencement. j. Ceramic tile and marble (Addendum No. 4, Item No. 13). $ 14,214.00 if Contractor is notified no later than 270 consecutive calendar days following the date of commencement. k. Acoustical wall panels and wood-fibered acoustic panels (Addendum No. 4, Item Nos. 14 and 15). $ 10,517.00 if Contractor is notified no later than 330 consecutive calendar days following the date of commencement. 1. Window treatment (Addendum No. 4, Item No. 16). $ 4,081.00 if Contractor is notified no later than 390 consecutive calendar days following the date of commencement. m. Chillers C-1 and C-2; Air Handling Units 3, 5, 8 and 10; Return Air Fans 1 and.2; and Unit Heaters UH -1 and UH -1 .(Addendum-No.4, Item 78). F$` .98;308;001 if Contractor notified no later than October 1, 1990. 51) • • • n. Steam Humidifiers H-3, H-5,.:11-8 and H-10 in Mechanical Roos 114 (Addendum No. 4, Item No. 19). • $ 2,036.00 if Contractor notified no later than October 1, 1990. o. Steam Boilers B-1 and B-2 and Domestic Hot Water Generator in Mechanical Room.114 (Addendum No. 4, Item No. 20). $ 28,297.00 if Contractor notified no later than August 31, 1990. p. Flexible connectors for chillers and pumps in Mechanical Room 114; Convertor .C -I and Unit Heaters UH -1 and UH -2 in Mechanical Room 114; and Expansion Tanks, Air Separators and Pumps P-2, P-3, P-4 and P-5 in Mechanical Room 114t(Addendurn No 4,_Item;No.;21) S "19,791:00'e if Contractor notified no later than October 1, 1990. q. Piping in Mechanical Room 114 and all plumbing fixtures in the building (Addendum No '4 _"Item Noi..22,and 23). $ 53,128.00 if Contractor notified no later than November 1, 1990. r. A11 sheet metal in Mechanical Room 114 and all _grilles, registers and diffusers throughout the building (Addendum No.. 4, Item Nos. 24 and 25). $ 51,689.00 . if Contractor notified no later than January 1, 1991. s. Mechanical insulation on piping,_,.. ductwork and equipment in Mechanical Room 114 tAddendum_No[ 4[1tem No."26)t $ 14,024.00 if Contractor notified no later than September 1, 1990. Automatic temperature controls '(Addendum_No.,_4,-.Item No..27); $ 172,359.00 if Contractor notified no later than September 30, 1990. • • u. Stage lighting control system (Addendum No. 4, Item No. 28). $ 226,240.00 .if Contractor notified no later than January 1, 1991. v. Emergency electrical generator (Addendum No. 4, Item No. 29). $ 12,194.00 if Contractor notified no later than December 31, 1990. w. Fire alarm equipment (Addendum No. 4, Item No. 30). $ 7,859.00 if Contractor notified no later than November 1, 1990. x. Lighting fixtures (Addendum No.4,-ttem No. -31)1 ;140,238.00 if Contractor notified no later than September 30, 1990. y. Access ramp covers, entry canopies and construction of solid masonry walls above_ elevation 57.0' including precast architectural copings "(Alternate. BidFNos, _4, Viand 5). $ 118,000.00 if Contractor is notified no later than 30 consecutive calendar days following the date of commencement. z. Asphalt concrete paving and installation of planting materials (Alternate Bid No. 3). $ 28,000.00 if Contractor is notified no later than 270 consecutive calendar days following the date of commencement. aa. Hydraulic elevator (Alternate Bid No. 2). $ 29,000.00 if Contractor is notified no later than 120 consecutive calendar days following the date of commencement. bb. Orchestra pit lift (Alternate Bid No. 1). $ 151,000.00 if Contractor is notified no later than 60 consecutive calendar days following the date of commencement. 5d P.O. Bok 3547 Fayetteville, Arkansas 72702 • Business: 501-443-9216 FAX: 501.443.6461 ARIS CENTER COUNCIL Stephen E. Adams Fayetteville Gerry Bomotti Fayetteville P. Elliott Burnside Springdale Sonja Decker Fayetteville Karen Dobbs Bella Vista D. Andrew Gibbs Fayetteville lames Gilbreath Fayetteville Bernard Madison Fayetteville Carol Peters Bella Vista Chalon Ragsdale Fayetteville Frank Sharp Fayetteville Shirley Stacy Bentonville Billie to Starr Fayetteville Nancy Van Poucke Siloam Springs . lane Waters Springdale Linda Wray Springdale E%ECUTWE DIRECTOR R. William Mitchell February 14, 1991 Mr. Jerry Cooper Staff Administrator City of Fayetteville 113 W. Mountain St. Fayetteville, AR 72701 RE: CHANGE ORDER NUMBER 3 WALTON ARTS CENTER Dear Jerry: Attached please find twenty (20) originals of Change Order No. 3 for the Walton Arts Center Project. This change order reinstates the canopy masonry, hardware, some plumbing, most of the mechanical system along with the temperature controls and the lights with related electrical work (Addendum No. 4, Items 1, 17, 18, 19, 21, 22, 24, 26, 27, 31, and Alternate No. 4). These were deleted originally to allow the contract to be awarded and are being added at this time with privately raised funds. The Arts Center Council has approved adding this change order at thistime with the funds to be taken out of the privately donated funds. This will require Scott Linebaugh's signature. Change Order No. 3 will also need the University of Arkansas' approval so please return this as soon as possible so I can forward this to the U of A for their approval. If you have any questions, please call. Sincerely,� /v Bob H. Kelly, JCA Construction Manager cc: Ron Cox, U of A