Loading...
HomeMy WebLinkAbout3-91 RESOLUTIONF RESOLUTION NO. 3-91 A RESOLUTION AUTHORIZING THE EXECUTION OF A CHANGE ORDER FOR THE CATO SPRINGS -HIGHWAY 71 WATER & SEWER UTILITY RELOCATION PROJECT. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute Change Order #5 with Don Mitchell, Inc. in the amount of $71506.28 for the Cato Springs - Highway 71 Water & Sewer Utility Relocation Project. A copy of the change order authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 2nd day of January , 1991. fi5l� n XS•ZireA*tf�' ZATTEST: 7,c'; t 7 _ , C z%CG®!7!ar- By .. 2 City erk: • • APPROVED: Mayor • .,' CHANCE OFFER PROJECT: (Name, Addre OWNER Q ENGINEER O CONTRACTOR CI OTHER Cl Utility Relocations at Relocated U.S. Hwy. 71 s) Fayetteville, AR TO CONTRACTOR: Don Mitchell, Inc. (Name, Addres5)883 White Oak Drive Rogers, AR immv CHANGE ORDER NO: Five (5) DATE: November 9, 1990 ENGINEER'S PROJECT N0: 88098.00 CONTRACT DATE:April 30, 1990 CONTRACT FOR: Water & Sewer Relocation The Contract is changed as follows: 1. Relocate Tom Morgan's Water Service Add (See Attached Sheet) 2. Relocate Robert Dowell's Water Service Add (See Attached Sheet) 3. Repair Highway Slope - Highway 265 Add (See Attached Sheet) 4. Drop Manhole Assembly - Line 4 Add 5. Fire Hydrant Assembly Add —lazee Attached Sheer) NOT VALID UNTIL SIGNED BY THE OWNER, ENGINEER AND CONTRACTOR $2,720.68 $ 640.00 $ 280.00 $1,790.60 $2,075.00 TOTAL ADD $7,506.28 The Net The The The The The original (Contract Sum) NIXakegDitlitatAtfliatil iRnifN) was $ 354,395.45 change by previously authorized Change Orders $ 26,850.16 (Contract Sus) ‘: prior to this Change Order was $ 381,245.61 (Contract Sus) 1 will be (increased) this Change Order in the amount of$ WAVY including (alialk , by new (Contract Sus) 7,506.28 this Change Order will be $ 388,751.89 ( 0 ) days. Contract Time will be (increased)(decreased)(unchanged) by date of Substantial Completion as of the date of the Change Order therefore is August 13, 1990 NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. Crafton, Tull & Associates ENGINEER P.O. Drawer ADDRESS 549 Rogers, AR 72757 BY I �%f "✓ DATE_ ////z/9 o Don Mitchell, Inc. CONTRACTOR 833 White Oak Drive ADDRESS Rogers, AR 72756 /wail S Il -fir -49 City of Fayetteville OWNER 113 West Mountain ADDRESS Fayetteville, AR 72701 CHANGE ORDER NO. FIVE UTILITY RELOCATIONS THE CITY OF FAYETTEVILLE FAYETTEVILLE, ARKANSAS CTA NO. 88098.00 ITEM NO. 1 Relocate Tom Morgan's Water Service: Material: 1" Corp. Stop $ 12.50 30' of 1" Copper Tubing at $1.60 $ 48.00 400' of 1-1/4" pipe size PVC tubing at $.84 $ 336.00 1" Copper & 1-1/4" Coupling $ 34.50 Two - 1-1/4" Dresser Coupling at $13.70 $ 27.40 13 Tons Base at $6.70 $ 87.10 Subtotal $ 545.50 Sales Tax $ 32.73. City will provide new meter box. Excavate and make 1" tap; locate corp. stop on existing service and salvage service; install meter at new location and lay approximately 400' of 1-1/4" PVC line; connect new to old service line; backfill ditch, taping pole and old meter pit; haul off excess material from driveway (Includes two moves but no seeding). Two Days Equipment (I.H.C. Hoe and Dozer; Dump & Pick-up; tools) $ 800.00 Labor $ 864.00 Supplies $ 50.00 Total Direct Cost $ 2,332.23 15% Overhead and Profit $ 349.83 Subtotal $ 2,682.06 Bond - 1.44% 38.62 TOTAL ITEM 1 $ 2,720.68 • FPI ITEM NO. TWO: Relocate Robert Dowell's Water Service: Material: Corp. Stop $12.50 (1.06) $ 13.25 Fertilizer seed and straw $ 17.49 Excavation Equipment 1/2 hour at $240/hr. $ 120.00 Backfill and Clean Up $ 46.25 Seeding Equipment $ 22.50 Labor $ 297.00 Fuel $ 20.00 Supplies $ 10.00 15% Overhead and Profit Bond - 1.44% Subtotal $ 546.49 $ 81.97 $ 628.46 $ 9.05 TOTAL ITEM 2 $ 640.00 ITEM NO. 3: Repair Highway Slope - Highway 265 damaged by uncapped waterline: Clean ditch, install material and repair hole: Equipment $ 121.25 Labor $ 102.60 Fuel and Supplies $ 15.00 Subtotal $ 238.85 15% Overhead and Profit $ 35.83 $ 274.68 Bond - 1.44% $ 5.32 TOTAL ITEM 3 $ 280.00 ITEM NO. 4: Drop Manhole Assembly - Line 4 ITEM NO. 5: Fire hydrant, 7.0 bury, including 12 x 6 reducer 6" valve &.12" & 6" retainer glands complete on Line 1 TOTAL ITEM 4 $ 1,790.60 TOTAL ITEM 5 $ 2,075.00