Loading...
HomeMy WebLinkAbout38-91 RESOLUTION• RESOLUTION NO. 38-91 A RESOLUTION AUTHORIZING CHANGE ORDER NO. 1 TO THE ENGINEERING CONTRACT WITH CEI ENGINEERING ASSOCIATES, INC. AND CHANGE ORDER NO. 1 TO CONSTRUCTION CONTRACT WITH APAC ARKANSAS- MCCLINTON ANCHOR DIVSION. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute Change Order No. 1 to the engineering contract of CEI Engineering Associates, Inc. in the amount of $1,045.00 and to the construction contract with McClinton Anchor Divsion of APAC Arkansas in the amount of $14,298.36 for the Armstrong Avenue Improvements project. A copy of the amendments to the contracts authorized for execution hereby is attached hereto and made a part hereof. z • PASSED AND APPROVED this 5th day of March , 1991. It APPROVED: ' 1 ATTEST: 9 By: J .-_. City Clgrk:�. Z ,i4` By: Mayor • 'O0O a a • dim. Oa INDUSTRIAL r r MMMMMM ONO POW, STATION ROAD PARR s V 0 am COMM( ORM • f m Anel m pv /em evil; ,00 rE • 11 AMENDMENT TO AGREEMENT FOR ENGINEERING SERVICES This is an amendment to the Agreement for Engineering Services executed on the 6th day of September, 1989 between the City of Fayetteville, Arkansas and CEI Engineering Associates, Inc. for the Armstrong Ave. Street construction. The City intends to increase the scope of the referenced agreement to include an additional length of street construction to the gate at Superior Wheel, the length being approximately 150 LE. CEI Engineering Associates, Inc. agrees to perform the professional engineering services for the design and construction of said additional length. Section B Compensation for Engineering Services from the referenced agreement shall be amended as follows: Part 1A: For professional services required to complete detailed plans and specifications for the above referenced project, including surveys for easement purposes, the CITY shall compensate the ENGINEER with the lump sum fee of (Five thousand six hundred eighty five dollars) $5,685.00 18: For professional services required to complete the preparation of easement documents and plats, the CITY shall compensate the ENGINEER with the lump sum fee of (Two thousand dollars) $2,000.00 Said amount to be adjusted to actual effort involved according to ENGINEERS standard hourly rate (27.50) for a Registered Land Surveyor Part 2 : For professional services for the bid phase of the project, through the recommendation of awards, the CITY shall compensate the ENGINEER with the lump sum fee of (One thousand dollars) $1,000.00 Part 3 : For professional services required to perform construction management including one full time inspector for the entire estimated construction period and preparation of "As -Built" drawings, the CITY shall compensate the ENGINEER with the lump sum fee of (Five thousand four hundred thirty five dollars) $5,435.00 Said amounts reflecting a proportional amount of a total increase of $1,045.00 (One thousand and forty-five dollars) in contract price. This amendment does not affect or alter any contract provision other than what is clearly stated herein. 4301AMDT/7s 1/9/91 ORDER NUMBER: DATE: 1/8/91 01 CHANGE ORDER AGREEMENT DATE: NAME OF PROJECT: Armstrong Ave. - Street Reconstruction OWNER: City of Fayetteville CONTRACTOR: APAC Arkansas McClinton Anchor Division The following changes are hereby made to the CONTRACT DOCUMENTS: Justification: Extending project approximately 150 LF to serve Superior Wheel in the Fayetteville Industrial Park. Change to CONTRACT PRICE: Original CONTRACT PRICE: $ 166,325.50 Current CONTRACT PRICE adjusted by previous The CONTRACT PRICE due to this CHANGE ORDER by: $ 14,298.36 The new CONTRACT PRICE due to Change to CONTRACT TIRE: The CONTRACT TIME will be (increased) mil€aNi€7d) The date for completion of all work will be CHANGE ORDER $ 166,325.50 will be (increased) (IDSOUK 4) this CHANGE ORDER will be $ 180,623.86 Approvals Required: To be effective this Change Order changes the scope or objective of the PROJECT, or required. by - 12 must be approved Requested by: Mr. Richard Shewmaker Recommended by: Mr. Sid Norbash, City of Fayetteville Ordered by: Mr. Mark Johnson, P.E. CEI Engineering Associates, Inc. calendar days. (Date). by the OWNER if it as may otherwise c/ Accepted by: Mr Jim Cole APAC Arkansas McClinton Anchor Division Owner: IC -1 AMENDMENT TO AGREEMENT FOR ENGINEERING SERVICES CHANGE ORDER NO. 1 This is an amendment to the Agreement for Engineering Services executed on the 6th day of September, 1989 between the City of Fayetteville, Arkansas and CEI Engineering Associates, Inc. for the Armstrong Ave. Street construction. The City intends to increase the scope of the referenced agreement to include an additional length of street construction to the gate at Superior Wheel, the length being approximately 150 LF. CEI Engineering Associates, Inc. agrees to perform the professional engineering services for the design and construction of said additional length. Section B Compensation for Engineering Services from the referenced agreement shall be amended as follows: Part 1A: For professional services required to complete detailed plans and specifications for the above referenced project, including surveys for easement purposes, the CITY shall compensate the ENGINEER with the lump sum fee of • (Five thousand six hundred eighty five dollars) $5,685.00 1B: For professional services required to complete the preparation of easement documents and plats, the CITY shall compensate the ENGINEER with the lump sum fee of (Two thousand dollars) $2,000.00 Said amount to be adjusted to actual effort involved according to ENGINEERS standard hourly rate (27.50) for a Registered Land Surveyor Part 2 : For professional services for the bid phase of the project, through the recommendation of awards, the CITY shall compensate the ENGINEER with the lump sum fee of (One thousand dollars) $1,000.00 Part 3 For professional services required to perform construction management including one full time inspector for the entire estimated construction period and preparation of "As -Built" drawings, the CITY shall compensate the ENGINEER with the lump sum fee of (Five thousand four hundred thirty five dollars) $5,435.00 Said amounts reflecting a proportional amount of a total increase of $1,045.00 (One thousand and forty-five dollars) in contract price. This amendment does not affect or alter any contract provision other than what is clearly stated herein. (SEAL) 4.0 i: --FST r 'S4 rte' . —j, mis i 4-¢- J 3. ='Type Name a iI. ll Sherrw ers �' 2 `, ,:Title=�.`Cityfi * k .r. ilj.. ' i„ �` t 0 (SEAL) ATTEST Thomas Type Name David Sbanotto By Type Name k. TitleAsst. Mayor Date CITY: By Type Name Robert E. Holmes, P.E. Title Construction Technician Title Principal Date 3-6—q/ CITY: i:A(ween 4301AMDT/js 3/6/91