Loading...
HomeMy WebLinkAbout200-91 RESOLUTION• • • • RESOLUTION NO. 200-91 A RESOLUTION AUTHORIZING A CONTRACT AMENDMENT WITH RJN ASSOCIATES FOR THE ILLINOIS RIVER SEWER SYSTEM STUDY FOR ADDITIONAL MONITORING AND TELEVISING. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute a contract amendment in the amount of $61,929 for the Illinois River Sewer System Study for additional monitoring and televising. A copy of the contract authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 5th day of November , 1991. APPROVED: ATTEST: By : �hh �J /• p ,fYvt or City Cl rk By: 1� May r • Amendment No. 1. WHEREAS, on the fifth day of March, 1991 the City of Fayetteville, Arkansas and RJN Environmental Associates, Inc. made and entered into a contract for Engineering Services to perform a Sewer Study for the Illinois River Watershed and WHEREAS, it has become necessary to expand the engineering service contract covering the Sewer System Study and WHEREAS, the City of Fayetteville and RJN Environmental Associates, Inc. desire to amend said Contract, so as to include therein the necessary scope of work; NOW THEREFORE, KNOW ALL MEN BY THESE PRESENTS: That the City of Fayetteville, a municipal corporation situated in Washington County, Arkansas, hereinafter called "City" and RJN Environmental Associates, Inc. hereinafter called "Engineer", hereby make and enter into the following agreement: 1. The March 5, 1991, contract between the City of Fayetteville, Arkansas and RJN Environmental Associates, Inc. is hereby amended to include additional services required to complete the Sewer System Study of the Illinois River Watershed. The additional services are as follows: 1. Based on field conditions that differed from the sanitary sewer maps, add seven (7) additional temporary flow meters to monitor flow in the wastewater collection system. 2. Based on field conditions, provide an additional 10,500 linear feet of television inspection to identify specific sources of I/I in the wastewater collection system. The contract entered into on March 5, 1991 is hereby amended by increasing the cost not to exceed ceiling in Section IV, Fees and Payments, to $562,540.00. A breakdown by unit cost for the amendment is as follows: 1. Continuous Flow Metering (7 sites for 60 days) 2. TV Inspection (10,500 linear feet) -1- $ 77.70/m -d $32,634.00 $ 2.79/LF $29,295.00 Total $61,929.00 2. All other provisions, covenants, recitals, terms and conditions of the Contract, which are not expressly amended herein, shall remain in full force and effect. IN WITNESS WHEREOF, the parties have executed this agreement in triplicate originals on this date, the 5th day of Nnvpmhpr A.D. 1991. For the Owner: For the Engineer: City of Fayetteville RJN Environmental Associates, Inc. Name NameAiniF in / Title Title ttest -2-