HomeMy WebLinkAbout179-91 RESOLUTION•
•
•
•
•
•
•
RESOLUTION NO. 179-91
A RESOLUTION AUTHORIZING A CONTRACT TO
SUNSHINE SERVICES FOR PAVEMENT CRACK SEAL,
PATCHING, EMULSION SEALING AND REMARKING OF
VARIOUS AREAS OF THE AIRPORT AND APPROVAL OF A
BUDGET ADJUSTMENT.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the Mayor and City Clerk are hereby
authorized and directed to execute a contract to Sunshine Services
in the amount of $50,516.00. A copy of the contract authorized for
execution hereby is attached hereto marked Exhibit "A" and made a
part hereof.
Section 2, The Board of Directors hereby approves a budget
adjustment in the amount of $27,100.72 from State Grant Revenue,
Acct. No. 555-955-6-805.00 into Building Costs, Acct. No. 555-393-
5-804.00. A copy of the budget adjustment is attached hereto and
made a part hereof.
PASSED AND APPROVED this 1st day of October , 1991.
APPROVED:
By
ATTEST:
By
,11
•
•
•
CONTRACT FOR PAVEMENT CRACK SEAL AND REPAIRS
This agreement made the 1st day of October, 1991, by and between
Sunshine Services. Inc. hereinafter called "Contractor" and the City of
Fayetteville, hereinafter called the "City" shall be utilized to provide the
following services:
The Contractor hereby agrees to provide repair and pavement
construction, labor and materials for the Fayetteville Municipal Airport in
accordance with exhibit "A", the bid documents and specifications for this
work, at total amount "not to exceed" $50,516. This project is to be
considered a "turn key" job and shall include all items and provisions set
forth in the bid specifications attached hereto and made a part hereof.
The project time frame shall coincide with the number of days stated in
the bid documents which were submitted to the Purchasing Officer. Liquidated
damages of $50 per day shall be assessed at the option of the City, and not
a penalty, beginning on the first day following the completion time entered
on this bid.
If the bid exceeds $10,000, the Terms and Standard Conditions of the
City of Fayetteville expressed in item 19. A/B/C shall be considered a
binding part of this agreement and shall be provided by the Contractor. It
is understood by both parties that a State Grant is necessary for the
project, and should funding not occur, this contract is considered null and
void.
A 10% retainage of the total project bid shall be held by the City until
the project has been completed and 15.51;lot, by the :gat,
CONTRACTOR:
ATTEST:
�
CITY OF FAYE EVILLE
ATTEST:
•
•
CITY OF FAYETTEVILLE, ARKANSAS
IN—YEAR BUDGET ADJUSTMENT
ADJUSTMENT #
BUDGET YEAR
1991
DIPT* Airpo t
PROG: 393 Capital
DATE REQUESTED
9/13/91
PROJECT OR ITEM REQUESTED: Additional funds for
pavement crack sealing/patching/emulision sealing and
re -marking.
INCREASE
ACCOUNT TITLE
Building Costs
ACCOUNT NUMBER
555-393-5-804.00
JUSTIFICATION OF THIS INCREASE A State Grant was
requested and received so that the scope of the work AMOUNT
might be increased. The additional cost will be funded
by this $27,100.72 Grant. $27,100.72
NOTE: No additional cost above the City budgeted expense
will be incurred due to the increase of this project. DECREASE
PROJECT OR ITEM DELETED:
N/A
JUSTIFICATION OF THIS DECREASE
N/A
ACCOUNT TITLE
State Grant Revenue
ACCOUNT NUMBER
555-955-6-805.00
AMOUNT
$27,100.72
DATE
REQUESTED BY:
BUDGET OFFICE USE ONLY
DATE OF APPROVAL
..BY.. Date
Entered
Posted
ADMINe SERVICES DIR:
61-4(rGl 1 Type:
CI�PY AGER:
I /
I) yr
A BCD E
Total program adjustments to date:
$
CHANGE ORDER #1 TO SUNSHINE SVC. CO. CONTRACT
OWNER: City of Fayetteville
113 W. Mountain Street
Fayetteville, Ar 72701
PROJECT: Crack-seal/patching/coal tar emulsion
Pavement Maintenance Project
Fayetteville Municipal Airport
CONTRACTOR: Sunshine Service Co.
2340 Perry Road
Rogers, AR 72756
THE FOLLOWING CHANGES TO THE CONTRACT ARE HEREBY ORDERED:
Install all necessary base material, level -up and a 2 inch hot mix
asphalt overlay necessary to provide a 65 foot long, by 20 foot
wide paved drive area to support the vehicle loads utilizing the
drive.
The price of $1,575 includes all material, labor and equipment to
complete this work. The work is to be performed by McClinton
Anchor, who is acting as the patching sub -contractor for all the
patch work included in the crack-seal/patching/coal tar emulsion
pavement maintenance project.
ORIGINAL CONTRACT AMOUNT: $50,516
CHANGE ORDER #1 AMOUNT: $1,575
REVISED CONTRACT AMOUNT: $52,091
CONTRACTOR:
Sunshine Service Company
Qi lanai
BY:
OWNER
City of Fayetteville
BY:
DATE:
DATE: lUil6/q/
•
•
•
•
•
PROJECT
CITY OF FAYETIEVTU E
CONTRACT/LEASE REVIEW A
lrv, C/ / Ch/iG ¢ t cc -intik -J.)4 l l 3 rte Ci?yef I
�) Airport
AC t K UIVISIUN/lltYAK I MLN
Su f3k• c.. £ �.
h' • c.
Please,evie jibe attached contract/lease between
and l
4tirrm
ey Dr Comments
10-16-`i 1
Finance u rreect r bate Comments
p�rc onager
i{Ud Coordinator
u i or
Comments
Comments
Comments
• • .4' • -I • • •fl AGER • • • SIGNATED PERSON
WHEN THE REVIEW PROCEDURE HAS BEEN COMPLETED.
FAYETTEVILLE
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
TO: Scott C. Linebaugh, City Manager
FROM: Dale Frederick, Airport Manager
DATE: October 10, 1991
SUBJECT: CHANGE ORDER 11 TO SUNSHINE SVC. CO. CONTRACT
Attached for your review and approval is change order 11 to the
above referenced contract. In reviewing the project at the pre -
construction conference held 10-10-91, a problem was identified
with the service drive behind the aircraft maintenance hangar.
This is a gravel drive that receives extensive use from the
employees. This traffic creates a foreign object damage hazard by
the gravel that is tracked onto the aircraft movement ramp.
This change order will allow a 65 foot long, by 20 foot wide 2 inch
hot mix asphalt overlay to be placed in this area for vehicle use,
thus eliminating the tracking problem. The price of $1,575
includes a base level up and adding any additional base necessary
to support the vehicle loads utilizing the drive. The work is to
be performed by McClinton Anchor, who is acting as the patching
sub -contractor for all the patch work included in the crack-
seal/patching/coal tar emulsion pavement maintenance project.
Sufficient funds exist in the line item to complete the work. The
budget is $55,350.72, the existing contract total is $50,516.
I recommend that since the price will allow the project to remain
within budget, alleviate the clean-up problem, and enhance aircraft
safety that this change order be approved.
Should you have any questions, or require additional information,
please do not hesitate to contact this office.
Attachments: Original Change Order #1
Contract review sheet