HomeMy WebLinkAbout153-91 RESOLUTION•
RESOLUTION NO. 153-91
A RESOLUTION AUTHORIZING AN ENGINEERING
CONTRACT WITH MILHOLLAND ENGINEERING COMPANY
FOR THE 1991 STREET OVERLAY PROJECT.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the Mayor and City Clerk are hereby
authorized and directed to execute a contract with Milholland
Engineering Company in the amount not to exceed $24,000.00 for the
1991 street overlay project engineering services. A copy of the
contract authorized for execution hereby is attached hereto marked
Exhibit "A" and made a part hereof.
PASSED AND APPROVED this 20th day of August , 1991.
ATTEST:
By:
City C erk
40�
APPROVED:
By:
-,70/‘attV
Mayor
nnvrrwu t
P4 IP dr
soars
4
•
•
1
ENGINEERING SERVICES AGREEMENT
1991 OVERLAY PROGRAM
STREET AND DRAINAGE IMPROVEMENTS
1 VARIOUS LOCATIONS 1
E-312
THIS AGREEMENT, made and entered into this 20th day of
August , 1991, by and between the City of Fayetteville,
Arkansas, hereinafter referred to as the "Owner", and Milholland
Company, Engineering and Surveying, Consulting Engineers of
Fayetteville, Arkansas, hereinafter referred to as the
"Engineer",
WITNESSED THAT:
WHEREAS, the Owner desires to Construct certain structural and
drainage improvements to extend the life of various streets
within the City of Fayetteville.
WHEREAS, the Engineer has sufficient experienced personnel and
equipment to perform the work described in this Agreement,
NOW THEREFORE, in consideration of the mutual covenants and
agreements herein contained, the Owner and the Engineer, the
parties hereto, stipulate and agree that the Owner does hereby
employ the Engineer to perform the required engineering services
as hereinafter set out; and the Engineer agrees to provide said
services.
5-312 1.
EXHIBIT A
•
•
SECTION 1: DESCRIPTION OF PROJECT:
The Projects for which engineering services are to be provided
are known and specified as "1991 OVERLAY PROGRAM". The PROJECT
consists of segments of Streets within the City of Fayetteville
which are defined in EXHIBITS attached hereto, as follow:
EXHIBIT "A": 1991 OVERLAY PROGRAM.
The project is generally described as follows:
VARIOUS STREET SEGMENTS: Design, Construction Documents, Taking
Bids and Construction Supervision for the RECONSTRUCTION and/or
UPGRADING of various street widths with storm drainage, french
drains and sidewalks within existing street right-of-ways,
consisting of subgrade and base repair, grading, milling and hard
surface pavement per City of Fayetteville street specifications;
Assist the City of Fayetteville Public Works Department in
requesting and evaluating Bids, make recommendations of Award of
Construction Contract, Construction Management and monthly Pay
Estimates to Contractor.
Engineering Services for said project shall be separated into
three (3) parts as follows:
PART I:
PART I -A:
PART I -B:
PART II:
PART III:
"Engineering Design and Construction Documents"
"Right -of -Way Acquisition"
"Exploration of Existing Street Sections
"Taking bids through Award of Contract"
"Construction Management"
SECTION 2: SCOPE OF ENGINEERING SERVICES:
The Engineer shall provide a suitable staff to perform Basic
Engineering Services, Bid Documentation and Construction
Management, including necessary resident inspection, and as extra
items, Right -of -Way Plats and Descriptions and Exploration of
Existing Street Sections. These various types of work are more
specifically defined as follows:
PART I: BASIC ENGINEERING SERVICES:
111 Make field engineering surveys of the various sites to
establish the data necessary for the preparation of plans and
specifications in order to build the contemplated improvements.
The field engineering surveys shall include the location of all
existing utilities within street Right -of -Ways as best can be
located without excavation.
[2] Prepare a preliminary overall design and cost estimate and
review same with the Owner prior to final design.
2.
•
(3) Prepare plans and specifications for the proposed
improvements. The plans shall show the location of the street
centerlines, unless otherwise approved. Engineer shall provide
Owner with two (2) complete sets of the plans and specifications.
(41 Meet with representatives of all involved utility companies
and governmental agencies to coordinate the overall project.
(51 Advise the Owner when soils investigations and Exploration
of existing street sections are required. The costs related
soils investigations and the street explorations shall be borne
by the Owner as stipulated in PART I -B.
(61 Prepare construction cost estimates.
PART I -A: RIGHT-OF-WAY ACQUISITION:
Only work as directed by the Owner shall be done under this
section of the contract. The total fee shall not exceed $300.00
per Right -of -Way Plat and Description.
FART I -B: EXPLORATION OF EXISTING STREET SECTIONS:
Advise the Owner as to soils investigations and Exploration of
existing street sections that might be required and assist in the
coordinating of the same. The costs of services related the
soils investigations and street explorations shall be borne by
the Owner.
PART I: SCHEDULE:
All of the above described work shall be completed in such time
that the Owner may receive Construction Plans and Specifications
within 30 calendar days after the Engineer receives a "Notice to
Proceed" on the project. Time is expressly made of the essence
of this Agreement.
PART II: TAKING BIDS THROUGH AWARD OF CONTRACT:
Work to be performed under this item shall consist of the
following:
(11 Assist the Owner in the advertising for and receiving of
construction bids, including recommendation of construction
contract award.
E 312 3
•
•
•
PART III: CONSTRUCTION MANAGEMENT:
Under this Phase, the Engineer will perform the following items
of work:
[1] Provide for periodic visits to the job sites by a
professional engineer to observe the overall progress and quality
of executed work.
[2) Provide for necessary resident inspection of the project
construction.
[3] Provide a survey crew to lay out the project for con-
struction, excluding any necessary land and Right -of -Way surveys.
[4] Provide a project engineer to manage and coordinate the
construction activities.
[5] Provide other personnel
engineering technicians, etc.,
project engineer in the various
such as secretaries, draftsmen,
as may be needed to assist the
activities that may be required.
[61 Prepare monthly partial payment estimates and a final
payment estimate to the contractor, including the assembly of
written guarantees which are required by the contract documents.
[71 Provide for final inspection of the project in the company
of representatives of the Owner, the project engineer, a repre-
sentative of the contractor, and any other party designated by
the Owner.
Payments for the above described work shall be made on an hourly
basis as further defined in Section 3 of this contract.
a2. 4
•
SECTION 3. COMPENSATION:
Compensation for the various types of services to be provided
under this contract shall be made as follows:
A. PART I: BASIC ENGINEERING SERVICES:
Compensation for PART I, Basic Engineering Services, shall be a
LUMP SUM FEE in the amount of $16,500.00.
PART I -A: RIGHT-OF-WAY ACQUISITION:
Compensation for PLATS AND DESCRIPTIONS for Additional street and
drainage Right -of -Ways shall be based on the hours of work
actually required. The rates to be charged for the various
classifications of personnel shall be identical to those set out
under Section 3-D below.
Only work as directed by the Owner shall be done under this
section of the contract. The total fee shall not exceed $300.00
per easement. Five parcels are estimated at $1,500.00.
PART I -B: EXPLORATION OF EXISTING STREET SECTIONS:
Compensation for soils investigations and street section explora-
tions shall be based on the following;
1. Engineering Services rendered shall be the hours of work
actually required to supervise and coordinate the
operations for said investigations and explorations.
The rates to be charged for the various classifications
of personnel shall be identical to those set out under
Section 3-D below.
2 Services rendered by others, such as, a Laboratory for
Soils and Materials Testing or a Construction
Contractor's Backhoe or Coring equipment, shall be "AS
INVOICED" by said Laboratory or Contractor.
B. PART II: BIDS THROUGH AWARD OF CONTRACT:
Compensation for "Advertisement for Bids" through "Award of
Contract" shall be a Fixed Fee of $1,000.00 for each bidding
process.
E-312
C. PART III: CONSTRUCTION MANAGEMENT:
Compensation for Construction Management Services described in
SECTION 2, PART III, shall be based on the actual hours of the
various classifications of employees that may be necessary to
perform the work, with a MAXIMUM -NOT -TO -EXCEED compensation of
$5,000.00, so long as the total construction time is 45
Consecutive Calendar Days, or Less, from the date of the "Notice -
To -Proceed" to the Construction Contractor. The rates to be
charged for the various classifications of personnel shall be
identical to those set out under Section 3-D below.
D. HOURLY RATES FOR VARIOUS CLASSIFICATIONS OF PERSONNEL:
The hourly rates to be charged for the various classifications of
personnel are set out below:
HOURLY RATE PER CLASSIFICATION:
Professional Engineer
Registered Land Surveyor
Engineering Aide
Secretary
Survey Crew
Resident Inspector
Draftsman
Computer w/Operator
Travel
$65.00
$45.00
$55.00
$18.00
$65.00
$30.00
$25.00
$35.00
$00.25
per
per
per
per
per
per
per
per
per
hour
hour
hour
hour
hour
hour
hour
hour
mile
The hourly rates shown above include total compensation to the
Engineer for all expenses for said services described in SECTION
2, PART III above.
E. SUMMARY OF ENGINEER'S COMPENSATION:
PART I
PART IA
PART II
PART III
$16,500.00
$ 1,500.00
$ 1,000.00
$ 5,000.00
TOTAL
$24,000.00
E. METHOD OF PAYMENT:
Partial payments to the Engineer shall be made monthly as long as
the accumulative of payments do not exceed the following:
111 PART I: Basic Engineering Services:
Sixty-five percent (65%) upon completion of field
engineering surveys and preliminary design.
Thirty-five percent (35%) upon completion of final plans
and specifications and submittal to the Owner.
(21 PART I -A: RIGHT-OF-WAY PLATS AND DESCRIPTIONS:
Payment to be made upon completion of the various
items of work as directed by the Owner.
[3] PART I-8: EXPLORATION OF EXISTING STREET SECTIONS:
Payment to be made on a monthly basis during the Design
Phase upon the completion of various items of works.
(31 PART II: BIDS THROUGH AWARD OF CONTRACT:
90% after opening BIDS, and
108 after Award of Construction Contract.
(41 PART III: CONSTRUCTION MANAGEMENT:
Payment to be made on a monthly basis during the
construction phase.
•
SECTION 4. GENERAL CONSIDERATIONS
A. Termination of Contract for Cause
If, through any cause, the Engineer shall fail to fulfill in
timely and proper manner his obligations under this contract, or
if the Engineer shall violate any of the covenants, agreements,
or stipulations of the contract, the Owner shall thereupon have
the right to terminate this contract by giving written notice to
the Engineer of such termination and specifying the effective
date thereof, at least five (5) days before the effective date of
such termination. In such event, all finished or unfinished
documents, data, studies, and reports prepared by the Engineer
under this contract shall, at the option of the Owner, become its
property, and the Engineer shall be entitled to receive lust and
equitable compensation under this contract for any satisfactory
work completed on such documents.
Notwithstanding the above, the engineer shall not be relieved of
liability to the owner for damages sustained by the Owner by
virtue of any breach of the contract by the Engineer, and the
Owner may withhold any payments to the Engineer for the purpose
of set off until such time as the exact amount of damages due the
Owner from the Engineer is determined.
B. Termination for Convenience of Owner
The Owner may terminate this contract any time by a notice In
writing from the Owner to the Engineer. If the contract is
terminated by the Owner as provided herein, the Engineer will
receive just and equitable compensation under this contract.
C. Changes
The Owner may from time to time request changes in the scope of
the services of the Engineer to be performed hereunder. Such
changes, including any increase or decrease in the amount of the
Engineer's compensation, which are mutually agreed upon by and
between the Owner and the engineer, shall be incorporated in
further written amendments to this contract.
D. Personnel
(11 The Engineer represents that he has, or will secure at his
own expense, all personnel required in performing the services
under this contract. Such personnel shall not be employees of or
have any contractual relationship with the Owner.
(2] All the services required hereunder will be performed by the
Engineer or under his supervision and all personnel engaged in
the work shall be fully qualified and shall be authorized or
permitted under state and local law to perform such services.
(33 No person who is serving sentence in a penal or correctional
institution shall be employed on work under this contract.
E . Compliance with Local Laws
The Engineer shall comply with all applicable laws, ordinances,
and codes of the state and local governments and shall commit no
trespass on any public or private property in performing any of
the work embraced by this contract.
F. Assignability
The Engineer shall not assign any interest in this contract and
shall not transfer any interest in the same (whether by
assignment or novation) without the prior written approval of the
Owner; provided, however, that claims for money due or to become
due the Engineer from the Owner under this contract may be
assigned to a bank, trust company, or other financial
institution, or to a trustee in bankruptcy, without such
approval. Notice of any such assignment or transfer shall be
furnished promptly to the Owner.
G . Access to Records
The Owner, the U.S. Department of Housing and Urban Development,
the Comptroller General of the United States, or any of their
duly authorized representatives, shall have access to any books,
documents, papers, and records of the Engineer doing work under
this contract which are directly pertinent to a specific grant
program for the purpose of making audits, examinations, excerpts,
and transcriptions.
H . Estimates
S ince the Engineer has no control over the cost of labor,
materials or equipment, or over the methods of determining
prices, or over competitive bidding or market conditions, the
estimates of costs provided are to be made on the basis of the
Engineer's experience and qualifications and represent his best
judgment, being familiar with the industry, but the Engineer
cannot and does not guarantee that established costs will not
vary from estimates prepared.
I. Insurance
The Engineer shall secure and maintain such insurance as will
protect him from claims under the Workmen's Compensation acts and
from claims for bodily injury, death or property damage which may
arise from the performance of his services under this contract.
p-312 9
•
J. Successors and Assigns
Each party of this contract binds himself and his partners,
successors, executors, administrators and assigns to the other
party of this contract in respect to all covenants of this
contract. Neither party shall assign, sublet or transfer his
interest in this contract without the written consent of the
other.
SECTION 5. EQUAL OPPORTUNITY PROVISIONS
During the performance of this contract, the Engineer agrees as
follows:
(Al The Engineer will not discriminate against any employee or
applicant for employment because of race, color, religion, sex,
or national origin. The Engineer will take affirmative action to
ensure that applicants are employed, and that the employees are
treated during employment, without regard to their race, color,
religion, sex,or national origin. Such action shall include, but
not be limited to the following: employment upgrading,
demotion,or transfer, recruitment or recruitment advertising;
layoff or training, including apprenticeship. The Engineer
agrees to post in conspicuous place, available to employees and
applicants for employment, notices to be provided by the
Contracting Officer setting forth the provisions of this
nondiscrimination clause.
[H] The Engineer will, in all solicitations or advertisements
for employees placed by or on behalf of the Engineer, state that
all qualified applicants will receive consideration for
employment without regard to race, color, religion, sex, or
national origin.
1
SECTION 6. CONFLICT OF INTEREST
(Al Interest of Owner
No officer, employee, or agent of the Owner who exercises any
functions or responsibilities in the review or approval or in
connection with the carrying out of the project to which this
contract pertains shall have any personal interest, direct or
indirect, in this contract.
[H] Interest of Certain Federal Officials
No member of or delegate to the Congress of the United States,
and no Resident Commissioner, shall be admitted to any share or
part of this contract or to any benefit to arise herefrom.
[C] Interest of Engineer
The Engineer covenants that he presently has no interest and
shall not acquire any interest, direct or indirect, in the above
described project area or any parcels therein or any other
interest which would conflict in any manner or degree with the
performance of his services hereunder. The Engineer further
covenants that in the performance of this contract, no person
having any such interest shall be employed.
SECTION 7. OTHER PROVISIONS
In connection with the project, the Owner shall:
[A] Give thorough consideration to all documents presented by
the Engineer and inform the Engineer of all decisions within a
reasonable time so as not to delay the work of the Engineer.
[B] Make provision for the employees of the Engineer to enter
public and private lands as required for the Engineer to perform
necessary preliminary surveys and investigations.
[C] Obtain the necessary lands, easements, and Right -of- Ways
for the construction of the work.
[D] Furnish the Engineer such plans and records of construction
and operation of existing facilities, or copies of same, bearing
on the proposed work as may be in the possession of the Owner.
Such documents or data will be returned to the Owner upon
completion of the work or upon the request of the Owner.
[E] Pay the cost of making necessary soundings, borings,
analyses of materials and laboratory work performed by an
Independent Certified Materials Lab exclusive of the Engineer's
supervision thereof.
[F] Pay all plan review costs and all cost of advertising in
connection with the project.
Original documents, plans, design, and survey notes represent the
product and training, experience, and professional skill, and
accordingly belong to and remain the property of the Engineer who
produced them regardless of whether the instruments were
copyrighted or whether the project for which they were prepared
is executed.
The Engineer shall furnish the Owner two copies of "as -built"
drawings of each phase of the project at his expense; and the
Owner may, at his expense, retain reproducible copies of drawings
and copies of other documents.
This agreement shall be binding upon the parties hereto, their
partners, heirs, successors, administrators, and assigns; and
neither party shall assign, sublet or transfer his interest in
this agreement without the prior written consent of the other
party hereto.
312
IN WITNESS WHEREOF, the Owner has caused these presents to be
executed in its behalf by its duly authorized representatives,
and the said Engineer by its duly authorized representatives, and
the parties hereto have set their hands and seals on the date
heretofore set out.
CITY OF FAYETTEVILLE, ARKANSAS
City Clerk!
MILHOLLAND COMPANY
Attest:
Melvin L. Milholland, Owner
Secretary
•
Date: Aug. 20 , 1991
Date: Aug. 20 , 1991
— J414o!land
SMUT No.;
1.
2.
3.
4.
5.
4iyiiuurrzr and fueoajing
205 WEST CENTER
FAYETTEVILLE. ARKANSAS 72701
(501) 443-4724
MINT °A": 1991 OVIRLAY PROGRAM
STREET NAME: FROM
Hyland Park Rock Cliff - Dead End
Weat End Ave. Wedington - Valley Dr.
Valley Drive Weat End - Mid. Lot 27
Lisa Lane Mission - - - Dead End
Lakeridge Dr. Edgehill - - North Str.
AR. R.L.S. NO. 648
AR. P.E. NO. 3825
OKLA. P.E. NO. 10740
OKLA. R.L.S. NO. 1038
TO; LENGTH.
770
430
480
1380
2240
LF:
L .F.
L .F.
L .F.
L .F.
L .F.
•
•
•
•
ENGINEERING SERVICES AGREEMENT
1991 OVERLAY PROGRAM
STREET AND DRAINAGE IMPROVEMENTS
i VARIOUS LOCATIONS 1
E-312
THIS AGREEMENT, made and entered into this 20th day of
August , 1991, by and between the City of Fayetteville,
Arkansas, hereinafter referred to as the "Owner", and Milholland
Company, Engineering and Surveying, Consulting Engineers of
Fayetteville, Arkansas, hereinafter referred to as the
"Engineer",
WITNESSED THAT:
WHEREAS, the Owner desires to Construct certain structural and
drainage improvements to extend the life of various streets
within the City of Fayetteville.
WHEREAS, the Engineer has sufficient experienced personnel and
equipment to perform the work described in this Agreement,
NOW THEREFORE, in consideration of the mutual covenants and
agreements herein contained, the Owner and the Engineer, the
parties hereto, stipulate and agree that the Owner does hereby
employ the Engineer to perform the required engineering services
as hereinafter set out; and the Engineer agrees to provide said
services.
E-312
•
•
SECTION 1: DESCRIPTION OF PROJECT:
The Projects for which engineering services are to be provided
are known and specified as "1991 OVERLAY PROGRAM". The PROJECT
consists of segments of Streets within the City of Fayetteville
which are defined in EXHIBITS attached hereto, as follow:
EXHIBIT "A": 1991 OVERLAY PROGRAM.
The project 1s generally described as follows:
VARIOUS STREET SEGMENTS: Design, Construction Documents, Taking
Bids and Construction Supervision for the RECONSTRUCTION and/or
UPGRADING of various street widths with storm drainage, french
drains and sidewalks within existing street right-of-ways,
consisting of subgrade and base repair, grading, milling and hard
surface pavement per City of Fayetteville street specifications;
Assist the City of Fayetteville Public Works Department in
requesting and evaluating Bids, make recommendations of Award of
Construction Contract, Construction Management and monthly Pay
Estimates to Contractor.
Engineering Services for said project shall be separated into
three (3) parts as follows:
PART I:
PART I -A:
PART I -B:
PART II:
PART III:
"Engineering Design and Construction Documents"
"Right -of -Way Acquisition"
"Exploration of Existing Street Sections
"Taking bids through Award of Contract"
"Construction Management"
SECTION 2: SCOPE OF ENGINEERING SERVICES:
The Engineer shall provide a suitable staff to perform Basic
Engineering Services, Bid Documentation and Construction
Management, including necessary resident inspection, and as extra
items, Right -of -Way Plats and Descriptions and Exploration of
Existing Street Sections. These various types of work are more
specifically defined as follows:
PART I: BASIC ENGINEERING SERVICES:
[1] Make field engineering surveys of the various sites to
establish the data necessary for the preparation of plans and
specifications in order to build the contemplated improvements.
The field engineering surveys shall include the location of all
existing utilities within street Right -of -Ways as best can be
located without excavation.
[2] Prepare a preliminary overall design and cost estimate and
review same with the Owner prior to final design.
E-312 2
•
•
•
[31 Prepare plans and specifications for the proposed
improvements. The plans shall show the location of the street
centerlines, unless otherwise approved. Engineer shall provide
Owner with two (2) complete sets of the plans and specifications.
[41 Meet with representatives of all involved utility companies
and governmental agencies to coordinate the overall project.
[51 Advise the Owner when soils investigations and Exploration
of existing street sections are required. The costs related
soils investigations and the street explorations shall be borne
by the Owner as stipulated in PART I -B.
(61 Prepare construction cost estimates.
PART I -A: RIGHT-OF-WAY ACQUISITION:
Only work as directed by the Owner shall be done under this
section of the contract. The total fee shall not exceed $300.00
per Right -of -Way Plat and Description.
PART I -B: EXPLORATION OF EXISTING STREET SECTIONS:
Advise the Owner as to soils investigations and Exploration of
existing street sections that might be required and assist in the
coordinating of the same. The costs of services related the
soils investigations and street explorations shall be borne by
the Owner.
PART I: SCHEDULE:
All of the above described work shall be completed in such time
that the Owner may receive Construction Plans and Specifications
within 30 calendar days after the Engineer receives a "Notice to
Proceed" on the project. Time is expressly made of the essence
of this Agreement.
PART II: TAKING BIDS THROUGH AWARD OF CONTRACT:
Work to be performed under this item shall consist of the
following:
[11 Assist the Owner in the advertising for and receiving of
construction bids, including recommendation of construction
contract award.
E-312 3