HomeMy WebLinkAbout124-91 RESOLUTION• RESOLUTION NO. 124-91 A RESOLUTION AUTHORIZING CHANGE ORDER NO. 11 FOR THE WALTON ARTS CENTER PROJECT. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute Change Order No. 11 in the amount of $356,582.00 for the Walton Arts Center Project to provide construction and/or installation of the sound system, window treatment, stage lighting control, generator, fire alarm, structural items, and chair lift site. A copy of the change order authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this .SATTEST : tY.a city Cl rte: 1 > f 4,1=4 • 2nd day 'of July APPROVED: //V • 1991. AGENDA REQUEST For the Board meeting of July 2, 1991 FRON: Terry W. Cooper City Manager General Administration Name Division Department BOARD ACTION REQUESTED: A resolution approving Change Order No. 11 for the Walton Arts Center Project. COST TO CITY: -0- Cost of this request % of Program completed BUDGET REVIEW: Line item budgeted amount Account name Funds used to date Account Number Remaining balance Budgeted Item Budget Adjustment Attached Budget Coordinator Administrative Services Director CONTRACT/LEASE REVIEW: Finance Director City Attorney Purchasing Officer Internal Auditor STAFF RECC3WWNDATION: Date Date Date Date GRANT APPLICATION REVIEW: Internal Auditor Date Approval of Change Order No. 11 for the Walton Arts Center Project. This Change Order reinstates the sound system, window treatment stage lighting control, generator, fire alarm, structural items, and chair lif site work. This Change Order will be funded by private fun mmiotr ter-- 3une-18, 1991 on I Dem nt Director Mill Date Date Adminis rative Services Director Date ARTS CENTER COUNCIL Stephen E. Adams Fayetteville Gerry Bomotti Fayetteville P. Elliott Burnside Springdale Sonja Decker Fayetteville Karen Dobbs Bella Vista D. Andrew Gibbs Fayetteville lames Gilbreath Fayetteville Bernard Madison Fayettevi Ile Carol Peters Bella Vista Chalon Ragsdale Fayetteville Frank Sharp Fayetteville Shirley Stacy Bentonville Billie lo Starr Fayetteville Nancy Van Route Siloam Springs lane Waters Springdale Linda Wray Springdale I✓" REGIONAL FUNDRAISING COMMITTEE Helen Walton. Honorary Chair Bentonville Billie Jo Starr. Chair fayelteville Jim Blair Fayetteville Jack Dunn Fayetteville Juanita Dunn Fayetteville William Enfield • Benlonvil le Willard Gatewood Fayetteville Ellen Hayward Fayetteville Malcolm Hayward Fayetteville Paul Higham Ben !anvil le lohnelle Hunt Fayetteville John Lewis Fayetteville Clark McClinton Fayetteville Virginia Morris Fayetteville Joe Peters - Bella Vista Burton Stacy Bentonville Joe Fred Stair Fayetteville Phillip Steele Springdale - Barbara Tyson Fayetteville Pal Walker Springdale Willard Walker Springdale Onion - EXECUTIVE DIRECTOR R. William Mitchell June 14, 1991 Mr. Jerry Cooper Staff Administrator City of Fayetteville 113 W. Mountain St. Fayetteville, AR 72701 Northwest Arkansas' Center For The Arts RE: CHANGE ORDER NUMBER 11 WALTON ARTS CENTER P.O. Box 3547 Fayetteville, Arkansas 72702 Business: 501-443-9216 FAX: 501-443-6461 Dear Jerry: Attached please find twenty (20) originals of Change Order No. 11 for the Walton Arts Center Project. This change orders reinstate the following items: Change Order No. 11 - Reinstates the Sound System, Window Treatment Stage Lighting Control, Generator, Fire Alarm, Structural items, Chair Lift Site Work. Private Fund Account $356,582.00 These were deleted originally to allow the contract to be awarded and are being added at this time to help complete the project in a timely manner. The Arts Center Council has approved adding these change orders at this time. These will require the City's approval along with the University of Arkansas' approval. Please return the signed copies as soon as possible. If you have any questions, please call. Sincerely, /ifig Bob H. Kelly, AIA Construction Manage cc• Ron. Cox, U of A Mott Mobley McGowan & Griffin, P.A.: Architects 302 North Sixth Street fort Smith, Arkansas 72901 Telephone (501) 782-1051 June 10, 1991 Our Project No. 1369 Carson & Associates 1310 West 14th Street Little Rock, Arkansas 72202 Re: Agreement dated April 28, 1990 Walton Arts Center Fayetteville, Arkansas CHANGE ORDER NO. 11 Gentlemen: You are hereby authorized to make the following changes in the Work included in the referenced. Agreement with the City of Fayetteville and the University1of Arkansas: 1. Refer to Paragraph 7.3.2, Item e. Reinstate this item of Work which consists of the Sound Reinforcement System (Addendum No. 4, Item No. 5). 2. Refer to Paragraph 7.3.2, Item 1. Reinstate this item of Work which consists of the Window Treatment (Addendum No. 4, Item No. 16). 3. Refer to Paragraph 7.3.2, Item u. Reinstate a portion of this item of Work consisting of the Stage Lighting Control System, except for the preparation of shop drawings and installation of special boxes which were reinstated in Change Order No. 8. With this action all items of Work included in Addendum No. 4, Item No. 28, have been reinstated in the contract. 4. Refer to Paragraph 7.3.2, Item v. Reinstate this item of Work which consists of the Emergency Electrical Generator (Addendum No. 4, Item No. 29). 5. Refer to Paragraph 7.3.2, Item w. Reinstate this item of Work which consists of Fire Alarm Equipment (Addendum No. 4, Item No. 30). 6. Increase the thickness of the concrete street approach from West Avenue to the parking lot from 6" to 7" thick. MM MG • Change Order No. 11 June 10, 1991 Page two 7. Add reinforcement and anchoring along north side of building adjacent to the balcony lobby and at the second floor line and in accordance with the attached drawing. 8. At the cantile lered angle between Grid JJ and Grid KK add a 4" x 4" x 1/4" steel tube hanger from W18 x 35 above located 12" from the end aof the angle as noted on Jacksonville Steel Company structural steel shop drawing 185. 9. Install a chat Vestibule 131. lift in the location shown on the drawings in a. The chairlift shall be equal to Cheney Handi—Lift Vertical Wheelchair Lift with a floor—to—floor height of approximately 29-1/2". Chairlift shall include all standard features including emergency stop, alarm, manual loweringdevice, overspeed brake, key switch operation at upper and lower level as well as in the car, and a lift capacity of 750 pounds. It shall also include electro—mechanical locked gates at top and bottom landings. b. The chairlift shall accept 120 volt, single phase, electrical service for 1/2 HP motor. 10. Perform a portion of the sitework which had been omitted from the contract by provisions of Addendum No. 5. This work shall include the excavation necessary to bring the site to the rough grade called for in Addendum No. 5. The quantity of work as is determined from the ground elevation survey prepared by McClelland Consulting Engineers on May 1, 1991, and includes the excavation and removal of approximately 1,885 cubic yards of material. 11. Install a conduit system for future computer wiring and power as called for in Addendum. No. 7. Accordingly, the contract will be Original CONTRACT SUM INCREASED by $356,582.00. Change Order Nos. 1 thru 10 Change per this CHANGE ORDER Adjusted CONTRACT SUM MM MG $ 5,476,370.00 1,432,796.00 $ -356,582.00 $ 7,265,748.00 Change Order No. 11 June 10, 1991 Page three - The Contract Time WILL NOT BE CHANGED by the work to be done under this Change Order. RECOMMENDED: ACCEPTED: MOTT MOBLEY McGOWAN & GRIFFIN, P.A. CARSON & ASSOCIATES By FINANCIAL RESPONSIBILITY: By Financial responsibility for the cost of this Change Order is that of the Arts Center Council. Payment will be made from the capital account which consists of private contributions. a.� Sonja7oecker, President The Arts Center Council APPROVED: BOARD OF TRUSTEES UNIVERSITY OF ARKANSAS By Distribution: Owner Architect Contractor MM MG CITY OF FAYETTEVILLE, ARKANSAS 14 - University of Arkansas 3 - City of Fayetteville, Arkansas 1� - Arts Center Council 11 1 MM MG Mott Mobley McGowan 8 Griffin, P.A.• Architects 302 North Sixth Street Fort SmIth, AR 729012099 Telephone (501) 782-1051 fps cF Spud - ? ,4 - C lie 02: r .r JOe #1369 SHEET HO. CALCULATED BY Walton Arts Center OF DATE I Drawing SD- „n 2 AC . c°, c S c Jrr3 � 4. Viir t 4t Tv0 V«fib Asl &CFFo c t7 TAI1. Fotz VtteoeT Gj 11.1- I l 2ii' Rana I d se -oil • PROJECT NO. 1369 WALTON ARTS CENTER FAYETTEVILLE, ARKANSAS JUNE 10, 1991 Mott Mobley McGowan & Griffin, P.A. Fort Smith, Arkansas Addendum No. 7 to the Drawings and Specifications. Addendum No. 7 Page 1 of 6 The following Addendum shall be incorporated in the Drawings and Speci- fications which are a part of the Contract Documents and shall super- sede anything contained therein with which it may conflict. Item No. 1. Refer to Drawing MEP 1.1, Utility Site Plan a. Electrical Contractor shall provide a 4" conduit with pullwire for computer network system from southwest portion of building exiting from south wall of Electrical Equipment Storage 126 over to northwest exterior wall of existing office building, 18" minimum below grade. Terminate conduit 6'-0" above finished grade and cap. Verify exact termination point with Owner. Contractor shall determine optimum routing of conduit. b. Electrical Contractor shall provide a 4" conduit with pullwire from northwest exterior wall of existing office building over to existing power pole to be relocated by SWEPCO near Spring Street and new drive, 18" minimum below grade. Terminate conduit 6'-0" above finished grade and cap at exterior wall of existing office building. Verify exact termination point with Owner. Terminate and cap conduit 8'-0" above finished grade at relocated power pole. Verify location of power pole with SWEPCO. Contractor shall determine optimum routing of conduit.• c. Electrical Contractor shall provide a 4" conduit with pullwire from southwest portion of building exiting from south wall of Electrical Equipment Storage 126 over to exterior wall of existing education building, 18" minimum below grade. Terminate conduit 6'-0" above finished grade and cap. Verify exact termination point with Owner. Contractor shall determine optimum routing of conduit. d. Electrical Contractor shall provide a 4" conduit with pullwire from southeast portion of building exiting from southeast wall of Mechanical 114 next to T.P.C. AHU-8 over to exterior wall of existing F.O.C. Building (across School Avenue), 18" minimum below grade. Terminate conduit 6'-0" above finished grade and cap. Verify exact termination point with Owner. Contractor shall cut and patch pavement, as required for installation of conduit under School Avenue. Contractor shall determine optimum routing of conduit. -1369- • .,Addendum No. 7 Page 2 of 6 Item No. 2. Refer to Drawing E1.2, Partial Floor Plan - Ground Level - Power. Add a single -gang junction box with a blank cover plate flush -mounted in wall for future computer outlet and a single -gang junction box with a blank cover plate flush -mounted in wall, for future computer power receptacle at each of the following locations: a. 'In Gallery 107: on northwest wall, l'-0" northeast of Column 5, 18" on northeast wall, 7'-0" northwest of Column F, 18" on southwest wall, 6'-0" northeast of Column 5, 18" on south wall, 10'-0" west of Column 6, 18" AFF. b. In Tickets 108A: AFF; AFF; AFF; and above counter on west wall 2'-0" north of Column J (see Architectural Drawings for mounting height). c. In Lobby 101: on south wall, 7'-0" east of Column 12, mounted 8'-0" AFF; and on south wall,' 3'-0" east of Column 14, mounted 18" AFF. In Control Booth 103L: on east wall, 2'-0" north of Column GG, 18" AFF; and on west wall, 2'-6" north of Column GG, 18" AFF. e. In Control Booth 103A: 3' -0" -west of matchline, 18" AFF; and 2'-0" east of matchline, 18" AFF. f. In Stage 116: on north wall, on south wall, 4'-0" east of Column 12, 18" AFF; and 2'-0" west �f Column 12, 18" AFF. g. In Dressing 117: h. on north wall, 7'-0" on east wall, 13'-0" an south wall, 9'-0" In Dressing 118: east of Column 12, north of Column U, west of Column 40, 8'-0" AFF; 8'-0" AFF; and 18" AFF. on north wall, 10'-0" east of Column 38, 8'-0" AFF; on west wall, 13'-0" north of Column U, 8'-0" AFF; and on south wall, 9'-0" east of Column 38, 18" AFF. -1369- • • • Addendum N�. 7 Page 3 of 6 Item No. 3. Refer to Drawing E1.4, Partial Floor Plan - Ground Level - Power. a. ;In Electrical Equipment Storage 126, add a 4' x 8' x 3/4" plywood computer terminal board centered on southeast wall. Provide an isolated ground/surge suppression duplex receptacle mounted 18" AFF under terminal board. Circuit to "LP6"-39, 3 #10, 3/4" C and an emergency duplex receptacle, 18" AFF under terminal board. Circuit to "ELP1"-1, 3 #10, 3/4" C. Add a single -gang junction box with a blank cover plate flush -mounted in wall for future computer outlet and a single -gang junction box with a blank cover plate flush -mounted in wall, for future computer power receptacle at each of the following locations: b. In Dressing 119: on east wall, 13'-0" north of Column U, on south wall, 4'-0" east of Column 37, on north wall, 2'-6" east of Column 37, c. In Green Room 123: 8'-0" AFF; 18" AFF; and 8'-0" AFF. on north wall, 7'-0" west of Column 35, 8'-0" AFF; on south wall, 2'-0" east of Column 35, 18" AFF. and d. In Costume Sto1rage/Shop 127: on northeast wall, 21'-0" east of Column 28, 18" AFF. e. In Stage 116: on north wall; 2'-0" west of Column 35, 18" AFF; and on south wall, 2'-0" east of Column 35, 18" AFF. f. In Studio 129AL g• on east wall, 12'-0" north of Column on west wall, 6'-0" north of Column on north wall, 9'-0" west of Column on south wall, 5'-0" west of Column N, 18" AFF; N, 18" AFF; 31, 18" AFF; and 31, 18" AFF. In Lobby 101E: on east wall, 8'-0" north of Column H, 18" AFF. -1369- • • Addendum No. _7 Page 4 of 6 h. In Studio 134B: on southeast on southwest on northwest an northeast i. In Lobby 101: wall, 6'-0" northeast of Column F, 18" AFF; wall, 10'-0" northwest of Column 22, 18" AFF; wall, 18'-0" northeast of Column G, 18" AFF; and wall, 7'-0" northwest of Column 22, 18" AFF. on south wall, 9'-0" west of Column 21, 8'-0" AFF; and on south wall, 5'-0" west of Column 15, 18" AFF. j. In Tickets 137 on south wall, 2'-6" west of Column 18, 18" AFF. Item No. 4. Refer to Drawing E1.6, Partial Floor Plan - Balcony Level - Power Add a single -gang junction box with a blank cover plate flush -mounted in wall for future computer outlet and a single -gang junction box with a blank cover plate flush -mounted in wall, for future computer power receptacle at each of the following locations: a. In. Balcony Lobby 200: on south wall, 2'-0" east of Column 13, 8'-0" AFF; and on south wall at matchline, 18" AFF. Item No. 5. Refer to - Power. Drawing E1.8, Partial Floor Plan - Balcony Level Add a single -gang junction box with a blank cover plate flush -mounted in wall for future computer outlet and a single -gang junction box with a blank cover plate flush -mounted in wall, for future computer power receptacle at each of the following locations: a. In Balcony Lobby 200: on south wall, 3'-0" west of Column 15, 8'-0" AFF. b. In Control Booth 208: on south wall, 5'-0" west and 5'-0" east of Column 30, 18" AFF. Item No. 6. Refer to Drawing E1.9, Partial Floor Plan - Upper Level Catwalks Auditorium - Electrical. Add a single -gang junction box with a blank cover plate flush -mounted in wall for future computer outlet and a single -gang junction box with -1369- Addendum No. 7 Page 5 of 6 a blank cover plate flush -mounted in wall, for future computer power receptacle at each of the following locations: a. In Follow Spot Platform 300: on north wall, 9'-0" and 19'-O" east of Column 15, 18" AFF. Item No. 7. Refer to Drawing E1.10, Partial Floor Plan - Orchestra Pit - Electrical. Add a single -gang junction box with a blank cover plate flush -mounted in -wail for future computer outlet and a single -gang junction box with a blank cover plate flush -mounted in wall, for future computer power receptacle at each of the following locations: a. Orchestra Pit: on south wall, 36'-0" east of Column 36, 18" AFF. Item No. 8. Refer to Drawing E1.13, Telephone/Computer System Riser Diagram. Provide a single -gang junction box with a blank cover plate with 3/4" empty conduit with. pullwire stubbed into ground level accessible ceiling space for future cable connections to terminal board by Owner in the following locations: a. Gallery 107 - four (.4) at 18" AFF. b. Tickets 108A - one (1) above counter. c. Lobby 101 - two (2) at 18" AFF and two (2) at 8'-0" AFF. d . Control Booth 103A - two (2) at 18" AFF. e . Control Booth 103L - two (2) at 18" AFF. f. Dressing 117 - two (2) at 8'-0" AFF and one (1) at 18" AFF. g . Dressing 118 - two (2) at 8'-0" AFF and one (1) at 18" AFF. h. Stage 116 - four (4) at 18" AFF. i. Tickets 137 - one (1) at 18" AFF. j. Studio 134B - four (4) at 18" AFF. k. :Lobby 101E - one.(1) at 18" AFF. 1. Studio 129A - four (4) at 18" AFF. m. Dressing 119 - two at 8'-0" AFF and one (1) at 18" AFF. n. Green Room 123 - one (1) at 8'-0" AFF and one (1) at 18" AFF. o . Costume Storage/Shop 127 - one (1) at 18" AFF. p. Balcony Lobby 200 - two (2) at 8'-0" AFF and one (1) at 18" AFF q. Control Booth 208 - two (2) at 18" AFF. ✓ . Follow Spot Platform 300 - two (2) at 18" AFF. s. Orchestra Pit - one (1) at 18" AFF. t. In Electrical Equipment Storage 126, add a 4' x 8' x 3/4" plywood computer terminal board. Provide 1 #6 isolated ground, 3/4" C from terminal board to "MDB1" ground bus. Contractor shall provide -1369- 1 • • oAddendum No. 7 Page 6 of 6 two (2) 4" conduits from this terminal board rising up wall into ceiling space and exiting through wall to serve existing office building and -existing education building. Contractor shall seal wall penetrations water tight. u. In Mechanic 114, provide a 4" just left of TCP-AHU-8, 8'-0" AFF, to Contractor shall seal wall penetration conduit stubbed 6" through wall serve existing F.O.C. Building. water tight. Item No. 9. All junction boxes for future computer power receptacles shall have empty 3/4" conduit with pullwires stubbed into ceiling space for future power connection by Owner. - * -1369-