RESOLUTION NO. 124-91
A RESOLUTION AUTHORIZING CHANGE ORDER NO. 11
FOR THE WALTON ARTS CENTER PROJECT.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the Mayor and City Clerk are hereby
authorized and directed to execute Change Order No. 11 in the
amount of $356,582.00 for the Walton Arts Center Project to provide
construction and/or installation of the sound system, window
treatment, stage lighting control, generator, fire alarm,
structural items, and chair lift site. A copy of the change order
authorized for execution hereby is attached hereto marked Exhibit
"A" and made a part hereof.
PASSED AND APPROVED this
.SATTEST :
tY.a
city Cl
rte: 1
> f
4,1=4
•
2nd day 'of
July
APPROVED:
//V
•
1991.
AGENDA REQUEST
For the Board meeting of July 2, 1991
FRON:
Terry W. Cooper City Manager General Administration
Name Division Department
BOARD ACTION REQUESTED:
A resolution approving Change Order No. 11 for the Walton Arts Center Project.
COST TO CITY:
-0-
Cost of this request
% of Program completed
BUDGET REVIEW:
Line item budgeted amount Account name
Funds used to date Account Number
Remaining balance
Budgeted Item Budget Adjustment Attached
Budget Coordinator Administrative Services Director
CONTRACT/LEASE REVIEW:
Finance Director
City Attorney
Purchasing Officer
Internal Auditor
STAFF RECC3WWNDATION:
Date
Date
Date
Date
GRANT APPLICATION REVIEW:
Internal Auditor Date
Approval of Change Order No. 11 for the Walton Arts Center Project. This Change Order
reinstates the sound system, window treatment stage lighting control, generator, fire alarm,
structural items, and chair lif site work. This Change Order will be funded by private
fun
mmiotr ter-- 3une-18, 1991
on
I
Dem nt Director
Mill
Date
Date
Adminis rative Services Director Date
ARTS CENTER COUNCIL
Stephen E. Adams
Fayetteville
Gerry Bomotti
Fayetteville
P. Elliott Burnside
Springdale
Sonja Decker
Fayetteville
Karen Dobbs
Bella Vista
D. Andrew Gibbs
Fayetteville
lames Gilbreath
Fayetteville
Bernard Madison
Fayettevi Ile
Carol Peters
Bella Vista
Chalon Ragsdale
Fayetteville
Frank Sharp
Fayetteville
Shirley Stacy
Bentonville
Billie lo Starr
Fayetteville
Nancy Van Route
Siloam Springs
lane Waters
Springdale
Linda Wray
Springdale
I✓"
REGIONAL FUNDRAISING
COMMITTEE
Helen Walton. Honorary Chair
Bentonville
Billie Jo Starr. Chair
fayelteville
Jim Blair
Fayetteville
Jack Dunn
Fayetteville
Juanita Dunn
Fayetteville
William Enfield
• Benlonvil le
Willard Gatewood
Fayetteville
Ellen Hayward
Fayetteville
Malcolm Hayward
Fayetteville
Paul Higham
Ben !anvil le
lohnelle Hunt
Fayetteville
John Lewis
Fayetteville
Clark McClinton
Fayetteville
Virginia Morris
Fayetteville
Joe Peters
- Bella Vista
Burton Stacy
Bentonville
Joe Fred Stair
Fayetteville
Phillip Steele
Springdale
- Barbara Tyson
Fayetteville
Pal Walker
Springdale
Willard Walker
Springdale
Onion -
EXECUTIVE DIRECTOR
R. William Mitchell
June 14, 1991
Mr. Jerry Cooper
Staff Administrator
City of Fayetteville
113 W. Mountain St.
Fayetteville, AR 72701
Northwest Arkansas' Center For The Arts
RE: CHANGE ORDER NUMBER 11
WALTON ARTS CENTER
P.O. Box 3547
Fayetteville, Arkansas 72702
Business: 501-443-9216
FAX: 501-443-6461
Dear Jerry:
Attached please find twenty (20) originals of Change Order No. 11 for the Walton
Arts Center Project. This change orders reinstate the following items:
Change Order No. 11 - Reinstates the
Sound System, Window Treatment
Stage Lighting Control, Generator,
Fire Alarm, Structural items, Chair Lift
Site Work.
Private Fund Account
$356,582.00
These were deleted originally to allow the contract to be awarded and are being
added at this time to help complete the project in a timely manner.
The Arts Center Council has approved adding these change orders at this time.
These will require the City's approval along with the University of Arkansas'
approval. Please return the signed copies as soon as possible.
If you have any questions, please call.
Sincerely,
/ifig
Bob H. Kelly, AIA
Construction Manage
cc• Ron. Cox, U of A
Mott Mobley McGowan & Griffin, P.A.: Architects
302 North Sixth Street fort Smith, Arkansas 72901
Telephone (501) 782-1051
June 10, 1991 Our Project No. 1369
Carson & Associates
1310 West 14th Street
Little Rock, Arkansas 72202
Re: Agreement dated April 28, 1990
Walton Arts Center
Fayetteville, Arkansas
CHANGE ORDER NO. 11
Gentlemen:
You are hereby authorized to make the following changes in the Work
included in the referenced. Agreement with the City of Fayetteville and
the University1of Arkansas:
1. Refer to Paragraph 7.3.2, Item e. Reinstate this item of Work
which consists of the Sound Reinforcement System (Addendum No.
4, Item No. 5).
2. Refer to Paragraph 7.3.2, Item 1. Reinstate this item of Work
which consists of the Window Treatment (Addendum No. 4, Item
No. 16).
3. Refer to Paragraph 7.3.2, Item u. Reinstate a portion of this
item of Work consisting of the Stage Lighting Control System,
except for the preparation of shop drawings and installation of
special boxes which were reinstated in Change Order No. 8.
With this action all items of Work included in Addendum No. 4,
Item No. 28, have been reinstated in the contract.
4. Refer to Paragraph 7.3.2, Item v. Reinstate this item of Work
which consists of the Emergency Electrical Generator (Addendum
No. 4, Item No. 29).
5. Refer to Paragraph 7.3.2, Item w. Reinstate this item of Work
which consists of Fire Alarm Equipment (Addendum No. 4, Item
No. 30).
6. Increase the thickness of the concrete street approach from
West Avenue to the parking lot from 6" to 7" thick.
MM
MG
•
Change Order No. 11
June 10, 1991
Page two
7. Add reinforcement and anchoring along north side of building
adjacent to the balcony lobby and at the second floor line and
in accordance with the attached drawing.
8. At the cantile lered angle between Grid JJ and Grid KK add a 4"
x 4" x 1/4" steel tube hanger from W18 x 35 above located 12"
from the end aof the angle as noted on Jacksonville Steel
Company structural steel shop drawing 185.
9. Install a chat
Vestibule 131.
lift in the location shown on the drawings in
a. The chairlift shall be equal to Cheney Handi—Lift
Vertical Wheelchair Lift with a floor—to—floor height
of approximately 29-1/2". Chairlift shall include all
standard features including emergency stop, alarm,
manual loweringdevice, overspeed brake, key switch
operation at upper and lower level as well as in the
car, and a lift capacity of 750 pounds. It shall also
include electro—mechanical locked gates at top and
bottom landings.
b. The chairlift shall accept 120 volt, single phase,
electrical service for 1/2 HP motor.
10. Perform a portion of the sitework which had been omitted from
the contract by provisions of Addendum No. 5. This work shall
include the excavation necessary to bring the site to the rough
grade called for in Addendum No. 5. The quantity of work as is
determined from the ground elevation survey prepared by
McClelland Consulting Engineers on May 1, 1991, and includes
the excavation and removal of approximately 1,885 cubic yards
of material.
11. Install a conduit system for future computer wiring and power
as called for in Addendum. No. 7.
Accordingly, the contract will be
Original CONTRACT SUM
INCREASED
by $356,582.00.
Change Order Nos. 1 thru 10
Change per this CHANGE ORDER
Adjusted CONTRACT SUM
MM
MG
$ 5,476,370.00
1,432,796.00
$ -356,582.00
$ 7,265,748.00
Change Order No. 11
June 10, 1991
Page three -
The Contract Time WILL NOT BE CHANGED by the work to be done under this
Change Order.
RECOMMENDED: ACCEPTED:
MOTT MOBLEY McGOWAN & GRIFFIN, P.A. CARSON & ASSOCIATES
By
FINANCIAL RESPONSIBILITY:
By
Financial responsibility for the cost of this Change Order is that of
the Arts Center Council. Payment will be made from the capital account
which consists of private contributions.
a.�
Sonja7oecker, President
The Arts Center Council
APPROVED:
BOARD OF TRUSTEES
UNIVERSITY OF ARKANSAS
By
Distribution:
Owner
Architect
Contractor
MM
MG
CITY OF FAYETTEVILLE, ARKANSAS
14 - University of Arkansas
3 - City of Fayetteville, Arkansas
1� - Arts Center Council
11
1
MM
MG
Mott Mobley McGowan 8 Griffin, P.A.• Architects
302 North Sixth Street Fort SmIth, AR 729012099
Telephone (501) 782-1051
fps cF Spud -
?
,4 -
C lie 02:
r .r
JOe #1369
SHEET HO.
CALCULATED BY
Walton Arts Center
OF
DATE
I Drawing SD-
„n 2 AC . c°, c S c Jrr3
�
4. Viir t 4t Tv0
V«fib Asl &CFFo c t7 TAI1. Fotz
VtteoeT Gj 11.1- I l 2ii' Rana
I d se -oil
•
PROJECT NO. 1369
WALTON ARTS CENTER
FAYETTEVILLE, ARKANSAS
JUNE 10, 1991
Mott Mobley McGowan & Griffin, P.A.
Fort Smith, Arkansas
Addendum No. 7 to the
Drawings and Specifications.
Addendum No. 7
Page 1 of 6
The following Addendum shall be incorporated in the Drawings and Speci-
fications which are a part of the Contract Documents and shall super-
sede anything contained therein with which it may conflict.
Item No. 1. Refer to Drawing MEP 1.1, Utility Site Plan
a. Electrical Contractor shall provide a 4" conduit with pullwire
for computer network system from southwest portion of building exiting
from south wall of Electrical Equipment Storage 126 over to northwest
exterior wall of existing office building, 18" minimum below grade.
Terminate conduit 6'-0" above finished grade and cap. Verify exact
termination point with Owner. Contractor shall determine optimum
routing of conduit.
b. Electrical Contractor shall provide a 4" conduit with pullwire
from northwest exterior wall of existing office building over to
existing power pole to be relocated by SWEPCO near Spring Street and
new drive, 18" minimum below grade. Terminate conduit 6'-0" above
finished grade and cap at exterior wall of existing office building.
Verify exact termination point with Owner. Terminate and cap conduit
8'-0" above finished grade at relocated power pole. Verify location of
power pole with SWEPCO. Contractor shall determine optimum routing of
conduit.•
c. Electrical Contractor shall provide a 4" conduit with pullwire
from southwest portion of building exiting from south wall of
Electrical Equipment Storage 126 over to exterior wall of existing
education building, 18" minimum below grade. Terminate conduit 6'-0"
above finished grade and cap. Verify exact termination point with
Owner. Contractor shall determine optimum routing of conduit.
d. Electrical Contractor shall provide a 4" conduit with pullwire
from southeast portion of building exiting from southeast wall of
Mechanical 114 next to T.P.C. AHU-8 over to exterior wall of existing
F.O.C. Building (across School Avenue), 18" minimum below grade.
Terminate conduit 6'-0" above finished grade and cap. Verify exact
termination point with Owner. Contractor shall cut and patch pavement,
as required for installation of conduit under School Avenue.
Contractor shall determine optimum routing of conduit.
-1369-
•
.,Addendum No. 7
Page 2 of 6
Item No. 2. Refer to Drawing E1.2, Partial Floor Plan - Ground Level
- Power.
Add a single -gang junction box with a blank cover plate flush -mounted
in wall for future computer outlet and a single -gang junction box with
a blank cover plate flush -mounted in wall, for future computer power
receptacle at each of the following locations:
a. 'In Gallery 107:
on northwest wall, l'-0" northeast of Column 5, 18"
on northeast wall, 7'-0" northwest of Column F, 18"
on southwest wall, 6'-0" northeast of Column 5, 18"
on south wall, 10'-0" west of Column 6, 18" AFF.
b. In Tickets 108A:
AFF;
AFF;
AFF; and
above counter on west wall 2'-0" north of Column J (see
Architectural Drawings for mounting height).
c. In Lobby 101:
on south wall, 7'-0" east of Column 12, mounted 8'-0" AFF; and
on south wall,' 3'-0" east of Column 14, mounted 18" AFF.
In Control Booth 103L:
on east wall, 2'-0" north of Column GG, 18" AFF; and
on west wall, 2'-6" north of Column GG, 18" AFF.
e. In Control Booth 103A:
3' -0" -west of matchline, 18" AFF; and
2'-0" east of matchline, 18" AFF.
f. In Stage 116:
on north wall,
on south wall,
4'-0" east of Column 12, 18" AFF; and
2'-0" west �f Column 12, 18" AFF.
g. In Dressing 117:
h.
on north wall, 7'-0"
on east wall, 13'-0"
an south wall, 9'-0"
In Dressing 118:
east of Column 12,
north of Column U,
west of Column 40,
8'-0" AFF;
8'-0" AFF; and
18" AFF.
on north wall, 10'-0" east of Column 38, 8'-0" AFF;
on west wall, 13'-0" north of Column U, 8'-0" AFF; and
on south wall, 9'-0" east of Column 38, 18" AFF.
-1369-
•
•
•
Addendum N�. 7
Page 3 of 6
Item No. 3. Refer to Drawing E1.4, Partial Floor Plan - Ground Level
- Power.
a. ;In Electrical Equipment Storage 126, add a 4' x 8' x 3/4"
plywood computer terminal board centered on southeast wall. Provide an
isolated ground/surge suppression duplex receptacle mounted 18" AFF
under terminal board. Circuit to "LP6"-39, 3 #10, 3/4" C and an
emergency duplex receptacle, 18" AFF under terminal board. Circuit to
"ELP1"-1, 3 #10, 3/4" C.
Add a single -gang junction box with a blank cover plate flush -mounted
in wall for future computer outlet and a single -gang junction box with
a blank cover plate flush -mounted in wall, for future computer power
receptacle at each of the following locations:
b. In Dressing 119:
on east wall, 13'-0" north of Column U,
on south wall, 4'-0" east of Column 37,
on north wall, 2'-6" east of Column 37,
c. In Green Room 123:
8'-0" AFF;
18" AFF; and
8'-0" AFF.
on north wall, 7'-0" west of Column 35, 8'-0" AFF;
on south wall, 2'-0" east of Column 35, 18" AFF.
and
d. In Costume Sto1rage/Shop 127:
on northeast wall, 21'-0" east of Column 28, 18" AFF.
e. In Stage 116:
on north wall; 2'-0" west of Column 35, 18" AFF; and
on south wall, 2'-0" east of Column 35, 18" AFF.
f. In Studio 129AL
g•
on east wall, 12'-0" north of Column
on west wall, 6'-0" north of Column
on north wall, 9'-0" west of Column
on south wall, 5'-0" west of Column
N, 18" AFF;
N, 18" AFF;
31, 18" AFF; and
31, 18" AFF.
In Lobby 101E:
on east wall, 8'-0" north of Column H, 18" AFF.
-1369-
•
•
Addendum No. _7
Page 4 of 6
h. In Studio 134B:
on southeast
on southwest
on northwest
an northeast
i. In Lobby 101:
wall, 6'-0" northeast of Column F, 18" AFF;
wall, 10'-0" northwest of Column 22, 18" AFF;
wall, 18'-0" northeast of Column G, 18" AFF; and
wall, 7'-0" northwest of Column 22, 18" AFF.
on south wall, 9'-0" west of Column 21, 8'-0" AFF; and
on south wall, 5'-0" west of Column 15, 18" AFF.
j. In Tickets 137
on south wall, 2'-6" west of Column 18, 18" AFF.
Item No. 4. Refer to Drawing E1.6, Partial Floor Plan - Balcony Level
- Power
Add a single -gang junction box with a blank cover plate flush -mounted
in wall for future computer outlet and a single -gang junction box with
a blank cover plate flush -mounted in wall, for future computer power
receptacle at each of the following locations:
a. In. Balcony Lobby 200:
on south wall, 2'-0" east of Column 13, 8'-0" AFF; and
on south wall at matchline, 18" AFF.
Item No. 5. Refer to
- Power.
Drawing E1.8, Partial Floor Plan - Balcony Level
Add a single -gang junction box with a blank cover plate flush -mounted
in wall for future computer outlet and a single -gang junction box with
a blank cover plate flush -mounted in wall, for future computer power
receptacle at each of the following locations:
a. In Balcony Lobby 200:
on south wall, 3'-0" west of Column 15, 8'-0" AFF.
b. In Control Booth 208:
on south wall,
5'-0" west and 5'-0" east of Column 30, 18" AFF.
Item No. 6. Refer to Drawing E1.9, Partial Floor Plan - Upper Level
Catwalks Auditorium - Electrical.
Add a single -gang junction box with a blank cover plate flush -mounted
in wall for future computer outlet and a single -gang junction box with
-1369-
Addendum No. 7
Page 5 of 6
a blank cover plate flush -mounted in wall, for future computer power
receptacle at each of the following locations:
a. In Follow Spot Platform 300:
on north wall,
9'-0" and 19'-O" east of Column 15, 18" AFF.
Item No. 7. Refer to Drawing E1.10, Partial Floor Plan - Orchestra
Pit - Electrical.
Add a single -gang junction box with a blank cover plate flush -mounted
in -wail for future computer outlet and a single -gang junction box with
a blank cover plate flush -mounted in wall, for future computer power
receptacle at each of the following locations:
a. Orchestra Pit:
on south wall,
36'-0" east of Column 36, 18" AFF.
Item No. 8. Refer to Drawing E1.13, Telephone/Computer System Riser
Diagram.
Provide a single -gang junction box with a blank cover plate with 3/4"
empty conduit with. pullwire stubbed into ground level accessible
ceiling space for future cable connections to terminal board by Owner
in the following locations:
a. Gallery 107 - four (.4) at 18" AFF.
b. Tickets 108A - one (1) above counter.
c. Lobby 101 - two (2) at 18" AFF and two (2) at 8'-0" AFF.
d . Control Booth 103A - two (2) at 18" AFF.
e . Control Booth 103L - two (2) at 18" AFF.
f. Dressing 117 - two (2) at 8'-0" AFF and one (1) at 18" AFF.
g . Dressing 118 - two (2) at 8'-0" AFF and one (1) at 18" AFF.
h. Stage 116 - four (4) at 18" AFF.
i. Tickets 137 - one (1) at 18" AFF.
j. Studio 134B - four (4) at 18" AFF.
k. :Lobby 101E - one.(1) at 18" AFF.
1. Studio 129A - four (4) at 18" AFF.
m. Dressing 119 - two at 8'-0" AFF and one (1) at 18" AFF.
n. Green Room 123 - one (1) at 8'-0" AFF and one (1) at 18" AFF.
o . Costume Storage/Shop 127 - one (1) at 18" AFF.
p. Balcony Lobby 200 - two (2) at 8'-0" AFF and one (1) at 18" AFF
q. Control Booth 208 - two (2) at 18" AFF.
✓ . Follow Spot Platform 300 - two (2) at 18" AFF.
s. Orchestra Pit - one (1) at 18" AFF.
t. In Electrical Equipment Storage 126, add a 4' x 8' x 3/4"
plywood computer terminal board. Provide 1 #6 isolated ground, 3/4" C
from terminal board to "MDB1" ground bus. Contractor shall provide
-1369-
1
•
•
oAddendum No. 7
Page 6 of 6
two (2) 4" conduits from this terminal board rising up wall into
ceiling space and exiting through wall to serve existing office
building and -existing education building. Contractor shall seal wall
penetrations water tight.
u. In Mechanic 114, provide a 4"
just left of TCP-AHU-8, 8'-0" AFF, to
Contractor shall seal wall penetration
conduit stubbed 6" through wall
serve existing F.O.C. Building.
water tight.
Item No. 9. All junction boxes for future computer power receptacles
shall have empty 3/4" conduit with pullwires stubbed into ceiling space
for future power connection by Owner. -
*
-1369-