HomeMy WebLinkAbout70-90 RESOLUTIONRESOLUTION NO. 70-90 A RESOLUTION AUTHORIZING A CONTRACT BETWEEN THE CITY OF FAYETTEVILLE, UNIVERSITY OF ARKANSAS AND CARSON & ASSOCIATES OF LITTLE ROCK, ARKANSAS FOR CONSTRUCTION OF THE WALTON ARTS CENTER BE 1T RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEV I I.I.F. , ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute a contract between the City of Fayetteville, University of Arkansas and Carson & Associates of Litte Rock, Arkansas in the amount of $5,536,370.00. The contract also contains options in the amount of $1.855,630.00 to complete the building as designed. A copy of the contract authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 1st ATTEST: By : i��L!%uuf �T •"tiin,�.��/ day of APPROVED: Bi: May 1990. •(H E, t r AMERICAN INSTITUTE OF ARCHITECTS AIA Document A101 Standard Form of Agreement Between Owner and Contractor inhere the basis of payment is a STIPULATED SUM 1987 EDITION THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. The 1987 Edition of AIA Document A201, General Conditions of the Contract for Construction, is adopted in This document by reference. Do not use with other general conditions unless this document is moddied This document has been approved and endorsed by The Associated General Contractors of America. AGREEMENT made as of the Twenty -Eighth Nineteen Hundred and Ninety BETWEEN the Owner: (Amite and address) and the Contractor: (Name and address) The Project is: (A'anre and location) The Architect is: (Name and address) day of April in the year of Board of Trustees, University of City of Fayetteville, Arkansas c/o UofA/Fayetteville Arts Center Council 240 North Block Street Fayetteville, AR Arkansas Carson 6 Associates, Inc. 1310 West 14th Street Little Rock, AR Walton Arts Center Fayetteville, AR Mott Mobley McGowan & Griffin, P.A. 302 North Sixth Street Fort Smith, AR The Owner and Contractor agree as set forth below. Copyright 1915, 1918 1925, 193'. 1951. 1958, 1961, 1963 196-, 19'4, 1977, 0198' b) The American Income of Archi leets, 1735 New York Avenue, N W , Washington, D C 20006 Reproduction of the material herein or subsianlial yuoutior of its provisions without written permission of the AlA violates the copyright laws of the United Stales and wi:l be subject to legal prosecution AIA DOCUMENT A101 • OWNER CONTRACTOR ACREE\IENT • TW FI FTIi FDITION • A:AR • E;19R- T111AMIRI(ANIN'TTrTFOFARC-cifECTS 1-3SNLI.YOH,A\ENtF'\W WASIi:\(-T(\N of :ix. A101.1987 1 • • • '•e 1 • ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement. other documents listed in this Agreement and Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall execute the en:;re Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsible) of others, or as follows: None ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 3.1 The date of commencement is rhe date from which the Contract Time of Paragraph 32 is measured. and shall he the date of this Agreement. as first written above, unless a different date is stated below or provision is made for the [late to he fixed in a notice to proceed issued by the Owner. /Insert the dale of a onmumternrnl, r/ rt differs from the date of this Agreement or. if appltable state Ibal lbe dale trill be fixed in a notice to protect:) The date of commencement shall be stipulated by a notice to proceed issued by the Owner in writing. Unless :he date of commencement is established by a notice to proceed issued by the Owner. the Contractor shall notify the Owner in writing nut Icss than five days before commencing the Work to permit the timely filing of mortgages, mechanic's liens and other security interests 3.2 The Contractor stall achieve Substantial Completion of the entire Work not later than (Insert the talend.v date or rummer of calendar dais after the dalr of commencement Also insert and relutrements for earlier Substantial (amplrh1 m ricer tarn prvnnn. ,/ Nr York if ma staled W.ev herr in the (inrtrat( Documents I Five hundred fifteen (515) consecutive calendar days after the date of commencement, . suhim to adjustments of :his Contract Time as provided in the Contract Documents. tInrrt prwlnuui, of mei p•r !gradati ri damage. rela9ng m failure to complete on lime ) If the Contractor fails to complete the Work within this time, or any agreed extension thereof, he shall nay to the Owner as liquidated damages, fixed and agreed, and not as a penalty, the sum of Two Hundred Fifty ($250) for each such calendar day of delay of the Work which sum shall be withheld by the Owner from payments due to be made to the Contractor by the Owner under the terms of the Contract. AIA DOCUMENT A101 • nu r o11 R4' 1OR AcRE}MI N. • 1 U FI F 1111-111111 11 • AIA• • 2,19E 1111- AM1-Hf AN .N1/4 11. 1} ^} 4R: 111111 1x 1-11 N1 -V. 1 t.Rb Al1-v, F N0. U4,111 (.70N 11( /Div. A101-1987 2 • , , f 5 , ^7a 1 • ARTICLE 4 CONTRACT SUM 4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of Five Million Four Hundred Seventy -Six Thousand Three Hundred Seventy Dollars ($ 5,476,370.00 ), subject to additions and ueduclions ab provided ir: the Con- tract Documents 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner. Alternate Bid Nos. 1, 2, 3, 4 and 5. (State the numbers or other identification of accepted allenrates If decisions on other alternates are to be made by toe Owner subsequent to lbe trerubor of Mrs Agreement attach a schedule of sucb caber alternate, showing the amount for each and the date until winch That amount Is valid ) • 1 t• The Contract Sum is based upon: The Base Bid Less the amount of Alternate Bid Nos. 1, 2, 3, 4 and 5 Less the amount credited for Work omitted by Addendum No. 4 Less the amount credited for Work omitted by Addendum No. 5 $7,392,000.00 (326,000.00) (1,529,630.00) (60,000.00) $5,476,370.00 4.3 Unit prices, if any, are as follows a. Depth of bottoms of concrete foundation piers as described in Paragraph 10 of the SCOPE OF CONTRACTS, $19.00 per cubic yard. aa. Test probes in bottoms of drilled caissons as described in Paragraph 10a of the SCOPE OF CONTRACTS, $50.00 per 6' deep probe. b. Mass rock excavation as described in Paragraph 11 of the SCOPE OF CONTRACTS, $120.00 per cubic yard. c. Single purchase, 7 -line counterweight sets, Batten Type A, with reduction totaling no more than 10 sets, as described in Paragraph 12 of the SCOPE OF CONTRACTS, $2,300.00 per counterweight set. AIA DOCUMENT A101 • OU NI- ( (INTRA( TUR ACRFFMI-NI • TU ELF1H FI)ITIU\ • AIAe • I 19g- TN1- AMIRI( AN .N1-11- LI? OF ARS 1111(( l' 1 -As \IU 1JRh A EN] N.• V i\Ft:\(.70N I) t A101-1987 3 • • Cash allowances are as follows: Allowance No. 5: A lump sum of $5,500.00 for the installation of plumbing and electrical roughing -in in Kitchen 124. These roughing - in plans and risers will be furnished immediately upon commencement of construction work. Allowance No. 6: A lump sum of $10,000.00 for the purchase and installation of a duplex sump pump, covers, valves and controls. 3a • a ARTICLE 5 PROGRESS PAYMENTS 5.1 Based upon Applications for Payment submitted to the Architect by the (Amtractor and Ceni learns for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents 5.2 The period covered by each Application for Payment shall be one calendar month ending on the las: day of the month, or as follows. 5.3 Provided an Application for Payment has been received in proper order, and is acceptable to the Architect as to accuracy, the Owner shall make payment to the Contractor in accordance with Paragraphs 41 and 4m of Specification Section 01027, APPLICATIONS FOR PAYMENT, and Act 813 of 1977 of the Arkansas Legislature. 5.4 Each Application for Payment shall be based upon the Schedule of Values submitted by the Contractor in accordance with the Contract Documents. The Schedule of Values shall allocate the entire Contract Sum among the various portions of the Work and he prepared to such form and supported by such data to substantiate its accuracy as the Architect may require This Schedule, unless objected to by the Architect. shall be used as a basis for reviewing the Contractor's Applications for Payment. 5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment 5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: 5.6.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to tha: portion of the 'Vork to the Schedule of Values, less retainage of ten percent ( 10 %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as provided in Subparagraph 7.3.7 of the General Conditions even though the Contract Sum has not yet been adjusted by Change Order, 5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner. suitably stored off the site at a location agreed upon in writing), Tess retainage of zero percent ( 0 %). 5.6.3 Subtract the aggregate of previous payments made by the Owner, and 5.6.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Para graph 9.5 of the General Conditions. 5.7 The progress payment amount determined in accordance with Paragraph 5 6 shall be further m id.fted under the following circumstances. 5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to ninety percent( 90 %) of the Contract Sum, less such amounts as the Architect shall determine for incomplete Work and unsettled claims, and 5.7.2 Add, if final completion of the Work is ;hereafter materially delayed through no fault of the Contractor any additional amounts payable in accordance with Subparagraph 9.10 .3 of the General Conditions. 5.6 Reduction or limitation of retainage, if any. shall be as follows of it b 'mended prior to 5uhrlsnnnf re urpleho.r of the erhre lib,k la 'ecfnce or haul the relarretkr re•ulhng ; rmn tiw pen i'1hno• rrr•erled tar SLhpnnn kruph• i h 1 and 5 h 2 uM,re arra lhn• iy not nplaaavl eAeh•here no the 6uwrar t Dim nment WWI' M ••• fe+a wino lot %gill h redn.(mn ar !Millar If n At any time after fifty percent (50%) of the Work has been completed, if the Architect finds that satisfactory progress is being made, and with written consent of the Surety, the remaining partial payments will be made in full and the payment upon Substantial Completion will be increased from ninety percent (90%) to ninety- five percent (95%). AIA DOCUMENT A101 • OU MB 1 r Al RA• 'OH AGA:1%11Ni • TV 111711 EI)V It)N • AIA° • •5 I9'r Tlil AVhH't A% IN -11 111 til AR( !Mr.( 15 I-5`NI55 TRF 4\ ' U+5.':\1,1'1\ h( 1)1.r A101.1987 4 •t • ARTICLE 6 FINAL PAYMENT Final payment, constituting the entire unpaid balance of the Contract Sum. shall be made by the Owner to the Contractor when (1) the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconforming Work as provided in Subparagraph 12 2 2 of the General Conditions and to satisfy other requirements, if any, which necessarily survive final payment; and (2) a final Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the Architect's final Certificate for Payment ARTICLE 7 MISCELLANEOUS PROVISIONS 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the ref- erence refers to that provision as amended or supplemented by other provisions of the Contract Documents. 7.3 Other provisions: 7.3.1 Items of Work omitted from the Base Bid by Alternate Bid Nos. 1, 2, 3, 4 and 5, or by the provisions of Addendum No. 4 shall be returned to the scope of work under this Agreement at the costs listed in Subpara- graph 7.3.2 provided the Contractor is given written notice to proceed with the specific items of Work no later than the dates listed in Sub- paragraph 7.3.2. AIA DOCUMENT A101 • O' \FR f.O»TKM:1 t)R ACREEAlEN: • TVr*:.FTII EDITION • MO •$ 191r THE AMI 9'( AN INsT1l1 TF 01114111TH '- ("%EU 1()Rh All 911 NV ' A}N,NI TUI [)( L(+n- A101-1987 5 • a 1 7.3.2 5 ♦ 4b 1 • a Contractor hereby agrees to add the following items of work to the scope of work under this Agreement at the costs listed provided that written notice to proceed with specific items is given to the Contractor by the dates listed for each item of work. If written notice is not provided by the dates listed, and the Owner makes a determination that work is to be done, the cost for each item will be negotiated with the Contractor, providing the date of substantial completion has not been reached, using as a basis a written breakdown of material costs, labor costs and labor burden to be filed with the Owner prior to the date of commencement. a. Allowance No. 1, finish hardware for interior doors and exterior aluminum doors (Addendum No. 4, Item No. 1). No. $ 41,500.00 if Contractor is notified no later than 180 consecutive calendar days following the date of commencement. b. Allowance No. 2, purchase and installation of carpet (Addendum 4, Item No. 2). c. signs, No. 3). d. e. $ 37,000.00 if Contractor is notified no later than 180 consecutive calendar days following the date of commencement. Allowance No. 3, design, purchase and installation of interior exterior signs, applied letters and plaques (Addendum No. 4, Item $ 17,000.00 if Contractor is notified no. later than 180 consecutive calendar days following the date of commencement. Interior painting (Addendum No. 4, Item No. 4). Sound $ 88,957.00 if Contractor is notified no later than 300 consecutive calendar days following the date of commencement. reinforcement system '(Addendum No. 4, Item No. 5). $ 75,896.00 if Contractor is notified no later than 300 consecutive calendar days following the date of commencement. f. Stage drapery, stage rigging, and fire curtain (Addendum No. 4, Item Nos. 6, 7 and 8). $ 280,350.00 if Contractor is notified no later than 300 consecutive calendar days following the date of commencement. 5a 1 • • g. 'Acoustical reflector panels at the ceiling and at surrounding walls in Auditorium 105 (Addendum No. 4, Item No. 9). $ 115,402.00 if Contractor is notified no later than 180 consecutive calendar days following the date of commencement. h. Suspended acoustical ceilings (Addendum No. 4, Item No. 10). $ 21,745.00 if Contractor is notified no later than 300 consecutive calendar days following the date of commencement. i. Resilient flooring, base and accessories (Addendum No. 4, Item Nos. 11 and 12). j• $ 14,450.00 if Contractor is notified no later than 360 consecutive calendar days following the date of commencement. Ceramic tile and marble (Addendum No. 4, Item No. 13). $ 14,214.00 if Contractor is notified no later than 270 consecutive calendar days following the date of commencement. k. Acoustical wall panels and wood-fibered acoustic panels (Addendum No. 4, Item Nos. 14 and 15). $ 10,517.00 if Contractor is notified no later than 330 consecutive calendar days following the date of commencement. 1. Window treatment (Addendum No. 4, Item No. 16)- $ 4,081.00 if Contractor is notified no later than 390 consecutive calendar days following the date of commencement. m. Chillers C-1 and C-2; Air Handling Units 3, 5, 8 and 10; Return Air Fans 1 and 2; and Unit Heaters UH -1 and UH -1 (Addendum No. 4, Item Nos. 17 and 18). $ 98,308.00 if Contractor notified no later than October 1, 1990. 5b • n. ' Steam (Addendum No. • N. Humidifiers H-3, N-5, H-8 and H-10 in Mechanical Room 114 4, Item No. 19). if Contractor $ 2,036.00 notified no later than October 1, 1990. o . Steam Boilers B-1 and B-2 and Domestic Hot Water Generator in Mechanical Room 114 (Addendum No. 4, Item No. 20). $ 28,297.00 if Contractor notified no later than August 31, 1990. p. Flexible connectors for chillers and pumps in Mechanical Room 114; Convertor C-1 and Unit Heaters UH -1 and UH -2 in Mechanical Room 114; and Expansion Tanks, Air Separators and Pumps P-2, P-3, P-4 and P-5 in Mechanical Room 114 (Addendum No. 4, Item No. 21). if Contractor notified no later than $ 19,791.00 October 1, 1990. q. Piping in Mechanical Room 114 and all plumbing fixtures in the building (Addendum No. 4, Item Nos. 22 and 23). if Contractor notified no $ 53,128.00 later than November 1, 1990. ✓ . All sheet metal in Mechanical Room 114 and all grilles, registers and diffusers throughout the building (Addendum No. 4, Item Nos. 24 and 25). if Contractor notified no later than s. Mechanical insulation on piping, ductwork Mechanical Room 114 (Addendum No. 4, Item No. 26). if Contractor notified no later than $ 51,689.00 • January 1, 1991. and equipment in $ 14,024.00 September 1, 1990. • t. Automatic temperature controls (Addendum No. 4, Item No. 27). $ 172,359.00 if Contractor notified no later than September 30, 1990. 5c • . • u. • Stage lighting control system (Addendum No. 4, Item No. 28). $ 226,240.00 if Contractor notified no later than January 1, 1991. v. Emergency electrical generator (Addendum No. 4, Item No. 29). $ 12,194.00 if Contractor notified no later than December 31, 1990. w. Fire alarm equipment (Addendum No. 4, Item No. 30). $ 7,859.00 if Contractor notified no later than November 1, 1990. x. Lighting fixtures (Addendum No. 4, Item No. 31). $ 140,238.00 if Contractor notified no later than September 30, 1990. y. Access ramp covers, entry canopies and construction of solid masonry walls above elevation 57.0' including precast architectural copings (Alternate Bid Nos. 4 and 5). $ 118,000.00 if Contractor is notified no later than 30 consecutive calendar days following the date of commencement. z. Asphalt concrete paving and installation of planting materials (Alternate Bid No. 3). $ 28,000.00 if Contractor is notified no later than 270 consecutive calendar days following the date of commencement. aa. Hydraulic elevator (Alternate Bid No. 2). $ 29,000.00 if Contractor is notified no later than 120 consecutive calendar days following the date of commencement. bb. Orchestra pit lift (Alternate Bid No. 1). $ 151,000.00 if Contractor is notified no later than 60 consecutive calendar days following the date of commencement. Sd • . ,. • • • • ;.. ARTICLE 8 TERMINATION OR SUSPENSION • 8.1 The Contract may be terminated by the Owner or the Contractor as provid- ed in Article 14 of the General Conditions. 8.2 The Work may be suspended by the Owner as provided in Article 14 of the General Conditions. 5e • • • • • ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement. are enumerated as follows: 9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document Al 01. 1987 Edition. 9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201, 1987 Edition 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated January 17, 1990 , and are as follows • Document Title Pages Supplementary Conditions F.1 thru F.7 Scope of Contracts G.1 thru G.3 9.1.4 The Specifications are those contained in the Project Manual dared as in Subparagraph 9 1.3, and are as follows: (bitter 1,51 lbe ,SpecsOOrauans bore or refer to an exhibit allached lo Ibis Agreement ) Section Title Pages See attached Exhibit A AIA DOCUMENT A101 • OsX NER CONTRA( IOR AGREEMENT • TWELFTH EI.ITR)N • AIA • Cs: ;9R' 111 AMI RR A's INS- III TI of AR( "Il F( Ii"AS NI u YORK A) E'l'F '' N V AMIINGT4 •N I]1 2:e. Y. Al01-1987 6 • , . • 1. •• • • 9.1.5 The brawings are as follows. and are dated (Either Hsi the Draavngs bere or refer to an exbtbrl analbed Io tbrs Agreement.) Number Title See attached Exhibit B • • unless a different dale is shown below. Date 9.1.6 The Addendaif any, are as follows. Number Date Pages Addendum No. 1 February 14, 1990 21 Addendum No. 2 February 22, 1990 4 Addendum No. 3 February 27, 1990 3 Addendum No. 4 April 12, 1990 4 Addendum No. 5 April 20, 1990 2 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Ar:Icle 9 AIA DOCUMENT A101 • OUNEP CONTRACTOR AGREEMENT • TUELFIH E11I1ION • ALA, • G1914' THE ELME R:E AN IN\TI1(1F OF ARCMITFcT} 1135 NEU YORK 1\'ENL'F '. IX EL'EP\t 1L'N D1 Pxxx A101-1987 7 • • 11 • • • 9.1.7 Other documents, if any, forming pan of the Contract Documents are as follows: am bene any additional documents ubnb are intended to form part of Ibe Contract Documents The Genera( Conditions provide that bidding requirements sueb as advertisement in mrrmturn 10 bid Marin nous in Rudders. sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated rn tbrs Agreement mel should be listed bere may if intended to be part of the Contract Docvmenls ) None APPROVED •)FFICF OF FACILITIES PLANNING AND CONSTRUCTION UNIVERSITY r ARRAN BY: DATE: APPROVED MAY 21 1990 BBS Sllq% Io By s . v.,s This Agreement is entered into as of the day and year executed in at least three original copies of which one is to be delivered to the Contractor, one to the Architect for use in the administration of the Contreact, and ..57/the remainder to the Owner. Date: �/ V f n irst written above and is OWNER / BOARD OF RUSTEES, UNIVERSITY OF ARKANSAS l. Oa/ r, 4 a Chamberlain terim President (Printed name and title) \'ice Car.. .Fir = c... is'reti OWNER 91TY OF FAYE'ITEVILLE, AR CONTRACTOR CARSON & ASSOCIATES, INC. 944.-1_1 ISlgnotrere) / (.Signabrre) (pirated name and tide) (printed name and tide) er3 Pr •".1...1 AIA DOCUMENT A101 • 01T SLR CON -RAC TOP AGRFFME'T • TWFIFTII EDITION • AIM' • t 10P" 711EAMFR5c ANINSTI:l 1I- lh ARI 111111'TN I -ie NfU 1ORA AOI NI F 'q. ' k1/411'St.TON D( ?pre. A101-1987 8 • • • • 1 • EXHIBIT A - PAGE ONE 11. Division and Title • Pages A Advertisement A.1 only B Information for Bidders B.1 - B.2 C Bid Form C.1 - C.5 D Arkansas Statutory Performance & Payment Bond D.1 - D.2 E General Conditions, AIA Document A201 1 - 24 F Supplementary Conditions F.1 - F.7 G Scope of Contracts G.1 - G.3 01000 General Requirements 1 - 3 01020 Allowances 1 - 2 01027 Applications for Payment 1 - 5 01200 Project Meetings 1 - 2 01300 Submittals 1 - 6 01500 Temporary Facilities 1 - 5 01700 Project Closeout 1 - 5 01740 Warranties and Bonds 1 - 3 02110 Site Clearing and Demolition 02200 Earthwork 02282 Termite Control 02380 Drilled Caissons (Piers) 02480 Planting 02513 Asphalt Concrete Paving 02514 Portland Cement Concrete Paving 02515 Unit Pavers 1 - 2 1 - 6 1 - 2 1 - 5 1 only 1 - 2 1 - 6 1 - 3 03300 Cast -In -Place Concrete 1 - 15 03450 Architectural Precast Concrete 1 - 7 03520 Lightweight Insulating Concrete 1 - 2 04200 Unit Masonry 1 - 11 05120 Structural Steel 05210 Steel Joists 05310 Metal Decking 05410 Lightgage Metal Framing 05500 Metal Fabrications 05520 Handrails and Railings 05715 Prefabricated Spiral Stairs 06100 Rough Carpentry 06200 Finish Carpentry 06400 Architectural Woodwork 1 - 3 1 only 1 - 2 1 - 3 1 - 6 1 - 5 1 - 4 07100 Waterproofing 1 - 3 07200 Insulation 1 - 3 07250 Fireproofing 1 - 4 07500 Membrane Roofing 1 - 10 07600 Flashing and Sheet Metal 1 - 4 A.1 • • • • • EXHIBIT s4 - PAGE TWO • Division and Title Pages 07700 Roof Specialties and Accessories 1 - 2 07820 Sloped Canopies 1 - 3 07900 Joint Sealers 1 - 3 08110 Steel Doors and Frames 1 - 5 08210 Wood Doors 1 - 4 08305 Access Panels 1 only 08330 Overhead Coiling Doors and Grilles 1 - 2 08380 Flush Acoustical Doors and Frames 1 - 3 08410 Aluminum Entrances, Storefronts and Windows 1 - 3 08710 Finish Hardware 1 - 3 08800 Glass and Glazing 1 - 4 09200 Lath and Plaster 09250 Gypsum Drywall 09300 Tile and Marble Work 09510 Acoustical Ceilings 09521 Acoustical Wall Panels 09590 Resilient Wood Flooring Systems 09650 Resilient Flooring 09678 Resilient Base and Accessories 09680 Carpeting 09780 Floor Treatment 09900 Painting 09960 Vinyl Wall Coverings 10000 Miscellaneous Building Specialties 10160 Toilet Partitions 10400 Identifying Devices 10500 Metal Lockers 10800 Toilet and Bath Accessories 11062 Stage Drapery 11064 Stage Rigging 11065 Fire Curtain 11130 Sound Reinforcement Systems 12500 Window Treatment 14240 Hydraulic Elevator 14430 Orchestra Pit Lift • 1 - 7 1 - 7 1 - 4 1 - 4 1 only 1 - 2 1 - 4 1 - 2 1 only 1 - 2 1 - 9 1 - 2 1 - 4 1 - 4 1 - 10 15010 Basic Mechanical Requirements 1 - 14 15050 Basic Materials and Methods 1 - 14 15250 Mechanical Insulation 1 - 7 15310 Fire Protection 1 - 4 15400 Plumbing 1 - 10 15500 Heating, Ventilating 6 Air Conditioning 1 - 5 15550 Heat Generation 1 only 15650 Refrigeration 1 - 3 A.2 • • EXHIBIT, A - PAGE THREE Division and Title Pages 15750 Heat Transfer 15850 Air Handling 15880 Air Distribution 15950 Controls 15990 Testing, Adjusting, Balancing and Closeout 16010 Basic Electrical Requirements 1 - 8 16050 Basic Electrical Materials and Methods 1 - 14 16110 Cable System Raceways 1 - 2 16400 Service 6 Distribution 1 - 5 16500 Lighting 1 - 4 16580 Stage Lighting Control System 1 - 14 16581 Stage Wiring Devices 1 - 3 16620 Emergency (Standby) Power Generation System 1 - 14 16721 Fire Alarm Systems 1 - 8 16722 Security Systems 1 - 4 16740 Telephone Support Systems 1 only 16920 Environmental System Control 1 only 16990 Project Closeout 1 - 4 A.3 • • 9• EXHIBIT .B - PAGE ONE • The Drawings are as follows and are dated January 17, 1990 r Architectural A1.0 A1.1 A1.2 A1.3 Cover Sheet Topographic Survey Demolition Plan Site Plan Site Details Site Details A2.1 Building Dimension Plan A2.2 Building Floor Plan - Ground Level A2.3 Building Floor Plan - Balcony Level & Part.Flr.Plans/Rm.Fin.Schedule A2.4 Partial Floor Plan - Ground Level A2.5 Partial Floor Plan - Ground Level A2.6 Partial Floor Plan - Balcony Level A2.7 Partial Floor Plan - Balcony Level A2.8 Partial Auditorium Floor Plan - Ground Level A2.9 Partial Auditorium Floor Plan - Ground Level A2.10 Partial Auditorium Floor Plan - Balcony Level A2.11 Partial Auditorium Floor Plan - Balcony Level A2.12 Partial Floor Plan - Orchestra Pit/Flybridge/Loading Bridge A2.13 Partial Floor Plans & Catwalk Details A2.14 Roof Plan & Roof Details A2.15 Column Details A2.16 Column Details A2.17 Column Details A3.1 A3.2 A3.3 A3.4 A3.5 A3.6 A3.7 A3.8 A3.9 A3.10 A3.11 A3.12 A4.1 A4.2 A4.3 A4.4 A4.5 A4.6 A4.7 A4.8 North Elevation East Elevation South Elevation West Elevation Building Sections Building Sections Building Sections Building Sections Building Sections Building Sections Building Section Sections & Details Wall Wall Wall Wall Wall Wall Wall Wall Sections Sections Sections Sections Sections Sections Sections Sections & Details & Details & Details & Details & Details & Details & Details 6 Details B.1 • • •• • • EXHIBIT•B - PAGE TWO z. • A4.9 Wall Sections & Details A4.10 Wall Sections & Details A4.11 Sections A5.1 Stair Plans & Sections A5.2 Stair Plans & Sections A5.3 Sections, Details & Elevations A5.4 Stair/Ladder Elevations/Details & Schedule A5.5 Spiral Stairs & Rail Details A6.1 Toilet Plans & Elevations A6.2 Toilet Plans & Elevations A7.1 Door Schedule A7.2 Storefront Elevations & Details A7.3 Door Details A7.4 Door Details A7.5 Door & Window Details A8.I Millwork A8.2 Millwork A8.3 Millwork A8.4 Stage & Pit Details A8.5 Stage & Pit Details A8 6 Details A9.1 Partial Reflected Ceiling Plan - Ground Level A9.2 Partial Reflected Ceiling Plan - Ground Level A9.3 Partial Reflected Ceiling Plan - Balcony Level A9.4 Partial Reflected Ceiling Plan - Balcony Level A9.5 Acoustical Reflector Panels Sections TR.1 Stage Rigging Plan TR.2 Stage Rigging Section & Details TR.3 Stage Rigging Elevations TR.4 Sliding Tormentor Panels & Details TR.5 Stage Rigging, Fire Curtain & Details Sound Reinforcement System SS.1 SS.2 SS.3 SS.4 SS. 5 SS.6 SS.7 SS.8 Legend, Conduit Riser Diagram Partial Floor Plan - Ground Level Partial Floor Plan - Ground Level Partial Floor Plan - Balcony Level Partial Floor Plan - Balcony Level Plan - Catwalk Level Speaker Array Details Audio Diagrams B.2