HomeMy WebLinkAbout191-90 RESOLUTIONRESOLUTION NO. 191-90 A RESOLUTION APPROVING A CHANGE ORDER TO THE DAVIDSON STREET PROJECT WITH FAYETTE TREE & TRENCH. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute a change order to the contract with Fayette Tree & Trench in the amount of $16,174.74 for the Davidson Street project. A copy of the change order authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 4th day of APPROVED: By: 4.i !Gine/2 Mayor i$ -ATTEST: SBY Citya 24. . �j S %jr ' t t h a✓ 1 r • December , 1990. CEI Engineering Associates, Inc. Engineers • Planners • Surveyors November 8, 1990 Mr. Sid No=bash Assistant City Engineer City of Fayetteville 113 W. Mountain St. Fayetteville, AR 72701 Re: Davidson St. Sewer Rehabilitation Project Cost Overrun Review;- 110 eview 110 West Central Bentonville, AR 72712 (501)273-94 72 FAX (501) 273-0844 Sir: This letter is to review the cost overruns on the Davidson St. Sewer Rehabilitation Project. ITEM # 1A 6" PVC GRAVITY SEWER These cost overruns are due to the 6" sewer services necessary to tie existing 6" services to new sewer mains. ITEM #18 8" PVC GRAVITY SEWER These cost overruns are due to of the proposed sewer main replacement between Huntsville Rd. and Center St. ITEM A 1C. 18" PVC GRAVITY SEWER These cost overruns are due to of. the proposed sewer mainreplacement between 15th St. and City Lumber Co. ITEM p 2B 18" DUCTILE IRON GRAVITY SEWER These cost overruns are due to re-routes of the proposed sewer main replacement between 15th, St. and City Lumber Co. ITEM # 3 SANITARY SEWER MANHOLES These overruns were due to re-routes of the proposed sewer Main replacement of the "A" line from Huntsville Rd. and Center St. and the re-route of the "D" line from 15th St. to City Lumber Co. ITEM # 4 CLASS 7 BACKFILL These overruns were due to poor ground conditions of the "E" and "F" lines on Davidson St. and the "G' line on Halsell Rd. These three lines accounted for approximately $10,000.00 of the total overrun on this item. Vices; Fresno, California Bentonville, Arkansas Davidson St. Sewer Cost Overrun Review 11/8/90 Page - !2 • ITEM *''6 CLASS B CONCRETE SEWER'HAIN ENCASEMENT The overrun on this item was due to the re-route of the "D" line_from 15th St. to City Lumber Co. This section didn't have adequate depth for protection of the sewer main. ITEM 418 4" SERVICE LINES The overrun on this item was due to the re-routes of the "A" line from Huntsville Rd. to Center St. and the re-route of the "D" line from 15th St. to City Lumber Co. And also -the existence of Orange Burg Sewer Service pipe which was replaced with SCH 40 PVC sewer service pipe. The existence of the Orange Burg pipe was on the A,B,C,D and E lines. ITEM 4311 4" SERVICE TAPS • The overrun on this item was due to the existence of sewer service taps to the existing sewer mains that were replace with a new sewer main. ITEM 4 13 ROCK EXCAVATION Overrun due to the existence of rock on the "B" , "E" and "H" lines. Sir, I hope this review explains the cost overruns on this project. Enclosed please find a quantities report showing the bid quantities and actual quantities used on this project. If you have any questions, feel free to call. Sincerely, j : N • David Sbanotto c: MCJ/REH/File 4077GL2/js J if DAVIDSON STREET SEWER REHABILITATION QUANTITIES REPORT FOR THE CITY OF FAYETTEVILLE JOB 11 4077 PAGE 1 OF 2 ITEM BID ACTUAL NO. BID ITEM QUANTITIES QUANTITIES UNIT PRICE DEDUCT ADDITION SDR -35 6" PVC Gravity IA Sewer Main 0-6' Cut SDR -35 .6" PVC Gravity Sewer Main 6'-8' Cut SDR -35 6" PVC Gravity Sewer Main 8'-10' Cut SDR -35 8" PVC Gravity 1B Sewer Main 0-6' Cut SDR -35 8" PVC Gravity Sewer Main 6'-8' Cut SDR -35 8" PVC Gravity Sewer Main 8'-10' Cut PS -46 18" PVC Gravity Sewer Main 0-6' Cut PS -46 18" PVC Gravity Sewer Main 6'-8' Cut PS -46 18" PVC Gravity Sewer Main 8'-10' Cut PS -46 18" PVC Gravity Sewer Main 10'-12' Cut . PS -46,18" PVC Gravity Sewer .Main 12'-14' Cut 8" Class 50 Ductile Iron 2A Gravity Sewer Main 0-6' Cut 18" 'Class 50 Ductile Iron 2B Gravity Sewer Main 0-6' Cut 18" Class 50 Ductile Iron Gravity Sewer Main 6-8' Cut 18" Class 50 Ductile Iron Gravity Sewer Main 8-10'Cut Sanitary Manhole w/ring 3A and Lid 0-6' Depth Sanitary Manhole w/ring 3B and Lid 6'-8' Depth Sanitary Manhole w/ring 3C and Lid 8'-10' Depth 1636 LF 439 LF 160 LF 1385 LF 540 LF 63 LF 448 LF 625 LF 862 LF 237 LF 103 LF 60 LF 77 LF 10 LF 13 LF 16 EA 3 EA 5 EA 1801 LF 436 LF 211 LF 1316 LF 535 LF 186 LF 347 LF 600 LF 580 LF 503 LF 105 LF 60 LF 136 LF 11 LF 13 LF 17 EA 5 EA 3 EA 15.69 2,588.85 17.69 53.07 20.19 1,029.69 16.52 1,139.88 18.52 92.60 - 21.02 2,585.46 25.15 29.15 30.65 2,540.15 728.75 8,643.30 33.65 _ 8,950.90 38.15 76.30 26.25 39.10 2,306.90 43.10 49.10 850.00 1,000.00 1,200.00 2,400.00 43.10 850.00 2,000.00 ITEM NO. BID ITEM DAVIDSON STREET SEWER REHABILITATION QUANTITIES REPORT FOR THE CITY OF FAYETTEVILLE Sanitary Manhole w/ring 3D and Lid 10'-12' Depth Tons of Class 7 Base for Pipe Embedment and Street 4 Crossings 3000.PSI Concrete Pavement 5 Repair Class B Concrete Sewer 6 Main Encasement Aerial Crossing w/concrete Steel and Hardware 4" SDR 35 or Cast Iron 8 Soil Pipe Service Line Hwy. 16 Crossing/Pavement 9 Repair to AHTD Spec. 6" or 4" Service Line 10 Taps Line "D" 4" Service Line Taps 11 Line A,B,C,E;F,G, & H 6" Service Line Taps 12 Line A,B,C,E,F,G, & H 13 Rock Excavation 14 Change Order'lll h JOB 11 4077 PAGE 2 OF 2 BID ACTUAL QUANTITIES QUANTITIES UNIT PRICE DEDUCT. ADDITION 2 E 3 EA. 1,350.00 1,350.00 2,777 TONS 3,819.13•T0Ni 10.75 11,202:90 961) SY 861.12 SY 22.00 2,197.36 25 CY 30 CY 75.00 375.00 1 L.S.• 1 L.S. 3,050.00 -0- 400 LF 1,234.5 LF 7.50 6,258.75 1 L.S. -0- ' 5,074.00 5,074.00 15 EA 11 EA• 225.00 900.00 44 EA 46 EA' 106.00 212.00 11 EA 6 EAt 110.00 550.00 10 CY 23.28 CY 50.00 664.00 1 EA 1 EA 971.46 TOTAL 24,319.11 40,493.85 NET ADD 16,174.74 ORIGINAL CONTRACT 243,378.91 CHANGE ORDER 971.46 VALUE OF WORK COMPLETED 260,525.11 % OVERRUN 6.62%