Loading...
HomeMy WebLinkAbout152-90 RESOLUTION.74 • RESOLUTION NO. 152-90 A RESOLUTION APPROVING CHANGE ORDER #2 ON THE DAVIDSON` STREET SEWER LINE REPLACEMENT PROJECT. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute Change Order #2 in the amount of $2,531.70 amending the engineering contract with DEI Engineering for the Davidson Street Sewer Line Replacement Project. A copy of the change order authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 16th day of October , 1990. ATTEST: a a E 13Y City Clerk ti a VAN APPROVED: By: l:4 Mayor evi AMENDMENT TO AGREEMENT FOR ENGINEERING SERVICES NO. TWO (2) This is an amendment to the Agreement for Engineering Services executed on the 12th day of April 1989 and as amended on the 4th day of August 1989 between the City of Fayetteville, Arkansas and CEI Engineering Associates, Inc. for the Davidson Street Sewer Rehabilitation Project. The City has requested that CEI reroute two separate portions of sanitary sewer line segments already surveyed, designed, and approved for construction due to easement/property owner conflict. The reroutes involve additional surveying, design, drafting and easement preparation for approximately 560 LF of 8" sewer main and 850 LF of 18" sewer main. CEI Engineering Associates, Inc. agrees to perform the various professional engineering services for the design and construction of said additional segment. The CITY shall compensate the ENGINEER inaccordance with the following schedule: Part 1: For professional services required to complete detailed plans and specifications for the above referenced project, including surveys for easement purposes and $2,000 for the preparation of easements and plats for easement acquisition said amount ($2,000) to be adjusted based on actual easement requirements, the CITY shall compensate the ENGINEER with the lump sum fee of $11,029.47 .(Eleven thousand twenty-nine and 47/100 dollars) Part 2: For professional services for the bid phase of the project, through the recommendation of awards, the CITY shall compensate the ENGINEER with the lump sum fee of $ 1,227.14 (One thousand two hundred twenty seven and 14/100 dollars) Part 3: For professional services required to perform construction management including one full time inspector for the entire estimated construction period and preparation of "As -Built" drawings, the CITY shall compensate the ENGINEER with the lump sum fee of $ 8,575.18 (Eight thousand five hundred seventy five and 18/100 dollars) (1) Said amounts reflecting a proportional amount of a total increase of $2,531.79 (Two thousand five hundred thirty one and 79/100 dollars) This amendment does not affect or alter any contract provision other than what is clearly stated herein. (2) APPROVAL IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Amendment in duplicate on the respective dates indicated below. (SEAL) ATTEST: CITY: „rr., wo---- By (7Z2Coine/ nS ITypeName Sherry L. Thomas u, title wJ• Vr, City Clerk (SEAL) ATTEST: Type Name William V/ Martin Title Date October 16,11990 Mayor By Type Name David Sbanotto Type Name Robert E. Holmes Title Inspection Supervisor Title President Date ENGINEER: (3)