HomeMy WebLinkAbout143-90 RESOLUTION•
•
RESOLUTION NO.
1
<�`AL 90
A RESOLUTION ADOPTING AN AMENDMENT TO THE
COMPETITIVE SELECTION OF PROFESSIONAL SERVICES
POLICY TO FOLLOW THE STATE LAW FOR TWO-STEP
SEALED BIDDING WHEN DEALING WITH HIGHLY
TECHNICAL ITEMS.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the Board of Directors hereby amends the
Policy & Procedures Manual to include Section PUR-2B as part of
the Professional Services Policy of the City of Fayetteville be
and the same hereby is attached and made a part hereof.
PASSED AND APPROVED this 18tllday of S ptemher
APPROVED:
By:
\�11
!-.
•�` �� i at
ATTEST �
11:3-40-
, 1990.
Mayor
ADMINISTRATIVE
POLICIES Q PROCEDURES
MANUAL
NUMBER REVISIONS
PUR-2B
SUPERSEDES
0
APPROVED SY:
SUBJECT:
Purchasing
Formal Bids
Two -Step
EFFECTIVE DATE:
June 1, 1990
PAGE
1.
PUR-28.0: /PURPOSE
The purpose of this directive is to establish two\step
formal bid procedures and responsibilities.
PUR-2B,1; DEFINITION
Two -Step sealed bidding for highly technical items will
be allowed as an alternate to regular formal bids when
it is impractical to initially prepare a purchase
description to support an award based on price. An
invitation for bids may be issued requesting the
submission of unpriced technical proposals to be followed
by an invitation for bids limited to those bidders whose
technical proposals meet the requirements set forth in
the first invitation. The following prerequisites must
exist: (1) available specifications are inadequate or are
not sufficiently definite to permit full and free
competition without technical evaluation or technical
discussion to ensure mutual understanding between the
City and the prospective contractors; (2) definite
criteria exist for evaluating technical proposals; (3)
two or more technically qualified sources are expected
to compete; (4) sufficient time is available to permit
use of the two-step method; and (5).a firm fixed-price
contract or a fixed-price contract with escalation will
be used.
PUR-2B.2: RESPONSIBILITY
It will be the determination of the Purchasing Manager,
after conference with the Department and consultants,
and concurrence by the City Manager to determine if the
items to be purchased will fit into the two-step bid
procedure or if they must adhere to regular formal
bidding procedures. Once determination is made, it will
be the responsibility of the department to prepare the
basic bid documents and advertisements on the City of
Fayetteville formal bid forms. The Purchasing Manager
(or his designee) will be available to assist in the
preparation.
1
PUR-2B.3: PROCEDURE
A. prior to Bid Opening:
Department/Division Heads will obtain the formal bid
form package from the Purchasing Office. They will
then complete a draft of the advertisement, develop
technical specifications, bid form, and any special
conditions that are needed. The Department/Division
Head must assign a funded expense code to cover the
anticipated cost. The draft copy will then be
submitted to the Purchasing Manager for assigning
of a bid number, and the list of the prospective
bidders the Department Head wishes to receive bids
from. (Departments/Divisions will be responsible
for final copy of specifications to be presented to
Purchasing Manager.) The Purchasing Manager will
ensure that bid opening dates, advertising dates,
etc., are properly coordinated in accordance with
State law; he/she willthenplace the advertisement
and maintain a bid file.
B. Before assigning a bid number and advertisement of
the bid a review committee which shall include one
Board Member appointed by the Mayor to serve and
represent the Board, the City Manager (or
representative), the Chief Financial Officer (or
representative), the involved Department/Division
Heads, appropriate City personnel and may include
professionals, and/or individuals with expertise in
the community shall be established. The review
committee shall establish the qualifications and
evaluation criteria necessary for the specific
technical proposals to be evaluated.
C. The Bid shall outline the structure of the selection
committee and shall state the point ranges which
will be used to qualify the firms to enter into the
second step of the bidding process. It shall also
state an expected cost range for the technical
proposal.
D. After selection of the technical proposals is made
an invitation for bids will be sent out limited to
those bidders whose technical proposals met the
requirements set forth in the first invitation.
E . Bid Opening:
The Purchasing Manager or his designee will receive
all sealed bids. All present will sign a bid
attendance sheet reflecting their name, company or
business affiliation. Upon opening of bids, the
Purchasing Manager will read the submitted bids to
all present and then prepare a bid analysis spread
sheet. Once this has been completed, the Purchasing
Manager, User Departments,. and Administrative
Services, on an as needed basis, will review the
bids and attached spread sheet to ensure that all
requirements have been met.
F. Contract Award:
Upon contract award and authorization by the City
Manager in case of contracts under $10,000, or the
City Board of Directors for contracts over $10,000,
based upon purchasing bid procedures of the City,
the Purchasing Manager will assure that the award
will be issued as follows:
- Copy to Accounts Payable
(for encumbrance)
- Awarded Vendor
- User Department(s), and
- File copy in Purchasing
Office.
G . Notice to Proceed:
Upon contract award and authorization, the User
Department will submit a purchase requisition and
obtain a purchase order before notice to proceed is
given. (Refer to PUR-1.3. IMPLEMENTATION).