HomeMy WebLinkAbout126-90 RESOLUTIONRESOLUTION NO. 126_90 'r t' 4 .. IA - " 4 r A RESOLUTION APPROVING'CHANGE ORDER #3 ON THE CATO SPRINGS ROAD-HWY 71 WATER & SEWER RELOCATION PROJECT. • • BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: $ 1 ; • •F .v' A , Sectiun 1. That the Mayor and City Clerk are hereby authorized and directed to execute Change Order #3 in the amount of $7,127.08. A copy of the change order authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 21st day of Aiu31st • `ATTEST: n YBy: st �' City C erkyt' • 1990. der ORDER S7- 9a MICROFILMED OWNER INGINEERig CONTRACTOR GI OTHER Cl PROJECT: (Ui i lityR� elocat iioons,at.R elocated„7 (Name, Address) tfleS.`Hwy 71.Fayettevil,le,_AR. TO CONTRACTOR: Don Mitchell, Inc. (Name, Address) 883 White Oak Drive Rogers, Ar. 72756 CHANGE ORDER NO:3 (DAIE;_J lu y-16,71990 ENGINEER'S PROJECT NO: 88098 CONTRACT PATE: April 30, 1990 CONTRACT FOR: Water L Sewer Location The Contract is changed as follows: This change' order deletes change order No. 2, dated June 13, 1990. This change order was made necessary because existing 16" casing could not be pushed, so a 14" casing will be installed through the existing 16!' casing under this change order. SEE ATTACHED PAGE NOT VALID UNTIL SIGNED BY THE OWNER, ENGINEER AND CONTRACTOR The original (Contract Sum) (Guaranteed Maximum Price) was $ 354,395.45 Net change by previously authorized Change Orders $ 3,357.10 The (Contract Sum)(fnnRRRtegMx$niratxRxizrixprior to this Change Order was $ 357,752.55 The (Contract Sum/j:WRitnimaAxNaxisimmxRXismi will be (increased) ld®maxeaaaul.kkaarkawgfikxby this Change Order in the amount of$ 24,664.06 The new (Contract Bum1ARtk*RRAtRRAxJRXitktxRXizti including this Change Order wi)1 be f 382,416.61 The Contract Time will be (*RRRRAs,AUAiricammiisi(unchanged) by ( 0 ) days. The .date of Substantial 'Completion as of the date of the Change Order therefore -is--- August 13, 1990 NOTE: This summary does not reflect changes in the Contract Sus, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. Crafton, Tull & Assoc. Don Mitchell, Inc. ENGINEER CONTRACTOR 2800 N. 2nd 883 White Oak Drive ADDRESS ADDRESS4 Rogers, AR. Rogers,. AR. ec207,7 44/VVA/ 14.:L DATE 7//7, f d City of Fayetteville OWNER 113 West Mountain ADDRESS Fayeyteville, 9. Maga r- A. PIG BORE PIT, SET UF' BORING RAIL AND INSTALL EQUIPMENT P . BACKFILL AND COMPACT EXISTING EXCAVATION C. D . BORE 178' AND EXTEND 400' - 14" CASING THRU EXISTING 16" CASING BACKFILL AND COMPACT BORE F'IT TOTAL $ 1,069.00 2,686.00 30,208.06 1,112.00 $35,075.06 ADD ITEM 4.11' BORED HIGHWAY CROSSING, INCLUDING 478'-14" STEEL CASING. 0.355 " WALL THICKNESS, INSTALLED COMPLETE: UNIT QUANTITY . L .F. 478 COST/UNIT .$ 73.38 TOTAL PRICE $35,075.06 COMPLETED AND ACCEPTED WORI: PERFORMED UNDER THIS ITEM SHALL BE PAID FOR AT THE PRICE PER LINEAR FOOT BID IN THE PROPOSAL. THIS ITEM SHALL. CONSIST OF INSTALLING A 14" STEEL CASING INCLUDING BORING PIT, LABOR, MATERIALS, EQUIPMENT, AREA CLEANUP, ETC., NECESSARY TO COMPLETE CASING INSTALLATION AS SPECIFIED, CONTRACTOR SHALL. EXTEND 300 OF 14" STEEL CASING THROUGH AN EXISTING 16" CASING AND BORE AND EXTEND 178' OF 14" STEEL CASING TO MAKE A 478 FOOT RUN OF 14" STEEL CASING. ALL WORK SHALL BE COMPLETED ACCORDING TO THIS EXISTING CONTRACT SPECIFICATIONS. ADD ITEM 3.17 12" BUTTERFLY VALVE, INSTALLED COMPLETE: UNIT QUANTITY EACH 5 COST/UNIT TOTAL PRICE $1,215.00 $ 6,075.00 COMPLETED AND ACCEPTED WORK PERFORMED UNDER THIS ITEM SHALL BE PAID FOR AT THE PRICE BID PER EACH VALVE BID IN THE PROPOSAL. THIS ITEP1 SHALL CONSIST OF INSTALLING 17" BUTTERFLY VALVES INSTALLED COMPLETE, INCLUDING ALL LABOR, MATERIALS; EQUIPMENT, AND INCIDENTALS NECESSARY TO PROPERTY INSTALL THE 12" BUTTERFLY VALVE AS REQUIRED BY THE CITY OF FAYETTEVILLE, ARKANSAS, WATER DEPT. DELETE ITEM 4.1 OPEN CUT HIGHWAY CROSSING INCLUDING 16" STEEL CASING 0.255 ',WALL THICKNESS INSTALLED COMF'LETE INCLUDING E XCAVATION AND BACKFILL WHERE REQUIRED. UNIT QUANTITY L .F. EA. 178 COST/UNIT TOTAL PRICE $87.00 $ 1,000.00 $15,486.00 $1,000.00 TOTAL CHANGE ORDER $24,664.06 r