HomeMy WebLinkAbout110-90 RESOLUTION 110B-90RESOLUTION NO. 1103-90
•
A RESOLUTION.AUTHORIZING A CONTRACT WITH OZARK
LAWN CARE FOR THE SPRINKLER SYSTEM AT THE
ASBELL SOCCER FIELDS.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the Mayor and City Clerk are hereby
authorized and directed to execute a contract in the amount of
$10,740.00 with Ozark Lawn Care for the sprinkler system at the
Abell Soccer Fields. A copy of the contract authorized for
execution hereby is attached hereto marked Exhibit "A" and made a
Dart hereof.
y1t
Z$
;ATTEST:
PASSED AND APPROVED this 'irrl
r By
'day of 7uly
APPROVED
BY: ;;;?----
Asst.
Asst. Mayor
, 1990.
FAYETTEVILLE
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
TO:
THRU: Scott C. Linebaugh, City Manager
FROM:
DATE: July 10, 1990
Fayetteville City Board Of Directors
Kevin D. Crosson, Administrative Services Director
SUBJ: BID 90-33 CONSTRUCTION OF SOCCER FIELD.&
BID 90-34 SPRINKLER SYSTEM FOR SOCCER FIELDS
ASBELL SCHOOL/ GREENSPACE FUNDS
Staff recommends award of Bid 90-33 for construction of Soccer
Field at Asbell School to McClinton -Anchor Company, Division of
APAC-Arkansas, Inc. Their bid was for $14,869.00. They were the
only bidder on the project. Other construction companies notified
of the bid were Amos Construction, Fayette Tree & Trench, Kelly
Leonard & Sons Excavating & Trucking, Tony Kelly Excavating and
Sweetser Construction. Several of the companies notified were
already working on major projects.
Staff recommends award of Bid 90-34 for installation of Sprinkler
Systems for Soccer Fields at Asbell School to the lowest bidder,
Ozark Lawn Care, 3324 Martin, Fayetteville, AR, 72703. They were
the lowest bidder of three bids. Their bid was for $10.,740.00.
The Park's and Recreation Board approved $40,000 towards this
project at their last meeting. The minutes are attached. Both
bids were lower than staff had originally anticipated.
Bid tabulation sheets are attached for your review.
TABULATION OF BIDS
CITY OF FAYETTEVILLE,AR
113 W. MOUNTAIN STREET
FAYETTEVILLE, AR 72701
BID: FORMAL / BID BOND REQUIRED
INFORMAL PERFORMANCE BOND
VERBAL QUOTATION
PROJECT
DESCRIPTION: Soccer Field Construction at Asbell Park
BID NO -#90-33 DATE OPENED: JULY 9, 1990 11:00 a.m.
BIDDER:
ESTIMATED
QUANTITY
1050 C.Y.
McClinton -Anchor Company
Division of APAC-Arkansas,
240 North Block
P.O. Box 1367
Fayetteville, AR 72701
385 C.Y..
100%
CERTIFIED BY:
DATE : 4
Inc.
UNIT PRICE SCHEDULE
ITEM
DESCRIPTION
Fill Placed
,Compacted
Top Soil Placed
& Graded
UNIT
PRICE
& 7.00
Establish Grass
TOTAL BID
AMOUNT
C.Y. 7,350.00
12.20 C.Y. 4,697.00
2,822.00 L.S. 2,822.00
14,869.00
TABULATION OF BIDS
CITY OF FAYETTEVILLE,AR
113 W. MOUNTAIN STREET
FAYETTEVILLE, AR 72701
BID: FORMAL K
INFORMAL+
VERBAL QUOTATION
BID BOND REQUIRED
PERFORMANCE BOND
•
DESCRIPTION: Sprinkler Systems for Soccer Fields at Asbeli
School.
8ID NO $90-34. DATE OPENED: JULY 9, 1990 10:30 a.m.
BIDDER: Ozark Lawn Care
3324 Martin
Fayetteville, AR 72703
Terry Gulley
COST: . $10,740.00.
TAX:
TOTAL COST: $10,740.00
BIDDER:
Revelle Irrigation Systems
RT.4 Box 367-C
•
Springdale, AR 72764
COST:. $11,800.00
TAX: $ 590.00
TOTAL COST: $12,390.00
BIDDER: Johnson Sprinkler & Turf
2101 W. Huntsville
Springdale, AR 72764
COST:- $14,358.00
TAX: $ 227.85
TOTAL COST: $14,585.85
CERTIFIED BY:
DATE: --7-013\
I D
ING MANAGER
•
CONTRACT
This contract executed this llth day of July, 1990, between
the City of Fayetteville, Arkansas, hereinafter called the City,
and Ozark Lawn Care ,hereinafter called the
Contractor, and having an address at 3324 Martin, Fayetteville, AR
and telephone number 521-8868
•
In consideration of the mutual covenants contained herein, the
parties agree as follows:
1. The Contractor at his own cost and expense shall furnish all
labor, materials, supplies, machinery, equipment, tools,
supervision, bonds, insurance, tax permits, and all other
accessories andservices necessary , to complete the
installation of sprinkler systems at the Asbell School Soccer
Fields in accordance with plans and specifications attached
hereto and made a part hereof, as stated in CONTRACTOR'S
PROPOSAL, and in accordance with plans and specifications
attached hereto and made a part hereof under Bid #90-34, all
included herein as if spelled out word for word.
2. The City .shall pay the Contractor the total lump sum of
Ten Thousand Seven Hundred. Forty Dollars ($10,740.00)
upon completion of. all work called for in the plans and
specifications. Said consideration shall be payable to the
Contractor upon jobcompletion and acceptance by the City.
3. The Contract documents which comprise the contract between the
City and the Contractor consist of this Contract and the
following documents attached hereto, marked Exhibit ".A"., and
made a part. hereof:
'A. Bid form identified as Invitation to Bid 90-34 with the
specifications and conditions typed thereon.
B. The Contractor's proposals attached thereto identified.
as Sprinkler System Proposal for Asbell Soccer Fields,
Fayetteville, AR.
C. The Notice to Prospective Bidders and the Bid Tabulation
marked City of Fayetteville, Sprinkler System for Asbell
Soccer Fields, 10:30 A.M., July 9, 1990, to be awarded
by the Fayetteville City Board of Directors at a Special
Meeting held on July 11, 1990.
D. Plans for .said installation identified as Asbell Park
Sprinkler System Addition, dated June 18, 1990.
•
•
•
4. These Contract documents constitute the entire agreement
between the City and the Contractor and may be modified only
by a duly executed written instrument signed by the City and
the Contractor.
Contractor shall not assign his duties under the terms of this
agreement.
6. Contractor agrees to hold the City harmless and indemnify the
City, against any and all claims for property damage, personal
injury or death, arising from Contractor's performance of this
contract.
7.. The Contractor shall furnish a certificate of insurance
addressed to the Owner, showing that he carries the following
insurance which shall be maintained throughout the term of the
Contract.
Workmen's Compensation
Comprehensive General &
Automobile Insurance
Bodily Injury Liability
Property Damage Liability
The insurance
underground coverage.
required herein shall
Statutory Amount
$500,000 for each person
injured.
$1.,000,000 for each
accident.
$250,000 for each accident.
$500,000 aggregate.
shall include explosion, collapse and
The premiums for all insurance and the bond
be paid by the Contractor.
8. Contractor agrees to furnish a Performance Bond, approved by
the City, guaranteeing the performance of this contract, for
not less than one hundred percent of the amount of this
contract. Said performance bond shall be conditioned on full
and complete performance of this contract and acceptance by
the CITY of Fayetteville for the payment of all labor and
materials entering into or incident to the proposed
improvements and shall guarantee the work against faulty
workmanship or materials for a period of one (1) year after
completion. The Contractor agrees to furnish proof of
licensure as required under the terms of Act 150 of the 1965
Acts of the Arkansas Legislature.
9. Contractor shall not commence work on this project until he
has received a permit from the Fayetteville Inspection
Department authorizing him to begin construction on the
project, and the project will be under the inspection of the
Fayetteville .Inspection Department. The actual notice to
proceed will be in writing and will be issued by the City of
Fayetteville Parks Division.
10. Contractor agrees to begin work within ten (10) days after
issuance by the City of a "Work Order" or "Notice to Proceed"
and to complete the work within 30 calendar days thereafter..
11. All work called for herein shall be coordinated directly with
Mr. Dale Clark, Parks and Recreation Director.
WITNESS OUR HANDS THIS_3.4 DAY OF JULY, 1990.
CITY OF FAYETTEVILLE,
FAYETTEVILLE, ARKANSAS
�.
r
ATTEST:
•
_!-
CITY CLERK
C7ka
4v
Y RbSE, CITY ATTORNEY
FORM:.
BY deelassr." ertriwnsol
MAYOR
.- OLS L.r.
FIRM NAME
BUSINESS ADDRESS
RESOLUTION NO. 1108-90
A RESOLUTION AUTHORIZING A CONTRACT WITH OZARK
LAWN CARE FOR THE SPRINKLER SYSTEM AT THE
ASBELL SOCCER FIELDS.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the Mayor and City Clerk are hereby
authorized and directed to execute a contract in the amount of
$10,740.00 with Ozark Lawn Care for the sprinkler system at the
Abell Soccer Fields. A copy of the contract authorized for
execution hereby is attached hereto marked Exhibit "A" and made a
part hereof.
PASSED AND APPROVED this 1r9: day of July
ATTEST:
1i5.44
City C(jerk
APPROVED:
, t990.
FAYETTEVI LLE
THE CITY OF FAYETTEVILLE. ARKANSAS
DEPARTMENTAL CORRESPONDENCE
TO: Fayetteville City Board Of Directors
THRU: Scott C. Linebaugh, City Manager //'L
FROM: Kevin D. Crosson, Administrative Services Director
DATE: July 10, 1990
SUBJ: BID 90-33 CONSTRUCTION OF SOCCER FIELD &
BID 90-34 SPRINKLER SYSTEM FOR SOCCER FIELDS
ASBELL SCHOOL/ GREENSPACE FUNDS
Staff recommends award of Bid 90-33 for construction of Soccer
Field at Asbell School to McClinton -Anchor Company, Division of
APAC-Arkansas, Inc. Their bid was for $14,869.00. They were the
only bidder on the project. Other construction companies notified
of the bid were Amos Construction, Fayette Tree & Trench, Kelly
Leonard & Sons Excavating & Trucking, Tony Kelly Excavating and
Sweetser Construction. Several of the companies notified were
already working on major projects.
Staff recommends award of Bid 90-34 for installation of Sprinkler
Systems for Soccer Fields at Asbell School to the lowest bidder,
Ozark Lawn Care, 3324 Martin, Fayetteville, AR, 72703. They were
the lowest bidder of three bids. Their bid was for $10,740.00.
The Parks and Recreation Board approved $40,000 towards this
project at their last meeting. The minutes are attached. Both
bids were lower than staff had originally anticipated.
Bid tabulation sheets are attached for your review.
TABULATION OF BIDS
CITY OF FAYETTEVILLE,AR
113 W. MOUNTAIN STREET
FAYETTEVILLE, AR 72701
BID:. FORMAL BID BOND REQUIRED
INFORMAL PERFORMANCE BOND
VERBAL QUOTATION
PROJECT
DESCRIPTION: Soccer Field Construction at Asbell Park
BID NO #90-33 DATE OPENED: JULY 9, 1990 11:00 a.m.
BIDDER: McClinton -Anchor Company
Division of APAC-Arkansas, Inc.
240 North Block
P.O. Box 1367
Fayetteville, AR 72701
UNIT PRICE SCMEDULE
ESTIMATED ITEM UNIT AMOUNT
OUANTITY DESCRIPTION PRICE BID
1050 C.Y. Fill Placed & 7.00 C.Y. 7,350.00
Compacted
385 C.Y. Top Soil Placed 12.20 C.Y. 4,697.00
& Graded
100% Establish Grass 2,822.00 L.S. 2,822.00
CERTIFIED BY:
TOTAL BID
DATE. yttd //q0 ectiYI%j(.G
J
SING MANAGER
WITN SS /r
14,869.00
TABULATION OF BIDS
CITY OF FAYETTEVILLE,AR
113 W. MOUNTAIN STREET
FAYERTEVILLE, AR 72701
BID: FORMAL
INFORMAL
VERBAL QUOTATION
K
BID BOND REQUIRED
PERFORMANCE BOND
DESCRIPTION: Sprinkler Systems for Soccer Fields at Asbell
School.
8ID NO #90-34 DATE OPENED: JULY 9, 1990 10:30 a.m.
BIDDER: Ozark Lawn Care
3324 Martin
Fayetteville, AR 72703
Terry Gulley
COST: $10,740.00
TAX:
TOTAL COST: $10,740.00
BIDDER: Revelle Irrigation Systems
RT.4 Box 367-C
Springdale, AR 72764
COST: $11,800.00
TAX: $ 590.00
TOTAL COST: $12,390.00
BIDDER: Johnson Sprinkler & Turf
2101 W. Huntsville
Springdale, AR 72764
COST: $14,358.00
TAX: $ 227:85
TOTAL COST: $14,585.85
CERTIFIED BY:
DATE: 0° -90
CONTRACT
This contract executed this llth day of July, 1990, between
the City of Fayetteville, Arkansas, hereinafter called the City,
and Ozark Lawn Care ,hereinafter called the
Contractor, and having an address at 3324 Martin, Fayetteville, AR
and telephone number 521-8868
In consideration of the mutual covenants contained herein, the
parties agree as follows:
1 The Contractor at his own cost and expense shall furnish all
labor, materials, supplies, machinery, equipment, tools,
supervision, bonds, insurance, tax permits, and all other
accessories and services necessary to complete the
installation of sprinkler systems at the Asbell School Soccer
Fields in accordance with plans and specifications attached
hereto and made a part hereof, as stated in CONTRACTOR'S
PROPOSAL, and in accordance with plans and specifications
attached hereto and made a part hereof under Bid #90-34, all
included herein as if spelled out word for word.
2. The City shall pay the Contractor the total lump sum of
Ten Thousand Seven Hundred Forty Dollars ($10.740.00)
upon completion of all work called for in the plans and
specifications. Said consideration shall be payable to the
Contractor upon jobcompletion and acceptance by the City.
3. The Contract documents which comprise the contract between the
City and the Contractor consist of this Contract and the
following documents attached hereto, marked Exhibit "A", and
made a part hereof:
A. Bid form identified as Invitation to Bid 90-34 with the
specifications and conditions typed thereon.
B. The Contractor's proposals attached thereto identified
as Sprinkler System Proposal for Asbell Soccer Fields,
Fayetteville, AR.
C. The Notice to Prospective Bidders and the Bid Tabulation
marked City of Fayetteville, Sprinkler System for Asbell
Soccer Fields, 10:30 A.M., July 9, 1990, to be awarded
by the Fayetteville City Board of Directors at a Special
Meeting held on July 11, 1990.
D. Plans for said installation identified as Asbell Park
Sprinkler System Addition, dated June 18, 1990.
4. These Contract documents constitute the entire agreement
between the City and the Contractor and may be modified only
by a duly executed written instrument signed by the City and
the Contractor.
5. Contractor shall not assign his duties under the terms of this
agreement.
6. Contractor agrees to hold the City harmless and indemnify the
City, against any and all claims for property damage, personal
injury or death, arising from Contractor's performance of this
contract.
7 The Contractor shall furnish a certificate of insurance
addressed to the Owner, showing that he carries the following
insurance which shall be maintained throughout the term of the
Contract.
Workmen's Compensation Statutory Amount
Comprehensive General &
Automobile Insurance
Bodily Injury Liability
$500,000 for each person
injured.
$1,000,000 for each
accident.
Property Damage Liability $250,000 for each accident.
$500,000 aggregate.
shall include explosion, collapse and
The premiums for all insurance and the bond
be paid by the Contractor.
The insurance
underground coverage.
required herein shall
8. Contractor agrees to furnish a Performance Bond, approved by
the City, guaranteeing the performance of this contract, for
not less than one hundred percent of the amount of this
contract. Said performance bond shall be conditioned on full.
and complete performance of this contract and acceptance by
the CITY of Fayetteville for the payment of all labor and
materials entering into or incident to the proposed
improvements and shall guarantee the work against faulty
workmanship or materials for a period of one (1) year after
completion. The Contractor agrees to furnish proof of
licensure as required under the terms of Act 150 of the 1965
Acts of the Arkansas Legislature.
9 Contractor shall not commence work on this project until he
has received a permit from the Fayetteville Inspection
Department authorizing him to begin construction on the
project, and the project will be under the inspection of the
Fayetteville Inspection Department. The actual notice to
proceed will be in writing and will be issued by the City of
Fayettedille Parks. Division.
10. Contractor agrees to begin work within ten (10) days after
issuance by the City of a "Work Order" or "Notice to Proceed"
and to complete the work within 30 calendar days thereafter.
11. All work called for herein shall be coordinated directly with
Mr. Dale Clark, Parks and Recreation Director.
WITNESS OUR HANDS THIS 3^IA _ ?AY OF JULY, 1990.
ATTEST: CITY CLERK
PROVED AS'2- FORM:
Y RbSE, CITY ATTORNEY
CITY OF FAYETTEVILLE,
FAYETTEVILLE, /ARRK,AN�SAAS
BY ��!/. /
MAYOR
Ota kL. a att.
FIRM NAME
BY°CN �
O NAME AND ITLE
BUSINESS ADDRESS
From:
Sid Norbash
Name
CITY OF FAYETTEVILLE
CONTRACT/LEASE REVIEW
For
MAYOR'S APPROVAL
Engineering/Public Works
Division/Department
Date`�
Project: Lewis Street Soccer Complex - Sprinkler System Contract
o the i A rvti- 1wndLed
Firm: Ozark Lawn Care
Contract: Lump Sum
Please Return to the Above Noted Person By :
December 13, 1994
Budget Review:
BudgetCoordinator Date
119(1/1x/ /a i3 --9V
Accountin. u.-rvisor Date
ty'Atto
Cirn-y v Date
is -13-94
Purchasing Officer
Date
(k a-is-
Intq(1 Auditor oxiaLitcAos. Date
ENG. RES.`IIOt3-9O
CHANGE OtztoEtV
LEWIS ST,
GOCCEie COMPLEX
12.-13-94-
RECEIVED
2-13-99-
RECEIVED
12 -1G -q4
CITY CLERK'S OFFICE
Tom,CSOne-
I1 0.�� 0 ✓1
II 1 1 7 CCHANGEORDER
_
PROJECT TITLEtriA G ' i'retl 3ccer Pe(d Come — �JpY(nk(er S'(Steve‘
PROJECT NO. ql-D (GI -11ACT000 I CONTRNO., 40'91(p - CONTRACT DATE
L
CONTRACTOR Ozark u,n Cara
The following changes are hereby made to the Contract Documents:
aq 1194-
Total o Sege,,,, SPYL'nkkr 1neads litre odded to 4L c-anfrac+ 4 a 4olctl
Cos -t- 4 ziv 38`7.2.0
Justification:
�e sacc{-1/41 ten needed coverageu)os no{
ofC9i„a-` cn,cliraCA-
CHANGE TO CONTRACT PRICE ,1
Original Contract Price: $ 11 / o.%`'T
Current contract price, as adjusted by previous change orders:
$ 11, 2.84.74
Cvciwctcc1 iv,
The Contract Price due to this Change Order will be [increased] [dam] by $ 3 gJ ' OZi0
The new Contract Price due to this Change Order will be:
CHANGE TO CONTRACT TIME
$ I If ,7 / . 9+ -
kVA
The Contract Time will be [increased] [deased] by calendar days.
The date for completion of all work under the contract will be
Approvals Required:
To be effective, this order must be approved by the Owner if it changes the scope or objective of the project, or as may otherwise
be required under the terms of the Supplementary General Conditions of the Contract.
Requested by (Lira c%O/
Recommended by
Approved by Contractor:.
Approved by Mayor:
Wiley -Fisk Form 15-3
date
date /a-ia-Q4
date, 2..-73-
date /- AL(