Loading...
HomeMy WebLinkAbout107-90 RESOLUTIONRESOLUTION NO. 107-90 k RESOLUTION AUTHORIZING A CONTRACT WITH J.D. SWEETSER, INC. FOR GROUP "C" WATER LINE REPLACEMENTS. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF F AYETTEV I T.LE , ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute a contract between the City and J.D. Sweetser, Inc. in the amount $192.582.00 for Group "C" water line replacements. A copy of the contract authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this ATTEST: /� `FL 114 rk 3rd day of July APPROVED: , 1990. B _y : Mayor FAYETTES1LLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Fayetteville City Board of Directors Thru: Scott Linebaugh, City Manager,J/' From: Bob Kelly, Public Works Director Re: Group "C" Water Line Replacements/ Award of Construction Contract Date: June 4, 1990 The above project is a budgeted project which has been approved by the Board. The vicinity map attached shows the location of these water lines which are located along Hwy 62 West and Old Farmington Rd. These water lines are scheduled for replacement because of maintenance problems. On 5/18/90 bids were received for this project and a copy of the bid tabulation sheet is attached for your information. The low bidder is J. D. Sweetser, Inc. for the base bid, PVC pipe, in the amount of $196,227.00. It is the recommendation of the Engineer that approximately 180 feet of the 12" water line replacement be deleted from this contract, because further information provided by the maintenance division has assured the integrity of the existing pipe. This portion is marked on the vicinity map. The amount of the scaled down contract will be $192,582.00. The PVC pipe is chosen for this project because the soil is very corrosive. The Staff recommends that the contract be awarded to the low bidder J. D. Sweetser, Inc. in the amount of $192,582.00. BHK/sn cc: John Merrell Don Bunn 1 1 1 1 1 1 1 1 1 1 AGREEMENT THIS AGREEMENT, made this day of , 19 , by and between City of Fayetteville , hereinafter called "OWNER" and (name of Owner), (an Individual) Jerry D. Sweetser, Inc. doing business as (an individual,) or (a partnership,) or (a corporation) hereinafter called "CONTRACTOR". WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned: 1. The CONTRACTOR will commence and complete the construction of Group "C" Water Line Renlacements(Hwy. 62 W, and Old Farmington Road). 2. The CONTRACTOR will furnish all of the materials, supplies, tools, equipment, labor, and other services necessary for the construction and completion of the PROJECT described herein. 3. The CONTRACTOR will commence the work required by the CONTRACT DOCUMENTS within 20 calendar days after the date of the NOTICE TO PROCEED and will complete the same within 120 calendar days unless the period for completion is extended otherwise by the CONTRACT DOCUMENTS. 4. The CONTRACTOR agrees to perform all of the WORK described in the CONTRACT DOCUMENTS and comply with the terms therein for the sum of $ 192,582.00 or as shown in the BID schedule. amount to be 5. The term "CONTRACT DOCUMENTS" means and includes the following: (A) Advertisement for BIDS (B) Instructions to (C) Bid Bond 11 (D) Bid (E) Agreement Bidders (F) Payment Bond (G) Performance Bond F-1 (H) Notice of Award • (H) Notice of Award (I) Notice to Proceed (J) Change Order (K) General Conditions (L) Special Conditions (M) Special Instructions (N) SPECIFICATIONS prepared by CEI Engineering Associates dated December 1989. (0) ATTACHMENTS: City of Fayetteville Detailed Specification Parts II & III. (P) Addenda: No. ,dated ,19 ,19 .....e., 19 • • • (Q) Drawings prepared by CEI Engineering Associates including cover sheet and sheets numbered 1 through 9, and dated December 1989. 6. The OWNER will pay to the CONTRACTOR in the manner and at such times as set forth in the General Conditions such amounts as required by the CONTRACT DOCUMENTS. 7. This agreement shall be binding upon ,all parties hereto and their respective heirs, executors, administrators, successors, and assigns. IN WITNESS executed by copies each written. 1 1 1 (SEAL) 1 ATTESTS 1 i 1 1 WHEREOF, the parties hereto have executed or caused to be their authorized officials, this Agreement in 5 (number of copies) of which shall be deemed an original on the date first above ,41 rX2 j141D,a4„') NAME (Please type) TITLE • (SEAL) ATTEST: . i ��i6E6(/) vLApeEt 1 NAME ELIZABETH A. NAPIER (Please type) T I TLE ACCOUNTANT • OWNER: /24 iCityFayettev%lle BY NAME William V. artin TITLE (Plea -e type) Mayor CONTRACTOR: Jerry D. we-tser, Inc. NAME WILLIAM G. SWEETSER _ VP ADDRESS (Please type) 590 W. Poplar Fayetteville, Arkansas 72703 LINE Hwy. 62 Old Farmington Road TOTALS GROUP "C" WATER LINE REPLACEMENTS BUDGETED BID LENGTH(FT) AMOUNT AMOUNT 4544 $127,300 $192,582* 2360 84,600 $211,900 $192,582 * Both projects bid together. 11 �. • 11 i �.� • C • 1 C w . • l • • . • VICINITY MAP h--36_. sY I iv/ PAVE 1E tat -„,,,r , p H pth 4. w z H 0 04 g t\ cP P ! 11 n, ts QUANTITY w N ' t C 111 "'.• ›. LI\ /2 " Alf 6,iTE VQ LVF lQ" Mj GATE V4t.vt k N lls, 2' 501 10 PVC ar ''',.\ , �` x fr. ‘' p lki) Q k k) N ISA •N '�h% & C N ,..I‘ - DESCRIPTION C m ►,, 3 3 I , .� :'1 0 0 0 -1 �J p 'n O O O 8 o O 31 (� •� O r CONTRACTOR nb.yETTE Tt-EE k -Rani kid o 0 0 NJ O 3 LI\ 0 Q Jl i”nJ 0 3 O p C.) 0, t O 0 0 , u- Q 0_L- 3 0 �i .r 3 L� O si ;. o 3 _ 0 f . , 0-4 n et CONTRACTOR _ BID k d M a ,J �0 j W �w O �? J , d ..v ,'‘ Ld tjN •• " • Q v "1 o c c c 0 pU 1 !HITT PRTf F U 91 L CONTRACTOR 7 '7 nr) ', ;5tr. )o -, j O «0 Q_ 0' `� 't 00 j 0 . t• nc • •i3 is S) Q. , S W �% c; O t3 3 N kJ .-c p\ s y to 0 J 0 Q N J N - 'i o< y Z �' a, J - .) . C J°o N 0 N O • a Q 3 C •-)1 •p o 0 W N o n 1. I1NTT PRTrF y Z I CONTRACTOR l b O -3 1 0 I., �J '0 , 3 • ♦ t O 0 0 '� �" o v 3 v 1 ,- 4 3) D LL N. GN CD '1 N v `'1 `� l b tj ONIN3dO aIH 0 c4 M n H b O 2 z 0 NOLLVIOHY.L GIH • • r- s • • �a.r.....-.. uv. i r.iitr r.aI rr/LIru rte6 A&2724&(r A6,Eme,ci !39x od tie oo fiooa^l 42-oo .o o isod, o(mi � ��,,,, 'zeta/Ire Fe g/Dzi^rr' 840 co noa.o 2 _ gQf.nrl 2,70o,00 400, 00 no. c) /cteTrhite.ApRen91ie ?2.00 air/6.00 /ti.SO �fQ�-,_ nn Lin nen 2-77 n • t • I Vim. • J\ N IN 0 3 PQUE 5 PROJECT NO. BID OPENING 6//I $/yQ MBID TABULATION B=OO R. PROJECT GR_oUp G-&► \J41eg.L,,kiec ice- nAceMa AJTS O `•D co \I S U1 -{a W ^c t > P g R Z 91°.i> O . • N fS QUANTITY 1 ," MJ GATS' V4LV8 11 Z' 50/ -1O fVC D4451745 xi i 1\11 IN % kA ^\ lA N # to 'N DESCRIPTION 1/4.1\ N ', 0 •• J -- J' v j o ,,, ' O �3 o a) 0, : 0 0 u N i 0 0 41 ,.N O Q 0 o 4 0 0 . iv 43 O p C 0 � 0 N , w o C o Q 2 C 'b -+ P° n (� CONTRACTOR Ger 0 .' ' J O0 3 s O b 1 ui l: ir p b` =t ct Q p g Q 0 0 0 Ji o s o i. ' N ° e W IN 0 p 61 N. 0 o --0 \ • 8 ts . 0 d` N 0 Q M J J O 0 4 CI 0 8 ;,° p 0 J 0 O. I.' Q 0 0 3 3 0 , Q ._ o OC N �' 1 D N "1 v N -r74 i pi v. Nr.ktk i y 1 CONTRACTOR �u It u :: .;, 0 •nom, :_i _; �J % O p� 0 o O O 0 0 O 0 h Vv O =1 .,,,, Li p $ d 0 j Q s Chi S' o , -C 8 - � - W 11 Jr)O` t -Na 4, `i 6' - t ,T� °� la v i c N �� b o cs• k D c =' Ni Q 5 3) N 0ra 0 Cs �� 0 0 0 o p 0 • o 0 tj o o $ la 0 p o a o o v ) G 0 C U b pi C tb �`i CONTRACTOR J 0 .i j 0 u p J 0 V 0 - 1 ' P O 3 0 Q • 0 . C j '1 0 O. o 6\ ui 0 p II N o .- w� o p) p O o` o g L) W Q` L. ,O o {D 0 0 O 0 Iv r Q 0 3 r ^D J OC z ' • a �11.1TT DflTroc I CONTRACTOR 1 '1 R 9NIN3d0 GIG 1031'021d Q3 M n z 0 NOI,LV ]fgy.L GIH 0 ►J • cIsN 1,4w TQUANTITY . L✓LX U U r VC4V "7";Itis d 4c 3 t i (13 eik DESCRIPTION Fid / .e4&rr BC 0 - O p 0 tl v N o n • 4 1 CONTRACTOR a- w tto N (4 o • t.' 0 0 g 3 O I IN o o �- . •44s.._4o. O o Q O a L.Z O -t, y O .L` 0 u 1 co A u U CONTRACTOR . �s hi (0.o , tr4 \ig:t„. op •I' N ~ s a)0"got o J O o 6o . -i*- O U O 3 n �1 G \ CONTRACTOR NY yo , - ► u . . _- -1 J 3 J i . • z .� 1 b V -4 1 M• . 4. 7FNDED 9NIN3d0 GIG 1031'021d Q3 M n z 0 NOI,LV ]fgy.L GIH