Loading...
HomeMy WebLinkAbout104-90 RESOLUTIONRESOLUTION NO. 104-9n A RESOLUTION' APPROVING 7THE AMENDMENTS FOR ENGINEERING CONTRACTS WITH ETC ENGINEERS, INC. AND APPROVAL OF A BUDGET ADJUSTMENT. ' 1 _ BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: y; t i i Section 1:'4 That the Mayor 'and City Clerk are hereby authorized and directed to execute the amendments to engineering contracts with ETC Engineers, Inc. for the lift station telemetry project and the manhole rehab/sewer flow monitoring/water works telemetry project in the amount of $34,048.00. A copy of the contract amendments authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. Section 2. The Board of Directors hereby approve a budget adjustment in the amount of $11,639.00. A copy of the budget adjustment for approval is hereby attached hereto marked Exhibit "B" and made a part hereof. PASSED AND APPROVED this 3rd " \V C `• ATTEST: ; City .C1 rk ^ 47-7 i 1 X`. day of July APPROVED: B y : li�.d Mayor , 1990. FRAM ETC ENGS-POLYSTRCTRS 6. 5.1990 t6:10 P. 2 AMENDMENT NO. 1 AGREEMENT FOR ENGINEERING SERVICES FOR LIET:STAT ION ,TELEMETRY ' CITY OF FAYETTEVILLE, ARKANSAS This Amendment No. 1 to the original contract dated August 4, 1990, between the city of Fayetteville, Arkansas and ETC Engineers, Inc , Little Rock, Arkansas, is for the purpose of expanding the scope of work of the original contract and compensating the Engineer for the additional services. The following sections of the original contract document is hereby amended as follows: SECTION 2.2 RESIDENT SERVICES DURING CONSTRUCTION. The Engineer is hereby requested to provide the resident inspection services described in section 2.2. Such services are deemed necessary to make certain that the project is constructed as per specifications and the city receives a completed project that meets the performance specification per contract documents. The resident services will be limited to the duties and responsibilities and authority as described below: 1. Schedule: Review the progress schedule, schedule of Shop drawing submission, schedule of valves and other schedules prepared by CONTRACTOR, and consult with the OWNER concerning their acceptability. 2. Conferences: Attend preconstruction conferences. Arrange a scheduleof progress meetings and other job conferences as required in consultation with the OWNER. 3. Liaison: a. Serve as OWNERS liaison with CONTRACTOR, working principally through CONTRACTOR's superintendent and assist him in understanding the intent of the Contract Documents. b. Obtain from OWNER additional details or information when required at the job site for proper execution of the Work. 4. Shop Drawings and Supplies: a. Receive and record date of receipt of Shop Drawings and samples and obtain approval. b. Receive samples which are furnished at the site by CONTRACTOR for ENGINEER's approval, and notify OWNER of their availability for examination. Advise CONTRACTOR or his superintendent immediately of the FROM ETC ENGS-PGLYSTRCTRS 6. 5.1990 16:11 P. 3 commencement of any Work requiring a Shop Drawing or sample submission if the submission has not been approved by A the ENGINEER, 5. Review of Work, Rejection of Defective Work, Inspection and Tests. a. Conduct on-site observations of the Work in progress to determine that the Project is proceeding in accordance with the Contract Documents and that completed Work will conform to the Contract Documents. b. Report to OWNER whenever he believes that any Work is unsat- isfactory, fault or defective or does not conform to the Contract Documents, or has been damaged, or does not meet the requirements of any inspections, tests or approvals required to be mdde, and advise OWNER when he believes Work should be corrected or rejected or should be uncovered for observation, or requires special testing or inspection. c. Verify that tests, equipment and systems startups and operating and maintenance instructions are conducted as required by the Contract Documents and in presence of the required personnel, and that CONTRACTOR maintains adequate records thereof; observe, record and report to ENGINEER appropriate details relative to the test procedures and startups. d. Accompany OWNER and visiting inspectors representing public or other agencies having jurisdiction over the Project, record the outcome of these inspections. 6. Records a. Daily inspection reports. 1. Date, project number, contractor, inspection time. 2. Weather conditions. 3. Work performed by contractor. 4. Deficiencies and corrective measures. 5. Significant delays and causes. 6. Material and equipment deliveries to the site. 7. Disputes. 8. Instructions received or given. 9. Description of accidents. 10. Details of extra work done by contractor outside the scope of the contract. 11. Visitors. FROM ETC ENGS-POLYSTRCTRS 6. 5.1990 16 11 P. 4 12. Record of men and equipment. 13. Tests. Shop submittals and shop log ( submittals by contractor of detailed data for equipment and/or material to be used in the project. c. Change order files. d. Records of construction deficiencies and resolutions e. Log of deviations (list of all deviations from design specifications and plans granted LO the contractor). f. Test results files with clear indications of need for retesting. SECTION 5: PAYMENT TO ENGINEERS This is a cost reimbursement type contract. The original budget is increased due to the expansion of scope as described above. The budget is increased as follows: 1. Lift Station Telemetry $12,938.24 Total Budget Increase: $12,938.24 Total Maximum Revised Not to exceed fee: $76,656,24 All other stipulations of the original contract remain unchanged. This Amendment Number 1 agreed to June 5, 1990. Attest: ityACler Attest: Lem Tull, Sec./treasurer CITY OF FAYETTEVILLE, AR SAS li !Sent/ William V. Mart MizatrdZ;jiiman, l'resi FROM ETC ENGS-POLYSTRCTRS 6. 5.1990 16:12 P. 5 AMENDMENT NO. 1 AGREEMENT FOR ENGINEERING SERVICES FOR 1. MANHOLE REHAB SYSTEM417 2. SEWER FLOW MONITORING CITY OF FAYETTEVILLE, ARKANSAS 3. WATERWORKS TELEMETRY This Amendment Nu. 1 to the original contract dated April 11, 1989, between the city of Fayetteville, Arkansas and ETC Engineers, Inc., Little Rock, Arkansas, is for the purpose of expanding the scope of work of the original contract and compensating the Engineer for the additional services. The following sections of the original contract document is hereby amended as follows: SECTION 2.2 RESIDENT SERVICES DURING CONSTRUCTION. The Engineer is hereby requested to provide the resident inspection services described in section 2.2. Such services are deemed necessary to make certain that the project is constructed as per specifications and the city receives a completed project that meets the performance specification per contract documents. The resident services will be limited to the duties and responsibilities and authority as described below: 1. Schedule: Review the progress schedule, schedule of Shop drawing submission, schedule of valves and other schedules prepared by CONTRACTOR, and consult with the OWNER concerning their acceptability. Conferences: Attend preconstruction conferences. Arrange a scheduleof progress meetings and other job conferences us required in consultation with the OWNER. 3. Liaison: a. Serve as OWNERS liaison with CONTRACTOR, working principally through CONTRACTOR'S superintendent and assist him in understanding the intent of the Contract Documents. b. Obtain from OWNER additional details or information, when required at the job site fur proper execution of the Work. 4. Shop Drawings and Supplies: a. Receive and re ord date of receipt of Shop Drawings and samples and obtain approval. Receive samples which are furnished at the site by CONTRACTOR for ENGINEER's approval, and notify OWNER of their availability for examination. c. Advise CONTRACTOR or his superintendent immediately of the FROM ETC ERGS-POLYSTRCTRS 6. 5.1990 16:12 P. 6 commencement of any Work requiring a Shop Drawing or sample submission if the submission has not been appiovcd by ; the ENGINEER. 5. Review of Work, Rejection of Defective Work, Inspection and Tests. a. Conduct on-site observations of the Work in progress to determine that the Project is proceeding in accordance with the Contract Documents and that completed Work will conform to the Contract Documents. b. Report to OWNER whenever he believes that any Work is unsat- isfactory, fault or defective or does not conform to the Contract Documents, or has been damaged, or does not meet the requirements of any inspections, tests or approvals required to be made; and advise OWNER when he believes Work should be corrected or rejected or should be uncovered for observation, or requires special testing or inspection. c. Verify that tests, equipment and systems startups and operating and maintenance instructions are conducted as required by the Contract Documents and in presence of the required personnel, and that CONTRACTOR maintains adequate records thereof; observe, record and report to ENGINEER appropriate details relative to the test procedures and startups. d. Accompany OWNER and visiting inspectors representing public or other agencies having jurisdiction over the Project, record the outcome of these inspections. 6. Records a. Daily inspection reports. 1. Date, project number, contractor, inspection time. 2. Weather conditions. 3. Work performed by contractor. 4. Deficiencies and corrective measures. 5. Significant delays and causes. 6. Material and equipment deliveries to the site. 7. Disputes. 8. Instruction; received or given. 9. Description of accidents. 10. Details of extra work done by contractor outside the scope of the contract. 11. Visitors. FROM ETC ENGS-POLYSTRCTRS 6. 5.1990 16:13 P. 7 12. Record of men and equipment. 13. Tests. b. Shop submittals and shop log ( submittals by contractor of detailed data for equipment and/or material to be used in the project. Change order files. Records of construction deficiencies and resolutions e. Log of deviations (list of dll deviations from design specifications and plans grunted to the contractor). f. Test results files with clear indications of need for retesting. SECTION 5; PAYMENT TO ENGINEERS This is a cost reimbursement type contract. The original budget is increased due to the expansion of scope as described above. The budget is increased as follows: 1. Manhole Rehab System 17 $6,128.64 2. Sewer Flow Monitoring $12,596.79 3. Waterworks Telemetry $2,383.36 Total Budget Increase: Total Maximum Revised Not to exceed fee: $21,108.76 $123,376.76 All other stipulations of the original contract remain unchanged. This Amendment Number 1 agreed to June 5, 1990. Attest: .Ily Caer Attest: Lem Tull, Sec./Treasurer CITY OF FAYEEVILLE, A}KANSAS ‘Zard/`/�//� 'Wi'l'liam V. Marti ;NGINEERS, - Consulting Engineers and Scientists 1510 SOUTH BROADWAY, LITTLE ROCK, ARKANSAS 72202, 501-375-1786 March -27 1990 Mr. -Sid Norbash Engineering and Maintenance City of Fayetteville - - 113 West Mountain Drive Fayetteville, Arkansas 72701 DeateSid:- As per Our telephone discussion, I have prepared thissynopsisin support of my _ request for additional funds for theprojectsthat we are currently contracted: to perform Attachment 1 shows the current status of our contract. As you can -see, after we submit a bill for the current period the total_funds :left inthe contract will be in the amount of $14,757.00 The obvious:questronthat you will ask is why do we have only this amount left while we still have to perform the construction -inspection = -=services =Let me try to explain the reasonsior theeoverruns _. 1. The_project required a;lot niore field work than we perceived. As you - knew outfield crew spentalot of time in the field to:documentexact field conditions Our philosophy -has always been to give as much detail as possible --- to the contractor. Usually this has a direct correlations with the contractor's perceived risk. And of Course -this.directly°impacts-the contractor to his bid. _,In this_case our expandedeffort in field data collection paid off in the way of reduced bids that we received -in all`of the`the projects. . 2. We decided during the project concept stage to go though the two step bidding process rather than the traditional - one-stepbiddmg process. Again our intent was to save the city some money by bringing more competition: Of course this took more engineering; effort and caused us to spend more project- - _ - -_- --- -budget byway of printing etc. However, this was also:instrumental �n reducing -construction cost. -- 3.CWe-originally were going to use the city's existing Motorola trunk lines for dbwnloadingdata from remote monitoring points: During actual design we decided that this would cause problems for the city, especially during emergencies. Therefore the project team decided; � q ENVIRONMENTAL 71 INDUSTRIAL J 1 MUNICIPAL P./.1 WATER RESOURCES -' - STRUCTURAL j�- NON CUSTOMARY MATERIALS UTILITY _4 ..,1 SOLID. WASTE 71 RESOURCE RECOVERY ri HAZARDOUS WASTE - � 71 RESEARCH & DEVELOPMENT f FLUID MECHANICS I AERODYNAMICS t _ e after getting concurrence from the city, to install an independent telecommunication system based on radio telemetry. This required us to perform radio path survey and obtain an FCC license. As you know this is a monstrous task. But, without the radio path survey we would have probably not gotten the bids like we did. A copy of the radio path survey is included for your file This was also given to all of the contractors. We are in the process of filling up the FCC license forms and will bring it to the city as soon as we complete the forms. I hope the above reasons are enough ground for this request for additional funds. I have tried to develop a projected cost for the construction period. We are assuming that all three contracts will proceed simultaneously. This may not happen. We will also try to contain all costs in any ways that we can. Based on two full time construction inspectors for three months construction period, our estimated budget is $48,805 (see attachment 2). Therefore the amount of additional funds needed is $34,048.00. Please review these materials and call me if you have any questions We have had a wonderful time working for you and the rest of the folks at the City of Fayetteville. I hope you have enjoyed working with us as well. I am planning to come and visit Bob and you in the next couple of weeks to determine our course of action on Huntington subdivision Thanks again. Sincerely, V\1\4 Mi cc• Mr. Bob Kelly Enclosures 'RH/lb rR ATTACHMENT 1 CURRENT STATUS OF THE CONTRACTS: TITLE OF CONTRACT I TOTAL I AMOUNT I AMOUNT I BALANCE 1 :CONTRACT I BILLED I EARNED I IN : : AMOUNT 1 TO DATE :NOT BILLED: CONTRACT RFP 89-1 JOB NO. 892204 LIFT STATIONS TELEMETRY PUMP STATIONS MONITORING SYSTEM. $63,718 1 $48,720 $8,602 1 $6,396 RFP 89-1 JOB NO. 892203 WATERWORKS TELEMETRY REMOTE MONITORING OF - PUMP STATIONS AND TANKS $11,639 : $9,423 $1,141 1 51,075 RFP 89-1 JOB NO. 892202 MANHOLE REHABILITATION MINI SYSTEM 17 $29,975 : $24,216 $2,902 1 $2,857 RFP 89-1 JOB NO. 892201 FLOW MONITORING AT MANHOLES THROUGH REMOTE TELEMETRY $60,652 : $51,122 $5,101 1 $4,429 TOTAL TO DATE I $165,984 I $133,481 $17,746 I $14,757 ATTACHMENT 2 ESTIMATE OF ADDITIONAL FUNDS NECCESSARY TO COMPLETE THE RESIDENT INSPECTION PHASE OF THE PROJECTS: ASSUMPTION: RESIDENT INSPECTION TIME = 13 WEEKS THIS ASSUMTION IS BASED ON THE TIME ALLOWED FOR CONSTRUCTION COMPLETION IN EACH OF THE THREE CONTRACTS AND ANTICIPATED STARTUP OF ALL THREE CONTRACTS SIMULTANEOUSLY TOTAL MANHOUR FOR EACH RESIDENT INSPECTER = 520.00 HRS. NO OF INSPECTERS NEEDED = 2 - ONE FOR MAN HOLE REHAV. AND ONE FOR THE OTHER CONTRACTS. CATAGORY HRS. RATE AMOUNT PROJECT MANAGER 80 $21.63 ENGINEER 520 $15.38 INSPECTOR 520 $12.00 CLERICAL 40 $6.05 SUBTOTAL - LABOR GENERAL AND ADMINISTRATIVE OVERHEAD @ 130.00% MISCELLANIOUS EXPENSES: PER DIEM FOR 130 DAYS @ MILAGE ONE TRIP PER WEEK $1,730 $7,998 $6,240 $242 $16,210 $21,073 $45.00 $5,850 $1,235 SUBTOTAL - ALL $44,368 PROFIT FOR FEE 10.00% $4,437 TOTAL ESTIMATED BUDGET FUNDS AVAILABLE IN CURRENT CONTRACT $48,805- $14,757 ADDITIONAL FUNDS NEEDED $34,048 DATE : 28 -Mar -90 CITY OF FAYETTEVILLE, N 03 ACCOUNT INFORMATION REQUIRING BOARD APPROVAL INCREASE DATE REQUESTED O 0'. 1 DEPARTMENT ACCOUNT TITLE Cap.Water Mains Contract Services ACCOUNT NUMBER 540-560-5-315.00 0 41-1 414J 3 co >1 O N 0 U ?� rI G0) •.•I .-1 +1 N 1J bd N W 0 co 4-I N O 1.1 ro N 11 Oa) o, C 3 w a U 0 Z Ww H 0 o Q F O N (1) ta -1 Cm O 7 O 1:4 ILI 44-1 F Z 0 $11,639.00 0 U W ACCOUNT TITLE Contract 31 N Sa ' 0 m U W a) I +1 u 3 IF • CP .I O •d�0.0 3O v 3 n) 0 +�ow , w rl U04 4. N lTro N 0.) CO C 31 O N I O 441 UOQ 0}•i N CU U CL) 4443 dN1 3w. (U n -P 31.0 Oa)ro NN 0 4 31 .O 31 O 0 Lk a o O •ri r1 a) O rl 0 G 0 4-1 (I) 0 rci 0 C.) U 31 m 3 N 3 al 3U.0A >41 140 4J in +1-d nO) CH 0:1 ICC 4a r -1N •r1 a) E•r4 0 3 N v >, N 014:4+� 1n 2i .0 210 3+U.1 E < AS a)< a)ri a)' 4 U (1) +1 1n tr -P E W • ACCOUNT NUMBER NM co i 4-I 04 (Ci r:4 540-560-5-315.00 - N 0 2 ($11,639.00) ro lJ N N 0 -p U . o a)N E•ra U 4 .ro )4 04 W a o U CO 3-1 O W 3w 44 ,H U O N y O.a) W O x u r1 W U ri 10 a)3 5-00 H 11 •� owcc) 0 Z 4.3 O v y A N f ro 1 F3 BUDGET OFFICE USE ONLY yF 0 0 w H 0 Ph 1-4