HomeMy WebLinkAbout39-89 RESOLUTIONRESOLUTION NO. 39-89
i
A RESOLUTION AUTHORIZING THE MAYOR AND CITY
CLERK TO APPROVE A CHANGE ORDER TO THE CITY'S
CONTRACT WITH APAC ARKANSAS, INC. AND AN
AMENDMENT TO THE CITY'S ENGINEERING CONTRACT
WITH CRAFTON AND TULL FOR IMPROVEMENTS TO
WILLOW,AND SPRUCE STREETS UNDER THE COMMUNITY
DEVELOPMENT BLOCK GRANT PROGRAM.-
k 4 e
•
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:, <
M
Section 1. That the Mayor and City Clerk are hereby
authorized and directed to..execute.a change order to the City's
contract with'APAC Arkansas, Inc and an amendment to the City's
contract with Craftori and Tull for impiovements.to Willow and
Spruce Streets under the Community Develpment Block Grant Program.
A copy of the change order and contract amendment authorized for
execution are attached hereto marked Exhibit "A" and Exhibit "B"
and made a part hereof.
PASSED AND APPROVED this 18th day of April
APPROVED
By: %�L�L/ /(/
Mayor
, 1989.
F 4Hi.':liirE "ORT P
PROJECT:
(Name, Address) Street Improvements for Community
Development; City of Fayetteville
Willow and Spruce Streets
TO CONTRACTOR:
(Name; Address) APAC Arkansas, Inc.
McClinton Anchor Division
P.O. Box 1367
Fayetteville, AR. 72702
OWNER 'e
ENGINEER (�
CONTRACTOR CD
OTHER 0
CHANGE ORDER N0::2
DATE:
February 13, 1989
ENGINEER'S PROJECT N0: 88153.00
CONTRACT DATE: January 16, 1989
CONTRACT FOR: Street Improvements
The Contract is changed as follows:
. Add 2. poured in-place concrete manholes with Eing & cover as per
with 6" PVC SDR -35 sewer pipe $2,000.00
. Add 24" manhole ring and cover E repair top slap for the existing drop inlet
located at sta. 100.46 Spruce Street $ 375.00
. Verify utility locations and depth requiring abnormal trenching and labor
and equipment allocation $ 985.00
. Add 24' radius curb at corner of Huntsville & Willow Ave $ 151.20
▪ Replace 77' of 24" RCP with 77' of 16 gauge squashed 24" CMP $ 0.00
. Pour 28 sq. yd. concrete driveway apron @ 16.75 sq.yd. at sta. 10+50
Willow Avenue $ 469.00
Plan detail 1.6
NOT VALID UNTIL SIGNED BY THE OWNER. ENGINEER AND CONTRACTOR
The
Net
The
The
The
The
The
original (Contract Sum) (QaapaakaadxMaxtuMuxRaiamit was
change by previously authorized Change Orders
(Contract Sum) (Baraaamdd:4taaivaaxRr:saek prior to this
Change Order was
(Contract Sum)larawva ee4XIIaxtucamxPrtnekxwill be (increased)
6dao0emeadktoa>odriaoapaz.k by this Change Order in the amount of..
new (Contract Sum)tdiaa axkaadxRaximamxRRiaeii including
this Change Order mill be
Contract Time will be (increased)tdeareasediAmnzkan;e4:l by
date of Substantial Completion as of the date of the Change Ord
therefore is
the Contract Sum, Contract Time or
authorized by Construction'Change
NOTE: Thissummarydoes -not reflect changes in
Guaranteed Maximum Price which have been
Directive.
Grafton, Tull C Associates
ENGINEER
2800 No. 2nd
ADDRESS
Rogers, Arkansas
BY /4 L/
DATE � d'7
$ 102,152.95
$ 2,250.00
$ 104,402.95
3,980.20
$ 108,383.15
(4 ) days.
er
March 23, 1989
APAC-Arkansas/McClinton Anchor City of Fayetteville
CONTRACTOR
P.O. Box 1367
ADDRESS
Fayetteville, AR. 72702
027z4/B9
EXHIBIT A
OWNER'
113 W. Mountain
ADDRESS
Fayetteville, AR. 72701
S a r;
4
ENGINEERING CONTRACT AMENDMENT
WILLOW/SPRUCE ST PROJECT
CRAFTON AND TULL ENGINEERS
The Agreement for Engineering Services between the City and
Crafton and Tull for the Willow/Spruce Street Project and dated
August 15, 1989 is hereby amended to add $ 494.86 to the price
for the Construction Management Phase of the Contract.
The specific work involved is the Egineers time relating to
the field location of Utility Lines as noted on the attached
invoice.
APPROVED this 077 day of
1989.
7-7961-‘44,_ doprc-
City „ / Engineer
RECEIVED MAY 9 1989
RECE"
q 1989