HomeMy WebLinkAbout24-89 RESOLUTIONRESOLUTION NO. 24-89
A RESOLUTION AUTHORIZING THE MAYOR AND CITY
CLERK TO EXECUTE AN AMENDMENT TO THE CITY'S
CONTRACT WITH GARVER & GARVER, P.A. FOR
ENGINEERING SERVICES FOR AIRPORT IMPROVEMENTS.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the Mayor and City Clerk are hereby
authorized and direct to execute an amendment to the City's
contract with Garver & Garver, P.A. for engineering services for
airport -improvements. A copy of the amendment authorized for
execution hereby is attached hereto marked Exhibit "A" and made a
part hereof.
PASSED AND APPROVED this 21st day of ` March , 1989.
APPROVED
By:
610/
Mayor
Contract Amendmentment No. 1
t -
CONTRACT FOR ENGINEERING SERVICES
Lighted Runway and Taxiway Markers
Refurbishment of the Beacon and Beacon Tower
Replacement of Primary Windsock and Two Secondary Windsocks
DRAKE FIELD
FAYETTEVILLE, ARKANSAS
AIP 3-05-0020-10-88
»1CROT-MED
THIS AGREEMENT, made as of the o2-3 day of Q14' , 190,
by and between the City of Fayetteville, hereinafter called the "City," and
Garver+Garver, P.A., Engineers, P.O. Box C-50, Little Rock, Arkansas 72203,
hereinafter called the "Engineer" shall modify and amend the enginering
contract dated September 20, 1988 between the City of Fayettville and the
Engineer for the construction of improvements on Drake Field. The contract
between the City and the Engineer dated September 20, 1988 shall hereinafter
be called the original contract.
The City has the opportunity to fund the construction of distance remaining
signs for Runway 16-34 at Drake Field, and desires the engineer to add the
distance remaining signs to the original scope of work.
SECTION I - GENERAL
Section 1 of the original engineering contract is unchanged by this amend-
ment No. 1.
SECTION II - SCOPE OF SERVICES
Section II of the original contract is unchanged by this contract amendment
No. 1.
SECTION III - ENGINEERING FEES
Section III of the original contract is amended to read as follows by this
contract amendment No.1
1. For the Basic and Special Engineering Services described included in
the original contract, and for the additional services provided for in
this contract
tabulated below:
Work Description
Preparation of Preliminary Report
Preparation of Reports and Plans
Contract Administration
Surveys for Design
amendment
No.
1
Change Order
Add••Distance
the engineering fees shall
No. 1 to the Construction Contract
Measuring Signs to R/W 16-34
Subtotal Lump Sum Cost.
Construction Observation
"Not to Exceed" 'Cost
$ 2,782.42
$ 8,808.06
$ 1,915.00
$ 1,494.17
$ 1 005.00
$16,004.65
$ 8.765.00
$24,769.65
be as
For the construction observation portion of the project, the City
agrees to pay the Engineer reimbursement of all salary costs, overhead,
and fees at the rates tabulated in the Schedule of Salary Rates
attached to this Contract.
As tabulated above, and as estimated in detail in the attached
"Engineering Contract Cost Estimate," the estimated cost of the
construction observation is $8,765.00. The overhead percentages shall
be as shown on the attached "Engineering Contract Cost Estimates." The
"not to exceed cost" tabulated time contains an estimated cost of the
time and materials required for construction inspection of $8,765.00
based on the construction contractor's performance time of 75 calendar
days for the contract. This estimated cost for construction inspection
will not be exceeded if the construction contract performance time does
not exceed 75 calendar days. All miscellaneous expendable supplies
normally required by the Engineer in the performance of these services
will be purchased by the Engineer, who will be reimbursed by the City.
All such expenditures will be substantiated by paid invoices or by
accounting procedures approved by the City.
Proper and adequate accounting records shall be maintained by the
Engineer, and will be readily available for inspection and/or audit by
the City and/or the Federal Aviation Administration.
Payments based on the incurred cost and the fee earned will be made
monthly based upon statements submitted by the Engineer to the City.
These statements will be substantiated by a monthly progress report
prepared by the Engineer, and submitted in -the form and number
required by the City.
2. For the preparation of •Preliminary Plans, -preparation of Final Plans,
Contract Administration', Surveys for Design, and Change Order No. 1
portion of the Project, the City agrees to pay the Engineer the lump
sum fee of $16,004.65. The Engineer will be paid monthly based on
percent of project complete to date. Total payment for each part as
shown above will be due when that part is acceptably complete to the
satisfaction of the City.
3. For additional services described in SECTION II, paragraph 4, the City
and the Engineer agree to negotiate the Engineering Fee in accordance
with the Scope of Services to be performed.
SECTION IV - THE CITY AND ENGINEER FURTHER AGREE
Section IV of the original contract is unchanged by this contract amendment
No. 1.
2
•
ATTEST:
u
•
City of Fayetteville
ATTEST:rr1, nn GARVER+GARVER, P.A., ENGINEERS
President
3
•
Drake Field, Fayettville Arkansas, AIP "10"
GARVER + GARVER ENGINEERS
PROJECT DESCRIPTION: Contract Amendment No. 1 Add distance remainign signs to project
1
DIRECT SALARY COST
MAN
HOURS
COST
Project Manager 0 $0.00
Project Engineer 19 $325.28
Design Engineer 0 $0.00
Electrical Engineer 0 $0.00
Technician 0 $0.00
Draftsman 5 $37.50
Typist 0 $0.00
Surveyor 0 $0.00
Const. Observer 0 $0.00
Const. Engineer 0 80.00
Subtotal - Salaries $362.78
PAYROLL ADDITIVES:(29.41%) $106.69
DIRECT NON -PAYROLL COSTS
Reproduction $6.40
Survey Supplies $0.00
Computer Rental S0.00
Mileage/Travel $0.00
Subtotal- Direct Cost $475.87
INDIRECT COSTS (109.72%) $398.04
. Subtotal $873 92
PROFESSIONAL FEE (profit) $131.09
Total Fee added to original Contract
by Contract Amendment No. 1 $1,005.00
Prepared by Mb eat I�t/ !� UNL �— Date G� MMGarver+Garver