HomeMy WebLinkAbout57-87 RESOLUTION• eke RESOLUTION NO. 4. 57-87 . A RESOLUTION APPROVING CHANGE ORDER NO. 20 IN THE CITY'S WASTEWATER TREATMENT PLANT CON- STRUCTION CONTRACT WITH OLSON CONSTRUCTION• COMPANY. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute Change Order No. 20 in the City's Wastewater Treatment .Plant construction contract with Olson Construction Company. A copy of the change order authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 18th day of August , 1987. ,A .F 1�tr-.., V I l re- !!� at.%•-***sis*i•0.... Cr t 4 12. t . ! +'' ♦ ! of ..c '. ,...H- ,..:. ••ay:. �` °S 37-F'.y Cle APPROVED BY: kY-4/2").A.:1.71.4 J / yor J+ v . r: 57, P7 C • CONTRACT MODIFICATION (Change Order) Contract Modification No.: 20 Owner: Fayetteville Arkansas MICROF!! MED DATE: 6/15/87 -.N. � u 1F Project Name: Wastewater Treatment Plant Improvements Project No.: MG18766.A2, .AS &.A6 Contractor: Olson Construction Company \�-_- The following modifications to the contract are hereby ordered: Change wiring for RAS pump motors (CMIR 78 and CR 421) (Anoxic Basins) Change aerator motor starter wiring (CMIR 77) (Oxic Basins) 325 Add solenoid valve wiring for RAS and DNR pumps (CMIR 79 and CR 422) (Site 882 electrical) Add control wiring for exist W3 water pumps (CMIR 80 and CR 149) (Site electrical) 563 Add circuits for valve position indicators on Aerobic Digester DFS lines (CMIR 81 946 Phase II - $5,379 CR 292) (Site electrical) Add torque switch leads on clarifiers (CMIR 82 and CR 490) (Site electrical) 931 Add control wiring between Aeration Basin MCC and pump field panels (CMIR 83 and CR 563 CR 491) (Site electrical) Add section of 16" pipe and 2-45° bends for W3 field fit up (CMIR 85 and CR 509) 1,169 Total $ 205 Phase I - $ 205 This contract modification constitutes full and mutual accord and satisfaction for all time and all costs related to this change. By acceptance of this contract modification, the contractor hereby agrees that the modification represents an equitable adjustment to the contract, and further, agrees to waive all right to file any further claims or changes arising out of or as a result of this change, or the accumulation of executed Contract Modifications on this Contract. Original Contract Contract Amount: $21,232,000 Contract Duration/Completion Date: Belt Filter Press Administration Bldg 365 days Phase I&II Phase III 1/1/1987 9/1/1987 Previous This Changes** Change $190,839.44 $5,584 *14 Weeks 90 Days Revised Contract $21,428,423.44 *14 Weeks 455 Days 4/1/86 *From receipt of written order. Completion date is 12/5/85. **CM #8, a force account modification estimated to cost $500, was approved. CM #9, a force account modification estimated to cost $300, was approved. CM #10, a force account modification estimated to cost $500, was approved. CM #16, a time extension modification was rejected by Olson Construction Company. CM #17, a force account modification estimated to cost $6,730, was approved. CM #18, a force account modification estimated to cost $2,524, was approved. APPROVED: • FAYETTEVILLE P. 0. Drawer F Fayettevviillee,k� , Arkansas Date: mgDS/008 OLSON CONSTRUCTION CO.. 3300 Rock Island R 72701 Irving, Texas 95 V Date 1 / �o CH2M HILL 2567 Pair a Drive Mont ', Alabama 361116, By: <9yc6 lrs^�+-L4s Date:9/.T/87 $5,584