Loading...
HomeMy WebLinkAbout40-87 RESOLUTIONa. RESOLUTION NO. 4n_n7 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO. 19 IN CONTRACT "A" WITH OLSON CONSTRUCTION COMPANY FOR IMPROVEMENTS TO THE CITY'S WASTEWATER TREATMENT PLANT RESULTING IN A NET PRICE INCREASE OF $4,757.00. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETPEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute Change Order No. 19 to Contract A with Olson Construction Company for improvements to the City's Wastewater Treatment Plant resulting in a net price increase of $4,757.00. A copy of the change order authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 2 day of June starer°; ATTEST k`, C._ ( :..erk • .-. APPROVED By: , 1987. May91-4Attitti CONTRACT MODIFICATION (Change Order), Contract Modification No.: 13-4 Owner: Fayetteville, Arkansas Project Name: Sludge Management System Olson Construction Company Contractor: MKROFILPA?. 6/1/87 Project No.: MG18766.B6 The following modifications to the contract are hereby ordered: Delete the barbed wire fencing and the three double gates shown on Drawing Sheet S-1 at the Sludge Transfer Facility (CMIR #B-23). (The fence and gate at entrance to site is unaffected.) ($2,098) Change the air valves at laterals E-2 and S-1 on Drawing Sheet P 120 and at laterals E-6 and S-4 on Drawing Sheet CD -P-210 to Type I, and change the blowoff at laterals E-6 and S-4 on Drawing Sheet CD -P-80 to Type III per CMIR #8-27. $3,354* Upgrade binges for the acoustical door in the Operations Building per CR #99 and CMIR #B-28. Change the reinforcing in the shotcrete-lined portions of the North and South Interceptor Channels from No. 4 reinforcing bar to No. 6, 6" x 6" welded wire mesh (CMIR #B-30). The reinforcing mesh shall conform to ASTM A 185, and tie wire shall be 16 -gauge, black, soft -annealed wire. $92 ($7,057) *$1,462 apportioned for sludge laterals (grant eligible) and $1,892 apportioned for effluent laterals. This contract modification constitutes full and mutual accord and satisfaction for all time and all costs related to this change. Hy acceptance of this contract modification, the contractor hereby agrees that the modification represents an equitable adjustment to the contract, and further, agrees to waive all right to file any further claims or changes arising out of or as a result of this change, or the accumulation of executed Contract Modifications on this Contract. Contract Amount: Original Previous Contract Changes $3,680,775 ($104,712) Contract Duration/Completion Date: Sod and Grass Stand Remainder of Work APPROVED: FAYETTEVILLE 113 W. Mountain St. Fayetteville, Arkansas By: Date: jd/MGUS/008 This Change ($5,709) 10/29/87 8/11/1987 (393 days) OLSON CONSTRUCTION CO. 3300 Rock Island Roa 72701 Iry g, Texxas 950 By: 2 v® Date: 4/ / /,/e% Date: CH2M HILL Revised Contract $3,570,354 e Drive Alabama 36216 '/7 car