Loading...
HomeMy WebLinkAbout36-87 RESOLUTION• RESOLUTION NO. 36-87 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AMENDMENT TO THE CITY'S ENGINEERING CONTRACT WITH CH2M HILL SOUTHEAST, INC. TO PROVIDE ADDITIONAL RESIDENT INSPECTION AND ENGINEERING SERVICES DURING THE WASTEWATER TREATMENT PLANT CONSTRUCTION PERIOD BETWEEN APRIL 11, 1987 AND SEPTEMBER 30, 1987. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute an amendment to the City's engineering contract with CH2M Hill Southeast, Inc. to provide additional resident inspection and engineering services during the Wastewater Treatment Plant construction period between April 1, 1987 and September 30, 1987. A copy of the amendment authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 19 day of May , 1987. APPROVED L, MayoraO By: d!/ 44, 1 TASK ORDER NUMBER 10 ADDITIONAL RESIDENT OBSERVATION SERVICES Task Order Number 10 amends the Amended Task Order Number 2 executed between CH2M HILL Southeast, Inc. (Engineer), and the City of Fayetteville, Arkansas (Owner), on the 30th day of November, 1984. Article 1 • The scope of work is to provide additional resident observation services and engineering services during construction for the period from April 1, 1987 thru September 30, 1987 in addition to that covered by the Amended Task Order Number 2. Article 2 As consideration for providing the services enumerated in Article 1 above, the Owner shall pay the Engineer on the basis of raw labor plus 163% for overhead plus 15% for prof- it plus all project related direct expenses. Subcontractor costs will be marked up 5%. The total cost is dependent upon the schedule of the Contractor, but is estimated to total $90,000 based on the Contractor's proposed working hours. Article 3 Payment to the Engineer for services provided as described in Article 1 is due to be made within 30 days after date of billing. Article 4 IN WITNESS scribe the WHEREOF, the parties hereto each herewith sub - same in triplicate. ATTEST: irnn/life ATTE, jh/DS2/047 FOR THE CITY OF FAYETTEVILLE, ARKANSAS By: Fb'R CH2M HILL SOUTHEAST, INC. By: ti Dated this " 2 day of Title , Title 1987 • AMOMM a TASK ORDER NUMBER 10, AMENDMENT 2 ADDITIONAL RESIDENT OBSERVATION AND ENGINEERING SERVICES This Amendment No. 2 amends Task Order Number 10 executed between CH2M HILL Southeast, Inc. (Engineer), and the City of Fayetteville, Arkansas (Owner), on the 25th day of April, 1987. Article 1 The scope of work is to provide additional resident observation services and engineering services during construction for the added period from January 8, 1988, through June 30, 1988, resulting from the delay in construction, in addition to those services covered by the Amended Task Order Number 2 and Task Order Number 10 as amended for the Wastewater Treatment project. Article 2 As consideration for providing the services enumerated in Article 1 above, the Owner shall pay the Engineer on the basis of raw labor plus 163% for overhead plus 15% for profit plus all project related direct expenses. Subcontractor costs will be marked up 5%. The additional cost is estimated to be $173,000 based on projection of the extra costs to a revised completion date of June 30, 1988. The total for T. O. Number 10 as amended is thus $355,300. Article 3 Payment to the Engineer for services provided as described in Article 1 is due to be made within 30 days after date of billing. mgDS/021 • Article 4 IN WITNESS scribe the ATTEST: WHEREOF, the parties hereto each herewith sub - same in triplicate. FOR THE CITY OF FAYETTEVILLE, ARKANSAS J isl By, e __Namee.` ( Title FOR CH2M HILL SOUTHEAST, INC. l/ / 6. j� U. U 2a-c�'.`-�J ame Title By: Dated this 23 day of,lp 2.h%aL,i , 1987 mgDS/021 MVCtOFILMED TASK ORDER NUMBER 10, AMENDMENT 3 ADDITIONAL RESIDENT OBSERVATION AND ENGINEERING SERVICES This Amendment No. 3 amends Task Order Number 10 executed between CH2M HILL Southeast, Inc. (Engineer), and the City of Fayetteville, Arkansas (Owner), on the 25th day of April, 1987. Article 1 The scopecf_work=i-sto-provide'additionalrresident' -obser_vtiohsery ees:-and-engineering-servicesmiduring--- construction for the added period from June 30, 1988, through September 24, 1988, resulting from the delay in construction, in addition to those services covered by the Amended Task Order Number 2 and Task Order Number 10 as previously amended for the Wastewater Treatment project. Article 2 As consideration for providing the services enumerated in Article 1 above, the Owner shall pay the Engineer on the basis of raw labor plus 163% for overhead plus 15% for profit plus all project related direct expenses. Subcontractor costs will be marked up 5%. The total additional cost isOoo.D,B' The total for Task Order Number -10 as amended s 00.: ^thus 5499,3GT ! Article 3 ? (i .t.tn Payment to the Engineer for services provided as described in Article 1 is due. to be made within 30 days after date of billing.. mgmDS7/061 -1- IN ad"' c. Article 4 IN WITNESS scribe the WHEREOF, the parties hereto each herewith sub - same in triplicate. ATTEST: G/����� j�1//lMPi •..._._.ma.a • ._. .10•••.._. - FOR THE CITY OF FAYETTEVILLE, ARKANSAS By :Q.� N TitlW -'FOR=CH2M--HILL-SOUTHEAST;"INC` Title 7-4 Dated this 6 day of ,,,la. 1987 By: •la mgmDS7/061 -2- • TASK ORDER NO. 12, AMENDMENT 1 ADDITIONAL RESIDENT OBSERVATION AND ENGINEERING SERVICES This Amendment No. 1 amends the Task Order No. 12 executed between CH2M HILL, Southeast, Inc., ENGINEER, and the City of Fayetteville, Arkansas, OWNER, on the 5th day of August, 1987. ARTICLE 1. SCOPE OF WORK The scope of work is to provide additional resident observation services and engineering services during construction, required because of the Contractor default and Surety takeover, for the added period from October 13, 1987, to September 30, 1988. Such services are in addition to those covered by the amended Task Order No. 2 for the sludge management project and Task Order No. 12. ARTICLE 2 As consideration for providing the services enumerated in Article 1 above, the OWNER shall pay the ENGINEER on the basis of raw labor plus 1638 for overhead plus 15% for profit plus all project -related direct expenses. Subcontractor costs will be marked up 5%. The additional cost is dependent on the schedule of the CONTRACTOR but is estimated to total $45,000, based on assumed manpower requirements. The total for Task Order Number 12 as amended is thus $96,000. ARTICLE 3 Payment to the ENGINEER for services provided as described in Article 1 is due to be paid within 30 days after the day of billing. mgDS4/024 -1- ARTICLE 4 IN WITNESS WHEREOF subscribe the same ATTEST: , the parties hereto each herewith in triplicate. ATTE T: mgDS4/024 • THE CITY OF FAYETTEVILLE, ARKANSAS By:,• NamC� Dated this fi 'day of CH2M HILL SOUTHEAST, INC. By: Dated this -2- 1988 A d e day of Ane -e -X- , 1988 MICROFILMED FAYETTEVILLE, ARKANSAS F. 0. DRAWER F CH2M-Hill 2567 Fairlane Drive P.O. Box 230548 Montgomery, Alabama 36123-0548 Attention: Mr. Dennis Sandretto 72701 [501] 521.7f00 April 13, 1988 FCH - 154 Subject: City of Fayetteville Wastewater Treatment Plant Improvements Engineering Services Contract Task Order No. 12 Amendment No. 1 Dear Dennis: Attached please find one (1) original signed copy of the above referenced task order amendment for your files. Very truly yours, Bob Franzmei_r Project Coordinator Attachment f ch4/03b cc: Jim Pennington File 3050-12