RESOLUTION NO. 36-87
A RESOLUTION AUTHORIZING THE MAYOR AND CITY
CLERK TO EXECUTE AN AMENDMENT TO THE CITY'S
ENGINEERING CONTRACT WITH CH2M HILL SOUTHEAST,
INC. TO PROVIDE ADDITIONAL RESIDENT INSPECTION
AND ENGINEERING SERVICES DURING THE WASTEWATER
TREATMENT PLANT CONSTRUCTION PERIOD BETWEEN
APRIL 11, 1987 AND SEPTEMBER 30, 1987.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
That the Mayor and City Clerk are hereby authorized and
directed to execute an amendment to the City's engineering
contract with CH2M Hill Southeast, Inc. to provide additional
resident inspection and engineering services during the Wastewater
Treatment Plant construction period between April 1, 1987 and
September 30, 1987. A copy of the amendment authorized for
execution hereby is attached hereto marked Exhibit "A" and made a
part hereof.
PASSED AND APPROVED this 19 day of May , 1987.
APPROVED L,
MayoraO
By: d!/
44,
1
TASK ORDER NUMBER 10
ADDITIONAL RESIDENT OBSERVATION SERVICES
Task Order Number 10 amends the Amended Task Order Number 2
executed between CH2M HILL Southeast, Inc. (Engineer), and
the City of Fayetteville, Arkansas (Owner), on the 30th day
of November, 1984.
Article 1
•
The scope of work is to provide additional resident
observation services and engineering services during
construction for the period from April 1, 1987 thru
September 30, 1987 in addition to that covered by the
Amended Task Order Number 2.
Article 2
As consideration for providing the services enumerated in
Article 1 above, the Owner shall pay the Engineer on the
basis of raw labor plus 163% for overhead plus 15% for prof-
it plus all project related direct expenses. Subcontractor
costs will be marked up 5%. The total cost is dependent
upon the schedule of the Contractor, but is estimated to
total $90,000 based on the Contractor's proposed working
hours.
Article 3
Payment to the Engineer for services provided as described
in Article 1 is due to be made within 30 days after date of
billing.
Article 4
IN WITNESS
scribe the
WHEREOF, the parties hereto each herewith sub -
same in triplicate.
ATTEST:
irnn/life
ATTE,
jh/DS2/047
FOR THE CITY OF FAYETTEVILLE, ARKANSAS
By:
Fb'R CH2M HILL SOUTHEAST, INC.
By:
ti
Dated this " 2 day of
Title
,
Title
1987
•
AMOMM a
TASK ORDER NUMBER 10, AMENDMENT 2
ADDITIONAL RESIDENT OBSERVATION AND ENGINEERING SERVICES
This Amendment No. 2 amends Task Order Number 10 executed
between CH2M HILL Southeast, Inc. (Engineer), and the City
of Fayetteville, Arkansas (Owner), on the 25th day of April,
1987.
Article 1
The scope of work is to provide additional resident
observation services and engineering services during
construction for the added period from January 8, 1988,
through June 30, 1988, resulting from the delay in
construction, in addition to those services covered by the
Amended Task Order Number 2 and Task Order Number 10 as
amended for the Wastewater Treatment project.
Article 2
As consideration for providing the services enumerated in
Article 1 above, the Owner shall pay the Engineer on the
basis of raw labor plus 163% for overhead plus 15% for
profit plus all project related direct expenses.
Subcontractor costs will be marked up 5%. The additional
cost is estimated to be $173,000 based on projection of the
extra costs to a revised completion date of June 30, 1988.
The total for T. O. Number 10 as amended is thus $355,300.
Article 3
Payment to the Engineer for services provided as described
in Article 1 is due to be made within 30 days after date of
billing.
mgDS/021
•
Article 4
IN WITNESS
scribe the
ATTEST:
WHEREOF, the parties hereto each herewith sub -
same in triplicate.
FOR THE CITY OF FAYETTEVILLE, ARKANSAS
J isl
By, e
__Namee.` ( Title
FOR CH2M HILL SOUTHEAST, INC. l/ /
6. j� U. U 2a-c�'.`-�J
ame Title
By:
Dated this 23 day of,lp 2.h%aL,i , 1987
mgDS/021
MVCtOFILMED
TASK ORDER NUMBER 10, AMENDMENT 3
ADDITIONAL RESIDENT OBSERVATION AND ENGINEERING SERVICES
This Amendment No. 3 amends Task Order Number 10 executed
between CH2M HILL Southeast, Inc. (Engineer), and the City
of Fayetteville, Arkansas (Owner), on the 25th day of April,
1987.
Article 1
The scopecf_work=i-sto-provide'additionalrresident'
-obser_vtiohsery ees:-and-engineering-servicesmiduring---
construction for the added period from June 30, 1988,
through September 24, 1988, resulting from the delay in
construction, in addition to those services covered by the
Amended Task Order Number 2 and Task Order Number 10 as
previously amended for the Wastewater Treatment project.
Article 2
As consideration for providing the services enumerated in
Article 1 above, the Owner shall pay the Engineer on the
basis of raw labor plus 163% for overhead plus 15% for
profit plus all project related direct expenses.
Subcontractor costs will be marked up 5%. The total
additional cost isOoo.D,B' The total for Task Order
Number -10 as amended s 00.:
^thus 5499,3GT
!
Article 3 ? (i .t.tn
Payment to the Engineer for services provided as described
in Article 1 is due. to be made within 30 days after date of
billing..
mgmDS7/061 -1-
IN
ad"'
c.
Article 4
IN WITNESS
scribe the
WHEREOF, the parties hereto each herewith sub -
same in triplicate.
ATTEST:
G/����� j�1//lMPi
•..._._.ma.a • ._. .10•••.._. -
FOR THE CITY OF FAYETTEVILLE, ARKANSAS
By :Q.�
N
TitlW
-'FOR=CH2M--HILL-SOUTHEAST;"INC`
Title
7-4
Dated this 6 day of ,,,la. 1987
By:
•la
mgmDS7/061
-2-
•
TASK ORDER NO. 12, AMENDMENT 1
ADDITIONAL RESIDENT OBSERVATION
AND
ENGINEERING SERVICES
This Amendment No. 1 amends the Task Order No. 12 executed
between CH2M HILL, Southeast, Inc., ENGINEER, and the City
of Fayetteville, Arkansas, OWNER, on the 5th day of August,
1987.
ARTICLE 1. SCOPE OF WORK
The scope of work is to provide additional resident
observation services and engineering services during
construction, required because of the Contractor default and
Surety takeover, for the added period from October 13, 1987,
to September 30, 1988. Such services are in addition to
those covered by the amended Task Order No. 2 for the sludge
management project and Task Order No. 12.
ARTICLE 2
As consideration for providing the services enumerated in
Article 1 above, the OWNER shall pay the ENGINEER on the
basis of raw labor plus 1638 for overhead plus 15% for
profit plus all project -related direct expenses.
Subcontractor costs will be marked up 5%. The additional
cost is dependent on the schedule of the CONTRACTOR but is
estimated to total $45,000, based on assumed manpower
requirements. The total for Task Order Number 12 as amended
is thus $96,000.
ARTICLE 3
Payment to the ENGINEER for services provided as described
in Article 1 is due to be paid within 30 days after the day
of billing.
mgDS4/024 -1-
ARTICLE 4
IN WITNESS WHEREOF
subscribe the same
ATTEST:
, the parties hereto each herewith
in triplicate.
ATTE T:
mgDS4/024
•
THE CITY OF FAYETTEVILLE, ARKANSAS
By:,•
NamC�
Dated this fi 'day of
CH2M HILL SOUTHEAST, INC.
By:
Dated this
-2-
1988
A d e
day of Ane -e -X- , 1988
MICROFILMED
FAYETTEVILLE, ARKANSAS
F. 0. DRAWER F
CH2M-Hill
2567 Fairlane Drive
P.O. Box 230548
Montgomery, Alabama 36123-0548
Attention: Mr. Dennis Sandretto
72701 [501] 521.7f00
April 13, 1988
FCH - 154
Subject: City of Fayetteville
Wastewater Treatment Plant Improvements
Engineering Services Contract
Task Order No. 12 Amendment No. 1
Dear Dennis:
Attached please find one (1) original signed copy of the above
referenced task order amendment for your files.
Very truly yours,
Bob Franzmei_r
Project Coordinator
Attachment
f ch4/03b
cc: Jim Pennington
File 3050-12