HomeMy WebLinkAbout15-87 RESOLUTIONRESOLUTION NO. 15-87 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDERS IN THE CITY'S CONTRACT WITH OLSON CONSTRUCTION COMPANY FOR IMPROVEMENTS TO THE WASTEWATER TREATMENT PLANT TO PROVIDE FOR ADDITIONAL PUMP FLANGES AND FOR MODIFICATION OF A SUPPORT CHANNEL AT THE RECYCLE PUMP STATION. BE IT RESOLVED BY THE BOARD OF DIRECTCIRS OF IRE CITY OF FAYETTE'VILLEF ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute change orders to the City's contract with Olson Construction Company for improvements to the Wastewater Treatment Plant to provide for additional pump flanges and for modification of a support channel at the recycle pump station. Copies of the change orders authorized for execution hereto are Attached hereto marked Exhibits "A" and "B" and made a part hereof. PASSED AND APPROVED this COI•r" ••., • ., •-fr day of March , 1987. APPROVED By '1741' 4 CONTRACT MODIFICATION (Change Order) Contract modification NO.: 17 Owner: Project Name: Contractor: MICROFILMED. DATE: 4/17/87 Fayetteville, Arkansas Wastewater Treatment Plant Improvements Project No.: M618766.A2, .A5 &.A6 Olson Construction Company The following modifications to the contract are hereby ordered: (Use additional pages if required.) Provide a special flange to join each of the 6-16" Denitrification Pump discharge flanges with the 6-18" pipe flanges per CR 0416. Order and receive the materials using force account methods as covered by the General Conditions, Article 70. An estimate of $6,730 is established for this force account, Phase I, change. The estimated price will be changed to actual cost in a subsequent Contract Modification. The parties cannot agree on the amount, if any, of time extension involved with the extra work, and therefore have agreed to bold consideration of a time extension, if any, and any costs associated with the same in abeyance. It is agreed by the parties that the contract provisions shall govern this Contract Modification except for the third sentence of the second paragraph of Article 70, General Conditions which is hereby modified. Contract Amount: Contract Duration/Completion Belt Filter Press Administration Bldg Phase I&II Phase III Original Contract $21,232,000 Date: 365 days 1/1/1987 9/1/1987 Previous This Changes** Change $175,878.44 $6,730 *14 Weeks 90 Days Revised Contract $21,414,608.44 *14 Weeks 455 Days 4/1/86 *From receipt of written order. Completion date is 12/5/85. CM #8, a force account modification estimated to cost $500, was approved. CM #9, a force account modification estimated to cost $300, was approved. CM #10, a force account modification estimated to cost $500, was approved. CM #16, a time extension modification was rejected by Olson Construction Company. APPROVED: FAYETTEVILLE OLSON CONSTRUCTION CO. P. O. Drawer F 3300 Rock Island R Fayetteville, Arkansas 72701 Irving, Tex3 95 BY:Aaidgerc)944/R4LludAY: Date: 4; Date 5-7 mgDS/008 7 CH2M HILL 2567 Fai ane Drive Montgo Alabama 116 Y' Date: IO4P00 Date: .5$6,74:r7 CONTRACT MCOIFICATION (Change Order) 1,contract Modification NO. :t19 (Revised) Owner: Fayetteville, Arkansas Project Name: Wastewater Treatment Plant Improvements Project No.: MG18766.A2, .1.5 6.A6 Contractor: Olson Construction Company The following modifications to the contract are hereby ordered: (Use additional pages if required) Insulate deionized water lines in Admin. Bldg. (CMIR #71, CR #380 • Change typeof air/vacuum valves on the DNR & RAS lines (CMIR #72 & CR 431) Change manufacturer of pressure regulators for primary and secondary sludge and ($1,276) •scum pumps (OCR USA) Change type of air/vacuum valves on BYP and BYP fl(lines (CMIR #72A) Change material of oxygen solution line valves (CMIR #608 and CR #321) Change manufacturer of pressure regulators for seal water for 2 filter backwash pumps (OCR #45A) Install concrete drip pad for Oxygen delivery (C(IR #68A and CR #426) • Change location of storm sewer inlet (CMIR #67 and CR #385) Provide flashing between brick and block at Blower Bldg. and Equipment Storage Bldg. (CMIR #55) Change 1" and 2" air valves in Filter Bldg. from ball type to gas cock type (C(IR #75 and CR #386) Change manufacturer of preSsure regulators for seal water for 3 digested sludge pumps (CMIR #45A) DATE: 5/22/67 $ $1,279 -1"mag Phase I 495 $ 950 $ 994 ($425) $3,455 U1691/ $3,102 Phase II $6,665 Phase III ($3,920) 1 ($1,456) ($ 638) This contract modifications constitutes full and mutual accord and satisfaction for all time and all costs related to this change. By acceptance of this contract modification, the contractor hereby agrees that the modification represents an equitable adjustment to the contract, and further, agrees to waive all right to file any further claims or changes arising out of or as a result of this change, or the accumulation of executed Contract Modifications on this Contract. Original Contract Contract Amount: $21,232,000 Contract Duration/Completion Date: Belt Filter Press Administration Bldg Phase I&II Phase III 365 days 1/1/1987 9/1/1987 Previous Changes** $185,132.44 *14 Weeks 90 Days This $5,707 Revised Contract $21,4221839.44 • *14 Weeks 455 Days 4/1/86 *From receipt of written order. Completion date is 12/5/85. **CM #8, a force account modification estimated to cost $500, was approved. CM #9, a force account modification estinated to cost $300, was approved. CM #10, a force account modification estimated to cost $500, was approved. CM #16, a time extension modification was rejected by Olson Construction Company. CM #17, a force account modification estimated to cost $6,730, was approved. CM #16, a force account modification estimated to cost $2,524, was approved. APPROVED: FAYETTEVILLE P. O. Drawer F Fayetteville, Arkansas OLSON COMSTRUCTICN CO. CH2M HILL 3300 Rock Island Road e Drive Alabama/ 72701 Irving, Texas 9 $5,707 Date: 7±Xg1997:te:P BY: 57