HomeMy WebLinkAbout75-86 RESOLUTIONRESOLUTION NO. 75-86
A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK
TO EXECUTE AMENDMENT NO. 1 TO THE CITY'S AGREEMENT
WITH CH2M HILL SOUTHEAST, INC. TO FURNISH OPERATIONS
AND MANAGEMENT SERVICES FOR THE FAYETTEVIT.T,F WATER
POLLUTION CONTROL PLANT TO AMEND THE SCOPE OF
SERVICES AND COMPENSATION UNDER SAID AGREEMENT.
BE IT RESOLVED BY 111E BOARD OF DIRECTORS OF THE CITY OF FAYElTEVILLE,
ARKANSAS:
That the Mayor and City Clerk are hereby authorized and directed
to execute Amendment No. 1 to the City's agreement with CH2M Hill
Southeast, Inc. to furnish operations and management services for
the Fayetteville Water Pollution Control Plant to amend the scope
of services and compensation under said agreement. A copy of the
amendment authorized for execution hereby is attached hereto marked
Exhibit "A" and made a part hereof.
PASSED AND APPROVED this 15thday of July , 1986.
r,,. ATPEST...
,._';BYO,
.
��kk in
f
:Clerk
it i; kr�fw r N n ;
g 4 a .n
y S �_
F`•`c iFQ:4"F �•. ��:,. v1*
APPRO
:31
By: / , Sd'
Mayor
•
AMENDMENT NO. 1
AGREEMENT BETWEEN FAYETTEVILLE; ARKANSAS AND
CH2M HILL SOUTHEAST, INC.
TO FURNISH OPERATIONS AND MANAGEMENT SERVICES FOR
FAYETTEVILLE, ARKANSAS WATER POLLUTION CONTROL PLANT
/S' day
This amendment is made and entered into
/, 1986 by and between
Arkansas/ (hereinafter referred to as the Owner) and CH2M HILL
Southeast, Inc. (hereinafter referred to as Engineer). This
Amendment No. 1 amends the agreement dated 27 February 1984 between
the Owner and the Engineer.
this
of
the City of Fayetteville,
Article 2 - DEFINITIONS is
"Adequate Nutrients" means
iron contents proportional
nitrogen,
amended by adding the following: 2.12
plant influent nitrogen, phosphorus, and
to BOD5 in the ratio of five (5) parts
one (1) part phosphorus, and one half (0.5) part iron for
each one hundred (100) parts BOD5 as measured on a monthly average
basis.
"2.14 'ADPC,&E' is the Arkansas Department of Pollution Control and
Ecology."
Article 5 - SCOPE OF SERVICES is amended by changing the following:
In the third and four paragraphs of 5.1, similarly change "...NPDES
permit..." to "...ADPC&E and NPDES permits..." wherever the phrase
appears.
Replace' paragraph 2 of 5.1 with the following: "Engineer shall be
responsible for meeting the effluent quality limitations of OWNER's
NPDES and ADPC&E permits unless one or more of the following
occurs: (1) the treatment plant influent at all times does not
contain adequate nutrient to support operation of Treatment Plant
biological processes and/or contains abnormal or biologically toxic
substance which cannot be removed by, or interfere with the
existing process and facilities; (see Appendix D) (2) the flow,
influent HOD5, and/or suspended solids exceeds the Treatment Plant
loading parameters which are 11.4 million gallons per day, 25,700
jh/DH/010
pounds of BOD5 per day, 21,300 pounds of suspended solids per day,
and a daily peaking factor of 2.2 times flow, BOD5, or suspended
solids. (Attached Appendix D ). Such loadings shall be measured
on the basis of a monthly average.
Add the following sentence to Article 5.6: "Employees occupying
positions that are eliminated because of phasing out of existing
facilities will be given the opportunity to be trained for any
new and vacant positions created as a result of new treatment
facilities being put into service."
Delete the third sentence of Article 5.9 and replace the fourth
sentence with: "A fee may be charged for use of equipment and
personnel from any municipal department but any such fee shall not
exceed the normal interdepartmental charged administered by the
Owner." To the last sentence in Article 5.9 after "...heavy
equipment..." add "...and personnel...".
Article 5.11 shall be replaced by the following: "Engineer's
responsibility for the disposal of screenings, sludge, and grit is
limited to the disposal sites and methods in use at the time of
initiation of full contract services until the sludge disposal plan
contained in the June 9, 1983, 201 Facilities Plan is implemented.
An appropriate change of scope to reflect any change in the
Engineer's costs resulting from implementation of the new plan will
be subject to negotiation."
Article 5.12 is amended by changing "...NPDES permit..." to
"...ADPC&E and NPDES permits".
Article 6 - COMPENSATION
Article 6.1 is replaced in its entirety by the following:
6.1 For services rendered by Engineer, during the first year after
the commencement date, Owner shall pay to Engineer the actual
Cost of services performed under Article 5, plus a Fee
equivalent to Sixty Three Thousand Two Hundred. Seventy Three
Dollars ($63,273) in 1987 dollars. Said Fee and estimated
jh/DH/010
Cost's shall be paid in twelve (12) equal monthly installments.
Owner shall pay in accordance with Article 7.1.
Article 6.4 is amended by replacing it with the following:
6.4 Engineer estimates the annual actual Cost for services under
this Agreement in 1987 to be Two Million One Hundred Thirty
Two Thousand Eight Hundred Dollars ($2,132,800) in 1987
dollars. Details of said estimated annual Cost are shown in
Exhibit G. After services have begun Engineer will provide
Owner with an estimate of actual Cost annually four (4) months
prior to a new contract year.
Article 10 - TERM AND TERMINATION
Article 10.1 is amended by replacing "the initial term of this
agreement shall be two (2) years and shall commence on the day that
construction of the aforesaid treatment plant is completed, ..."
with "the initial term of this agreement shall be two (2) years and
shall commence on January 1, 1987,..."
APPENDIX B
Appendix B is amended by adding a heading for the attached ADPC&E
permit using similar language as for the NPDES permit except
changing "NPDES" to ADPC&E" wherever it occurs, and attaching the
ADPC&E permit.
APPENDIX G
Appendix G is deleted in its entirety and replaced with the
attached revised Appendix G.
jh/DH/010
IN WITNESS THEREOF, the parties hereto each herewith
subscribe the same in triplicate.
ATTEST:
FOR T CITY OF FnnAYETTEVILLE, ARKANSAS
CE 'HP
(Name)
By
FOR CH2M HILL SOUTHEAST, INC.
By:
(Title)
tN e (Title)
Dated this /5 day of
ih/DS/010
1986
APPENDIX B
ADPC&E Permit for each Treatment Facility
and Mutually Agreed Exclusion
1. Treatment Facility name
ADPC&E Permit number
Copy of existing ADPC&E Permit
attached to this Agreement and
jh/DS/010
dated
for above facility is
is a part of this Agreement.
•
APPENDIX G
City of Fayetteville
Estimated Cost for Treatment Plant
Direct Labor and Benefits $ 626,655
Labor Overhead @ 35% 219,329
Utilities 589,180
Utilities Overhead @ 5% 29,459
All other Direct Costs 607,434
Administrative Overhead @ 10% 60,743
TOTAL ESTIMATED COST $2,132,800
*Repairs are estimated at $45,000
ih/ns/nin
•
APPENDIX D
AVERAGE FLOW AND WASTEWATER CHARACTERISTICS
1. The average daily flow from Fayetteville Wastewater Treatment
Facility for the purposes of this Agreement is 11.4 million
gallons per day.
2. The average concentration, on the basis of a 24 hour composite
sample, of BOD5, suspended solids, ammonia nitrogen, and
phosphorus for the purposes of this Agreement are 25,700
lbs/day, 21,300 lbs/day, 3,300 lbs/day, and 700 lbs/day,
respectively.
3. The maximum daily concentration of various heavy metals, on
the basis of 24 hour composite, that can be contained in the
treatment plant influent are as follows:
Metal _Concentration, mg/1
Cyanide 0.30
Cadmium 1.0
Chromium 0.25
Copper 1.00
Lead 0.50
Nickel 0.25
Zinc 1.00
If the concentration of any single metal is higher than those
listed above, and results in a "biological upset", which causes a
NPDES or ADPC&E violation, OMI shall not be held responsible for
the violation(s) attributable to that biological upset.
If an "Biological Upset" occurs which can be traced to metal
toxicity, caused by influent concentrations lower than those listed
above, OMI retains the right to seek relief from the City of
Fayetteville.
7h/DH/010