Loading...
HomeMy WebLinkAbout54-86 RESOLUTIONRESOLUTICEI NO. 54_86 ka A3/4 .0_1 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CTPRK TO EXECUTE AN AMENDMENT 10 THE CITY'S BASIC PEREEMENT WITH CH2M HILL, TO INCLUDE PREPARATION OF AN AMENEMENT TO THE FACILITY PLAN AND PREPARATION OF PLANS SPECIFICATIONS AND BIDDING COCUMENTS FOR REHA13ILITPTION OF THE EXISTING PLANT EQUIPMENT THAT WILL BE REUSED IN THE NEW TREATMENT PLANT. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF TIE CITY OF FAYEITEVILIE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute an amendment to the City's basic agreement with �2M Hill, to include prepai-ation of an amendment to the facility plan and preparation of plans, specifications- and bidding documents for rehabilitation of the existing plant equipment that will be reused, in the new treatment plant. A copy4 of the amendment authorized for execution hereby is attached hereto marked Exhibit "A" and made -a part hereof.: PASSED AND APPROVED this 6th day of Ma y 1986. APPROVED Mayor ate, TASK ORDER NUMBER 8 EXISTING PLANT EQUIPMENT REHABILITATION DESIGN AND SERVICES DURING CONSTRUCTION Task Order Number 8 amends the Basic Agreement executed be- tween CH2M HILL Southeast, Inc. (Engineer), and the City of Fayetteville, Arkansas (Owner), on the 20th day of July, 1983. Article 1 The scope of work is to provide engineering services to prepare an addendum to the facility plan, prepare design plans and specifications for bidding the rehabilitation of the existing wastewater treatment plant's bar screens and conveyor, vacuators, grit separators, classifiers, pumps and conveyor, gravity thickeners and air float thickeners. The bid documents will be prepared to phase the work such that maximum use of the grant contingency for both the FY84 and 85 grants can be made as well as use of any additional FY86 grant or FY87 grant money that may become available. The Engineer shall also perform the engineering services during construction, including shop drawing review and resident observation. The resident observation is based on an assumed need of a resident observer half time for 20 weeks of construction. Article 2 As consideration for providing the services enumerated in Article 1 above, the Owner shall pay the Engineer on the basis of raw labor plus 163% for overhead plus 15% for prof- it plus all project related direct expenses. Subcontractor costs will be marked up 5%. The cost shall not exceed $65,595 unless an increase is authorized by the City in writing. Article 3 Payment to the Engineer for services provided as described in Article 1 is due to be made within 30 days after date of billing. Article 4 -- IN WITNESS WHEREOF, •the parties hereto each herewith scribe the same in triplicate. ATTEST: [5.(- ( FORIXELTITY F YETTEVILLE, By: Creted , JAI Nam ATTEST: sub - ARKANSAS FOR ILL SOUTH AST, INC. By: Pot9L act 3h/DS2/047 Dated fzi-0 Name T 1 - this 7-/ day of 4fled , 1986