HomeMy WebLinkAbout54-86 RESOLUTIONRESOLUTICEI NO. 54_86
ka A3/4 .0_1
A RESOLUTION AUTHORIZING THE MAYOR AND CITY CTPRK
TO EXECUTE AN AMENDMENT 10 THE CITY'S BASIC PEREEMENT
WITH CH2M HILL, TO INCLUDE PREPARATION OF AN AMENEMENT
TO THE FACILITY PLAN AND PREPARATION OF PLANS
SPECIFICATIONS AND BIDDING COCUMENTS FOR REHA13ILITPTION
OF THE EXISTING PLANT EQUIPMENT THAT WILL BE REUSED
IN THE NEW TREATMENT PLANT.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF TIE CITY OF FAYEITEVILIE,
ARKANSAS:
That the Mayor and City Clerk are hereby authorized and directed
to execute an amendment to the City's basic agreement with �2M Hill,
to include prepai-ation of an amendment to the facility plan and preparation
of plans, specifications- and bidding documents for rehabilitation
of the existing plant equipment that will be reused, in the new treatment
plant. A copy4 of the amendment authorized for execution hereby is
attached hereto marked Exhibit "A" and made -a part hereof.:
PASSED AND APPROVED this 6th day of Ma y 1986.
APPROVED
Mayor
ate,
TASK ORDER NUMBER 8
EXISTING PLANT EQUIPMENT REHABILITATION
DESIGN AND SERVICES DURING CONSTRUCTION
Task Order Number 8 amends the Basic Agreement executed be-
tween CH2M HILL Southeast, Inc. (Engineer), and the City of
Fayetteville, Arkansas (Owner), on the 20th day of July,
1983.
Article 1
The scope of work is to provide engineering services to
prepare an addendum to the facility plan, prepare design
plans and specifications for bidding the rehabilitation of
the existing wastewater treatment plant's bar screens and
conveyor, vacuators, grit separators, classifiers, pumps and
conveyor, gravity thickeners and air float thickeners.
The bid documents will be prepared to phase the work such
that maximum use of the grant contingency for both the FY84
and 85 grants can be made as well as use of any additional
FY86 grant or FY87 grant money that may become available.
The Engineer shall also perform the engineering services
during construction, including shop drawing review and
resident observation. The resident observation is based on
an assumed need of a resident observer half time for 20
weeks of construction.
Article 2
As consideration for providing the services enumerated in
Article 1 above, the Owner shall pay the Engineer on the
basis of raw labor plus 163% for overhead plus 15% for prof-
it plus all project related direct expenses. Subcontractor
costs will be marked up 5%. The cost shall not exceed
$65,595 unless an increase is authorized by the City in
writing.
Article 3
Payment to the Engineer for services provided as described
in Article 1 is due to be made within 30 days after date of
billing.
Article 4 --
IN WITNESS WHEREOF, •the parties hereto each herewith
scribe the same in triplicate.
ATTEST:
[5.(-
(
FORIXELTITY F YETTEVILLE,
By: Creted , JAI
Nam
ATTEST:
sub -
ARKANSAS
FOR ILL SOUTH AST, INC.
By:
Pot9L act
3h/DS2/047
Dated
fzi-0
Name
T 1
-
this 7-/ day of 4fled , 1986