HomeMy WebLinkAbout53-86 RESOLUTIONRESOLUTION PD. 53-86 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A CONTRACT WITH OLSON CONSTRUCTION COMPANY FOR CONSTRUCTION OF THE CITY'S SLUDGE MANAGEMENT SYSTEM FOR A LUMP SUM OF $3,680,775 CONTINGENT UPON APPROVAL BY THE ARKANSAS DEPARTMENT OF POLLUTION CONTROL AND ECOLOGY. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute a contract with Olson Construction Company for construction of the City's Sludge Management System for a lump sum of $3,680,775.00 contingent upon approval of said contract by the Arkansas Department of Pollution Control and Ecology. A copy of the ontract so authorized hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 6th day of May. L , 1986. •OZI..1; ••:1•1 10•7.. .3/47 • • .E11,44.*7 a '••7" FAVYETTEITILLE, AaRICANSA.S OFFICE OF CITY MANAGER P. 0. DRAWER F 72702 Mr. George Gaharan Vice President / Division Manager Olson Construction Company 3300 Rock Island Road Irving, Texas 75060 July 29, 1986 FOL - 128 . Subject: City of Fayetteville Sludge Management System Contract'B - C 050366-13-1 Contract Documents Distribution Dear Mr. Gaharan: (601) 621-7700 Enclosed, please fine one (1) original executed copy of the Contract B documents and drawings for your files. Sincerely yours, Donald L. Grimes City Manager Enclosure cc: Dennis Sandretto ( w / encl. ) Joe Tarvin Paul Bouchey Ted Ivy ( Deryl Burch - n/), C/erk‘s- Cy/ or 2:7°r---€4-1-11. 71-; Don Bunn Mike Lawrence File 3260 FAYETTEVILLE WASTEWATER MANAGEMENT SYSTEM SLUDGE MANAGEMENT SYSTEM • CONTRACT B VOLUME 1 SPECIFICATIONS For City of Fayetteville, Arkansas For information regarding this project, contact Dennis Sandretto, P.E. Montgomery, Alabama 205/271-1444 PREPARED BY: CH2M HILL AND McCLELLAND CONSULTING ENGINEERS, INC. April 1984 Revised December 1985 MG17335.131 4 MIIIIIII Engineers MI111111 Planners WUUNg Economists MI111111 Scientists April 21, 1986 MG18766.B6.02 Mr. Bob Franzmeier Project Coordinator City of Fayetteville 113 West Mountain Street Fayetteville, Arkansas 72701 Dear Bob: Subject: Recommendation of Award for the Sludge Management System Project On April 17, 1986, we opened bids for the sludge management project. There were three bidders. These bids are shown on the attached Bid Tabulation Sheet. The difference between the high and low bids was about thirteen percent, which is a good indication of the reasonableness of the bids. The lowest responsible responsive bidder is Olson Construction Company. This is the same contractor who is constructing the wastewater treatment plant. Their bid for Alternate A was $3,565,775. The addition of the flow •augmentation device (in Alternate B) resulted in a bid of $3,685,775 or a difference of $120,000 for the flow augmentation device. The flow augmentation device was required by the facility plan. Adding some cost due to inflation to the facility plan cost estimate of $115,000 for that device results in a cost estimate higher than the bid price of $120,000. We therefore recommend proceeding with the flow augmentation device and award of the contract Alternate B. We based our design upon equipment items which were listed in the contract documents. Alternate or substitute equipment was allowed to be written in the proposals as long as it was equal to that specified and was priced to include any additional costs from redesign and construction resulting from its being different than the equipment listed. Olson Construction Company proposed a deductive C! -12M HILL Montgomery Office 2567 Fairfone Drive PO. Box 2499. 205 271 1444 Montgomery, Alabama 36/04 Mr. Bob Franzmeier Page 2 April 21, 1986 MG18766.26.02 alternate for the low voltage motor control centers of $5,000. We have evaluated their proposal and recommend award of the contract with the GE low voltage motor control centers at a reduced cost of $5,000. Therefore, the lowest lump sum cost from the three bids is that from Olson Construction Company for a cost of $3,680,775. We hereby recommend the award to Olson Construction Company of Alternate B with the deduct of Section 16155 for a total contract price of $3,680,775. If you have any questions, please don't hesitate to call. Very truly yours, 4-J- upaQace_ -Pcw-Dennis A. Sandretto, P.E. Project Manager jd/MGDS2/073 Enclosure cc: Jim Davis Jim Otta/GNV BMW SUBJECT / Meallag S=czd c >el_224_1‘1/4( RC:7 )2 "ir A as• 7-L7 4U &1)_739/3ac47-iLlAz _ 73/ /1//9/-n c.,c477c)A/ c-1-7A/Sieu 5,14 /A/ZEdeS S/Ssez Lot LE) Ayek D Se C cife ry 4.576A/ED peci-7011q c_ Co A/Tie/9 Poe 6oc)000 ODE r IO19 114004E-EISEL 4 2, 3 c/m/g 5 uh, /3/2Y PROJEC cotavEs L S ort e.c.,1/4/372e a c car,/ MilsEl tiry/20 reset), Are/ rA 4.-- 3,4oc,00O 2, s-voi 0 .0 /, , 3 LTE/eilgTri 9z• c /0o 3,93 7, 0 SCS,71.5" Lragivgrt 6 sccs co /67, coo • 3ti3 S; 7 7 s o[/rLqc 7idu(15 01 5E61 7 e A/ /2379 thEclio),./ // 3 83 C sEctio),/ /34-C ,SEcTioa /5-003 3;000 .57., 0 c, 111111111 Engineers 111=1 Planners PF 1:1011 Economists Scientists ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS for the construction of the Sludge Management System Contract B City of Fayetteville, Arkansas To All Planholders: Date: Project EPA No. April 9, 1986 No.: MG17335.81 MG18766.B6 C-050366-13 Gentlemen: The following changes, additions, and/or deletions are here- by made a part of the Contract Documents for the con- struction of the Sludge Management System Contract B, dated April 1984, Revised December 1985 as fully and completely as if the same were fully set forth therein: SPECIFICATIONS I. INVITIATION TO BIDDERS A. Page 2, next Delete ", in to last paragraph, first sentence. triplicate,". INSTRUCTIONS TO BIDDERS A. Page 5, Item 10. sentence. Delete 3 CONTRACT Submission of Proposal, first ", in triplicate," A. Page 1, item 2, add to the end of the last sentence "except for the sod and grass establishment which shall be completed by October 1, 1987." jd/MGDS2/069 MG18766.86.02 Addendum No. 3 -1- • CH2M HILL Montgomery Office 2567 Foirlone Drive, PO. Box 2499, 205.271.1444 Montgomery, Alabama 36104 SUPPLEMENTARY CONDITIONS Page 2, top of page, add the following: "ARTICLE "NOTICE TO PROCEED" Add to the last sentence "except for Phase 2, for which a separate Notice to Proceed shall be issued as stated in the Proposal (REV.)." EPA SUPPLEMENTAL CONDITIONS A. Add the Certification of Contractor or Subcontractor Regarding Debarment, Suspension, Or Voluntary Exclusion attached herewith. 6. SECTION 01001, GENERAL REQUIREMENTS A. Page 2, PROGRESS OF PIPELINE CONSTRUCTION Add the following paragraph after the first paragraph: "The sludge and effluent force mains shall be constructed from the boundary with Contract A eastward to station 20+00. Access to the portion of the site from a north to south line thru station 20+00 to a north to south line thru station 30+00 which includes the section of force mains from station 20+00 to 30+00 and laterals E-7, EP -1, and E-1 shall be disallowed until August 1, 1986, to allow an archaeological study to be performed. No work shall be performed and no access granted to that part of the site until written permission from the Owner is provided, which shall be not later than August 1, 1986. Access to work east of station 30+00 is unaffected." 7. SECTION 15003, DUCTILE IRON PIPE AND CAST IRON FITTINGS A. Page 1, paragraph 61 FLANGED CAST IRON FITTINGS, second line. Change "250" pound ANSI to "125" pound ANSI, and "250" psi to "200" psi. 8. SECTION 15080, MANUALLY OPERATED VALVES AND CHECK VALVES A. Page 3, GATE VALVES, paragraph under TYPE 100, line 4. Change "standard working pressure" to "steam working pressure". jd/MGDS2/069 MG18766.86.02 Addendum No. 3 -2- 4 B. Page line 5, PLUG VALVES, paragraph under TYPE 400, 4. Change "screwed ends" to "flanged ends". C. Page 5, line 7. ANSI". DRAWINGS PLUG VALVES, paragraph under TYPE 405, Change "250 -pound ANSI" to "125 -pound - 1 Sheet G-6, under SLUDGE LATERALS add the following note: A pig catcher, as shown in Detail 7 in Drawing 0-2 shall be installed on the end of all sludge laterals." 2. Sheet P-20, under air valve callout on the end of lateral E-5. Change the detail number from "6" to 11 1 0 3. Sheet P-190, under blow -off callout on laterals S-1 and E-2. Change the detail number and drawing reference number from "9" to "5" and B from "0-2" to "D-1", respectively. All Bidders shall acknowledge receipt and acceptance of this Addendum No. 3 in the Proposal by submitting the signed Ad- dendum with the bid packages. Proposals submitted without acknowledgements or without this Addendum will be considered informal. Very truly yours, CH2M I�LL, Inc. Dennis A. Sandretto, P.E. Receipt acknowledged and conditions agreed to this day of ..../tea -1 1986. C.-.0r..)Steocir70),•_/ Bidder By 3d/MGDS2/069 MG18766.B6.02 Addendum No. 3 -3- CERTIFICATION OF CONTRACTOR OR SUBCONTRACTOR REGARDING DEBARMENT, SUSPENSION, OR VOLUNTARY EXCLUSION.• The firm submitting a bid or proposal on the project of which this contract is a part certifies that it is not debarred, suspended or voluntarily excluded from participation in EPA or any other Federally assisted programs. This firm will obtain a written certification to this effect from all lower tier subcontractors and make the certification available to the owner. /24W,PC• Signat re of Principal - Date jd/MGDS2/069 MC18766.136.02 Addendum No. 3 -4- a• Engineers a Planners PF PI! MIN Economists Scientists ADDENDUM NO. 2 TO THE CONTRACT DOCUMENTS for the construction of the Sludge Management System Contract B City of Fayetteville, Arkansas To All Planholders: Gentlemen: Date: March 25, 1986 Project No.: MG17335.B1 MG18766.B6 EPA No.: C-050366-13 The following changes, additions, and/or deletions are here- by made a part of the Contract Documents for the con- struction of the Sludge Management System Contract 8, dated April 1984, Revised December 1985 as fully and completely as if the same were fully set forth therein: SPECIFICATIONS 1. INVITATION TO BID, page 1, first paragraph, fifth line, change "April 10, 1986" to "April 17, 1986" 2. SECTION 15001, page 5, paragraph 6, last line in the table, change the Maximum Support Hanger Spacing from "14 feet" to "8 feet" and the Minimum Rod Size from "1 -inch" to "7/8 -Inch". . All Bidders shall acknowledge receipt and acceptance of this Addendum No. 2 in the Proposal by submitting the signed Ad- dendum with the bid packages. Proposals submitted without acknowledgements or without this Addendum will be considered informal. Very truly yours, /CH2M /WILL, Inc. 41K, -/Stlt-------'- ,, •: Dennis A. Sandretto, P.E. 9??MODS2/0 e4epn1gomery Office256711 pgrtierfeek Tf.6 LA! 2499, Montgomery, alcipomo 36104 Addendum20friel•/424 Receipt acknowledged and conditions agreed to this /7 day of irecyLic._ , 1986. Bidder By 3d/MGD82/064 MG18766.86.02 Addendum No. 2 -2- Engineers APM0044E Pfonnea PWINNV Economists MUISM2MR Scientists ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS for the construction of the S ludge Management System Contract B City of Fayetteville, Arkansas To All Planholders: Gentlemen. Date: March 10, 1986 Propect No.: MG17335.B1 MG18766.86 EPA No.: C-050366-13 The following changes, additions, and/or deletions are hereby made a part of the Contract Documents for the construction of the Sludge Management System Contract B, dated April 1984, Revised December 1985 as fully and completely as if the same were fully set forth therein: SPECIFICATIONS 1 CONTENTS A. Page 3. DIVISION 13 - SPECTAL CONSTRUCTION, add: "13611, Flow Augmentation Device 1-3.” INVITATION TO BID, A. Page 1, first paragraph change "72702" to "72701". B . Page 2. After Item 12 in the list of major work elements add: "The above items are included in Alternate A. Alternate B shall consist of the same items plus the Flow Augmentation Device at the White River Dam." C. Page 2, first full paragraph, change "72702" to "72701" and change "P. O. Box 1647, Gainesville, Florida 32602" to "2567 Fairlane Drivel P. 0. Box 2499, Montgomery, Alabama 36104". D . Page 2, FULL-SCALE DRAWINGS AVAILABLE change "P. 0. Box 1647, Gainesville, Florida, 32602" to 2567 Fairlane Drive, P. 0. Box 2499, Montgomery, Alabama, 36104". jh/PW/002 CH2M HILL MG18766.B6.02 Addendum No. 1 -1- Montgomery Office 2567 Fair/ane Drive, P.O. Box 2499, 20527t 1444 Montgomery, Aloloom° 36104 3. INSTRUCTIONS TO BIDDERS A. Page 4, Part 8, TYPE OF PROPOSAL, Article "A. LumP Sum". Replace the paragraph with the following: "When the Proposal for the work is to be submitted on a lump sum basis, a single lump sum price shall be submitted in the appropriate places. The total amount to be paid the Contractor shall be the amount of the lump sum Proposal as adjusted for additions or deletions resulting from the Owner selecting alternate or substitute equipment (as covered in the Proposal) and from changes in con- struction." B. Page 5, Part 13, BID SECURITY, add to the end of the first sentence "for Alternate B." C. Page 6, Part 151 AWARD OF CONTRACT, first' sentence, change "30" calendar days to "90" calendar days. D. Page 6, Part 16, BASIS OF AWARD, add the following after the last paragraph: "This Contract will be awarded on the basis of the proposal with the lowest total price consisting of the Lump Sum Base Bid less the stated deductions for allowed substitute'products, for either Alternate A or Alternate B, whichever the Owner deems is in his best interest." 4. PROPOSAL A. Replace the PROPOSAL in its entirety with the •PRO- POSAL (REVISED) attached herewith. 5 BID BOND A. Replace the BID BOND in its entirety with the BID BOND (REVISED) attached herewith. 6 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Supplemental Conditions A. Add the following notice in front of the UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Supplemental Conditions: "Notice: jh/PW/002 MG18766.B6.02 Addendum No. 1 -2- a • The Contract Work Hours and Safety Standards Act in the Walsh -Healey Public Contracts Act were amended to nO longer require overtime pay for hours worked in excess of 8 per day. Effective January 1, 1986, overtime pay is required only for hours worked in excess of 40 per week. Please disregard 11 reference in the attached material to overtime pay for hours worked in excess of 8 per day." Add Arkansas Department of Pollution Control and Ecology cover letter dated 6 March 1986 and the subject Department of Labor Wage Decision Numbers AR86-4 and AR86-7. Total of 6 pages, attached herewith. 7. SECTION 13611, FLOW AUGMENTATION DEVICE Add SECTION 13611 attached herewith for the Flow Aug- mentation Device (to be included only in the Alternate B lump slim base bid). SECTION 15091, CONSTRUCTION ACROSS WHITE RIVER A. Page 2, PERMITS AND EASEMENTS AND REGULATIONS Replace the second sentence with: "The permit is to be included in Addendum No. 1." The Corps permit is attached herewith. DRAWINGS 1. Add Drawings F-1, F-2, and F-3 attached herewith for the Flow Augmentation Device (to be included only in the Alternate B lump sum base bid). All Bidders shall acknowledge receipt and acceptance of this Addendum No. 1 in the Proposal by submitting the signed Ad- dendum with the bid package. Proposals submitted without • jh/PW/002 MG18766.86.02 Addendum No. 1 -1. 1 acknowledgements or without this Addendum will be considered informal. Very truly yours, CH2M ILL, Inc. e, A R. _ I •• „ „ „ , ,,,,,,, Dennis A. Sandretto, P.E. Receipt acknowledged and conditions agreed to this day of 1986 L PL -I C. -0).J 5TR-0 Crii n_.; Bidder By jh/PW/002 MG18766.96.02 Addendum No. 1 -4- REPLY TO ATTENTION OF Con -Ops Div Permits Branch DEPARTMENT OF THE ARMY LITTLE ROCK DISTRICT, CORPS OF ENGINEERS POST OFFICE BOX 867 LITTLE ROCK. ARKANSAS 72203 Oanuary 27, 1986 W -D-050-03-3470 Mr. Scott Linebaugh City of Fayetteville P.O. Drawer "F" Fayetteville, Arkansas 72701 Dear Mr. Linebaugh: Under authority of Section 404 of the Clean Water Act, • enclosed is Permit No. W -D-050-03-3470 which authorizes the • placement -of 770 and 660 cubic yards of clean fill material below the ordinary high watermark on the White River at stream mile 687.5 for two stages in cofferdam construction of a pipeline crossing. Also included would,be the after -the -fact placement of 500 cubic yards of fill and 400 feet of channel straightening on an unnamed tributary on the left bank of the White River at stream mile 687.5, Washington County, Arkansas. To comply with General Conditions "b" and "c" of the permit, you should contact the Arkansas Department of Pollution Control and Ecology, 8001 National Drive, Little Rock, Arkansas 72209, for guidance on what water pollution control measures will be required to protect the water quality and uses •in the waters covered by this permit. Your attention is specifically directed to General Conditions "g" and "h" of the permit which provide that the structure shall be maintained in good condition and in accordance with the approved plans. The Corps of Engineers reserves the right to perform periodic inspection of the facility to assure compliance with the conditions of the permit. It is your responsibility and extremely important that you make any of your employees or agents involved in this operation continuously aware of the conditions of this permit. Your facility is located on property over which the Government has acquired a flowage easement. The enclosed Consent to Easement authorizes your construction on the easement. • If prehistoric artifacts such as pottery, tools of stone, animal or fossil bones, stoneware or old foundations, etc., are observed during construction, they should be left undisturbed and the Arkansas Archeological Survey, P.O. Box R, Fayetteville, Arkansas 72701, telephone 575-3556, notified immediately. If any future changes whatsoever are proposed to be made in the facility, you are required by law to submit revised plans to the District Engineer for approval before construction of the change is begun. Enclosure Sincerely, Robert 14. W. Whitehead Colonel, -Corps of Engineers o_District Engineer CERTIFIED - CERTIFIED MAIL - RETURN RECEIPT REQUESTED W -D-050-0.4, .470 Application No. Name of Applicant City of Fayetteville Effective Date Expiration Date (/! applicable) DEPARTMENT OF THE ARMY PERMIT Referring to written request dated September 18, 1985 for a permit to: I Perform work in or affecting navigable waters of the United States, upon the recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers and Harbors Act of March 3,1899(33 U.S.C. 409); 4X) Discharge dredged or fill material into waters of the United States upon the issuance of a permit from the Secretary of the Army acting through the Chief of Engineers pursuant to Section 404 of the Clean Water Act (93 U.S. C. 1344); I I Transport dredged material for the purpose of dumping it into ocean waters upon the issuance of a permit from the Secretary of the Army acting through the Chief of Engineers pursuant to Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (86 Stat. 1052; P.L. 92-532); City of Fayetteville 113 West Mountain P. O. Drawer "F" Fayetteville, Arkansas 72702 is hereby authorized by the Secretary 54 the Army: to place 770 and 660 cubic yards of clean fill material below the ordinary high watermark and adjacent wetlands of the White River at river mile 687.8 for two stages in cofferdam construction of a pipeline crossing Also, the after -the -fact placement of 500 cubic yards of fill and 400 feet of channel straightening of an unnamed tributary on the left bank of the White River at river mile 687.5. in White River at river mile 687.5 and 687.8 near Fayetteville Wastewater Treatment Plant, Washington County, Arkansas. in accordance with the plans and drawings attached hereto which are incorporated in and made a part of this permit (on draw- ings, give file number or other definite identification marks.) W -D-050-03-3470 CITY OF FAYETTEVILLE STREAMBED FILL WHITE RIVER AT RIVER MILE 687.5 OCTOBER 1985 SHEETS 1 thru 8 of 8 subject to the following conditions: I. General Conditions: a. That all activities identified and authorized herein shall be consistent with the terms and conditions of this permit; and that any activities not specifically identified and authorized herein shall constitute a violation of the terms and conditions of this permit which may result in the modification, suspension or revocation.of this permit, in whole or in part, as set forth more specifically in General Conditions j or k hereto, and in the institution of such legal proceedings as the United States Govern. ment may consider appropriate, whether or not this permit has been previously modified, suspended or revoked in whole or in part. ENG FORM 1721, Sep 82 EDITION OF 1 JUL 77 IS OBSOLETE (ER 114.5-2.30) 1 • • • b. That all activities authorized herein shall, if they involve, during their construction or operation, any discharge of pollutants into waters of the United States or ocean waters, be at all times consistent with applicable water quality standards, effluent limitations and standards of performance, prohibitions, pretreatment standards and management practices establish- ed pursuant to the Clean Water Act 133 (J.S.C. 1344), the Marine Protection, Research and Sanctuaries Act of 1972 (P.L. 92-532, 86 Stat. 1052), or pursuant to applicable State aria local law. c. That when the activity authorized herein involves a discharge during its construction or operation, or any pollutant (including dredged or fill material), into waters of the United States, the authorized activity shall, if applicable water quality stall• dards are revised or modified during the term of this permit, be modified, if necessary, to conform with such revised or modified water quality standards within 6 months of the effective date of any revision or modification of water quality standards, or as directed by an implementation plan contained in such revised or modified standards, or within such longer period of time as the District Engineer, in consultation with the Regional Administrator of the Environmental Protection Agency, may determine to be reasonable under the circumstances. d. That the discharge will not destroy a threatened or endangered species as identified under the Endangered Species Act, or endanger the critical habitat of such species. e. That the permittee agrees to make every reasonable effort to prosecute the construction or operation of the work authorized herein in a manner so as to minimize any adverse impact on fish, wildlife, and natural environmental values. f. That the permittee agrees that he will prosecute the construction or work authorized herein in a manner so as to minimize Sy degradation of water quality. g. That the permittee shall allovr the District Engineer or his authorized representative(s) or designee(s) to make periodic in- spections at any time deemed necessary in order W assure that the activity being performed under authority of this permit is in accordance with the terms and conditions prescribed herein. tr. That the permittee shall maintain the structure or work authorized herein in good condition and in reasonable ac- cordance with the plans and drawings attached hereto. i. That this permit does not convey any property rights, either in real estate or material, or any exclusive privileges; and that it does not authorize any injury to property or invasion of rights or any infringement of Federal, State, or local laws or regulations. j. That this permit does not obviate the requirement to obtain state or local assent required by law for the activity authoriz- ed herein. k. That this permit may be either modified, suspended or revoked in whole or in part pursuant to the policies and pro- cedures of 33 CFR 325.7. I. That in issuing this permit, the Government has relied on the information and data which the permittee has provided in connection with his permit application. If, subsequent to the issuance of this permit, such information and data prove to be materially false, materially incomplete or inaccurate, this permit may be modified, suspended or revoked, in whole or in part, and/or the Government may, in addition, institute appropriate legal proceedings. m. • That any modification, suspension, or revocation of this permit shall not be the basis for any claim for damages against the United States. n. That the permittee shall notify the District Engineer at what time the activity authorized herein will be commenced, as fax in advance of the time of commencement as the District Engineer may specify, and of any suspension of work, if for a period of more than one week, resumption of work and its completion. o. That if the activity authorized herein is not completed on or before 31st day of DEC 19 RR (three years from the date of issuance of this permit unless otherwise specified) this permit, if not previously revoked or specifically extended. shall automatically expire. p. That this permit does not authorize or approve the construction of particular structures, the authorization or approval of which may require authorization by the Congress or other agencies of the Federal Government. q. That if and when the permittee desires to abandon the activity authorized herein, unless such abandonment is part of a transfer procedure by which the permittee is transferring his interests herein to a third party pursuant to General Condition t hereof, he must restore the area to a condition satisfactory to the District Engineer. r. That if the recording of this permit is possible under applicable State or local law, the permittee shall take such action aa may be necessary W record this permit with the Register of Deeds or other appropriate official charged with the responsibility for maintaining records of tide 10 and interests in real property.