HomeMy WebLinkAbout19-86 RESOLUTIONRESOLUTION ND. 19-86
A RESOIITTION AUTHORIZING THE MAYOR AND CITY (T,FRK
TO EXECUTE A CONTRACT WITH KEN SMITH d/b/a OZARK
MOUNTAIN AIR FOR THE MAINTENANCE OF HEATING AND
AIR CONDITIONING EQUIPMENT IN THE CITY ADMINISTRATION
BUILDING.
BE IT RESOLVED BY TBE BOARD OF DIRECTORS OF THE CITY OF FAYEPIEVILLE,
ARKANSAS:
That the Mayor and City Clerk are hereby authorized and directed
to execute a contract with Ken Smith d/b/a Ozark Mountain Air for
the maintenance of heating and air conditioning equipment in the City
Administration Building. A copy of the contract authorized for execution
hereby iS attached hereto marked Exhibit "A" and made a part hereof.
PASSED AND APPROVED this 21st day of January, , 1986.
01.14
� .';;Clerk
1f✓1
r°.
APPROVED
By • ds,
Mayor
Z
CONTRACT
MICROFILMED
This -CONTRACT executed this * W. day of 7auuary
19 Q , by and between the City of Fayetteville, Arkansas, hereinafter
called the "City" and Ken Smith d/b/a Ozark Mountain Air, having its
principal place of business in West Fork, Arkansas, hereinafter called
the "Contractor".
In consideration of the mutual covenants contained herein, the
City and the Contractor hereby agree as fcllows:
- 1. During the term of this contract, the Contractor shall at
all times maintain in excellent working condition the heating and
air conditioning system in the City's Administration Building located
at 113 West Mountain Street, Fayetteville, Arkansas. The Contractor
shall provide, at the Contractor's cost, all labor, materials and
parts necessary to keep the aforesaid heating and air conditioning
system continuously operating at an optimum level.
2. The term of this contract shall be for a period of five
(5) years commencing on the 5th day of February , 19 86 .
3. For labor, materials and parts furnished by the Contractor
during the first year of this contract, the City agrees to pay the
Contractor a total sum of Seven Thousand Six Hundred Thirty-two Dollars
($7,632.00). Said sum shall be payable in twelve (12) equal monthly
installments. The first monthly installment shall be payable on the
5th day of March , 19 86 , and the following installments shall
be payable on the 5th day of each succeeding month during the term
of this contract. The consideration payable to the Contractor during
each succeeding year shall be the amount resulting by adjusting the
consideration during the previous year to reflect the percentage change
(either up or down) occurring in the Consumer Price Index, U.S. Bureau
of Labor Statistics, Department of Labor, Dallas Office, through comparing
the Index of January 31 in the current year with the Index of January
31 in the previous year.
4. During the term of this contract, the Contractor shall at
all times maintain workmen's compensation insurance as required by
Arkansas law and public liability insurance providing coverage for
personal injury, death or property damage in amounts approved by the
City's Purchasing Officer. Certificates evidencing the insurance
required hereby shall be filed with the City's Purchasing Officer
within fifteen (15) days from the execution date of this contract.
5. The Contractor agrees to indemnify the City, and to hold
the City harmless, from any and all claims for personal injury, death
or property damage arising from the Contractor's negligent performance
of its obligations under this contract.
6. The City shall have the right to terminate this contract
at any time by giving the Contractor thirty (30) days written notice
of termination. In the event of such termination, the consideration
payable the Contractor shall be prorated as of the termination date.
IN WTINESS WHEREOF, this contract has been executed on the date
first above written.
en Smith :/b/a
Ozark Mountain Air
•
MODIFICATION OF CONTRACT
THIS MODIFICATION OF CONTRACT executed this / day of
5-
14e.1989 by and between the City of
Fayetteville, Arkansas, hereinafter called the "City", and Ken
Smith d/b/a Ozark Mountain Air, hereinafter the "Contractor".
WHEREAS, the City and the Contractor have executed a contract
dated January 21, 1986 pursuant to which the Contractor maintains
the heating and air conditioning system in the City's
Administration Building; and
WHEREAS, the City desires for. the Contractor to also maintain
the heating and air conditioning system in the Police Department
Building.
NOW, THEREFORE, the City and the Contractor hereby mutually
agree:
1. Paragraph 1 of the aforesaid contract, which contract is
incorporated herein by reference thereto, is hereby modified by
amending the first sentence in 11 to read as follows:
"1. During the term of this contract, the Contractor
shall at all times maintain in excellent working
condition the heating and air conditioning system in the
City's Administration Building at 113 West Mountain
Street and shall at all times maintain in excellent
working condition the heating and air conditioning
system in the City's Police Department Buildings at the
corner of Rock Street and Church Avenue.
2. The aforesaid contract is hereby modified by adding 73.1
to read as follows:
"3.1. For labor, materials and parts furnished by the
contractor in maintaining the heating and air
conditioning system in the. City's Police Department
Buildings, the City agrees to pay the contractor a total
sum of $1,600.00 per year. Said sum shall be payable in
twelve (12) equal monthly installments. The first
monthly installment shall be payable on the 5th day of
June, 1989, and the following installments shall be
payable on the 5th day of each succeeding month during
the term of this contract. The consideration payable to
the Contractor during each succeeding year shall be the
amount resulting by adjusting the consideration during
the year to reflect the percentage change (either up or
down) occurring in the Consumer Price Index, U.S. Bureau
of Labor Statistics, Department of Labor, Dallas Office,
through comparing the index of January 31 in the current
year with the index of January 31 in the previous year.
3. As modified hereby, the aforesaid contract shall continue
in full force and effect in accordance withothe terms thereof.
IN WITNESS WHEREOF, this contract has .been.executed on the
day first above written.
CITY OF FAYETTEVILL , ARKANSAS
•
KEN SMITH d/b/a
OZARK MOUNTAIN AIR
By: j/