HomeMy WebLinkAbout17-86 RESOLUTION• • RESOLUTION NO. I7-86 A RESOLUTION AUTHORIZING THE MAYOR AND CITY C'f.FRK TO EXECUTE CHANGE ORDER NO. 5 AND CHANGE ORDER NO. 7 IN THE CITY'S WASTEWATER TREATMENT PLANT CONSTRUCTION CONTRACT WITH OLSON CONSTRUCTION COMPANY. HE IT RESOLVED BY THE BOARD OF DIREXIORS OF THE QTY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute Change Order No. 5 and Change Order No. 7 in the City's Wastewater Treatment Plant construction contract with Olson Construction Company. Copies of the change orders authorized for execution hereby are attached hereto marked Exhibits "A" and "B" and made a part hereof. PASSED AND APPROVED this 21st day of January , 1986. w. CYC . a. d a .•. CONTRACT MODIFICATION (Change Order) DATE: 10/14/85 Contract Modification No.: 5 Owner: Fayetteville, Arkansas Project Name: Wastewater Treatment Plant Improvements Contractor: Olson Construction Company Project No. MG18766.A2 & .A5 The following modifications to the contract are hereby ordered: (Use additional pages if required) - Add two telephone receptacles and conduit at Administration Building (CMIR#5) $ 447.00 -Revise sump detail at Primary Influent Pump Station 1CR#26) 978.00 -Revise construction joints at Clarifiers (CR#38A) 6,586.00 - Deepen roof beam at Primary Influent Pump Station (CR#51) 901.00 - Reroute plumbing in ceiling of Administration Building (CR#62) 1,180.00 - Plumb cup sinks at fume hoods in Administration Building (CR#83) 273.00 - Move W. reservoir dike east & steepen interior slope (CMIR*8) (Credit) (18,789.00) -Add an 8" valve to strainer (CMIR#10) 789.00 - Add two control stations at Sludge Reservior (CR#52) - Change Manhole #7 to drop manhole (CR#73) 866.00 5,152.00 - Replace sludge pits with granular material along Bypass pipe - (force account) 2,888.48 This contract modification constitutes full and mutual accord and satisfaction for all time and all costs related to this change. By acceptance of this contract modification, the contractor hereby agrees that the modification represents an equitable adjustment to the contract, and further, agrees to waive all right to file any further claims or changes arising out of or as a result of this change or the accumulation of ahmogas on this Contract. Va4r - oyic4,14A c4e,1G as%rJ 04 getC1 '�'z/8b Phase I ($8,424.60) Phase II $9,695.48 TOTAL $1,271.48 Contract Amount: Contract Duration/Completion Date: Original Previous This Revised Contract Changes Change Contract $21,232,000 $155,384 $1,271.48 $21,388,655.48 Belt Filter Press Administration Bldg 365 days Phase I&II 1/1/1987 Phase III 9/1/1987 *14 Weeks *14 Weeks *From receipt of written order APPROVED: FAYETTEVILLE OLSON CONSTRUCTION CO. CH2M HILL P.O. Drawer F 3300 Rock /stand Road 2657 F ane Driv AL Fa,a teville,�/i as 72701 Irving, {/4/U Texas�//95060 Montg 8 f / BY:A/741 1 — By: 0- �J Da S `h 9.j Date: /l2 )71.v 4G Date: �,O/'/`±613 CONTRACT MODIFICATION (Change Order) DATE: 1/3/86 Contract Modification No.: 7** Owner: Project Name: Contractor: Fayetteville, Arkansas Wastewater Treatment Plant Improvements Olson Construction Company Project No. MG18766.A2 & .A5 The following modifications to the contract are hereby ordered: (Use additional pages if required) Provide temporary utility hookups (water, gas; electricity, sewer) to the Administration building to permit the Owner to occupy and use the building, and provide and maintain a temporary gravel walkway to permit the Owners personnel access, per CMIR #12, in return for a 90 -day extension of time on the Administration Building. Said time extension includes any time delay that may be granted due to weather occurring prior to October 1, 1985. Provide sump pumps and sumps for 3 scum pump stations per CMIR #4 $11,388 - Phase I Provide 14 outdoor lights around the existing plant per CMIR #4 $31,680 - Phase II This contract modification constitutes full and mutual accord and satisfaction for all time and all costs related to this change. By acceptance of this contract modification, the contractor hereby agrees that the modification represents an equitable adjustment to the contract, and further, agrees to waive all right to file any further claims or changes arising out of or as a result of this change, or the accumulation of executed contract modifications on this Contract. Contract Amount: Contract Duration/Completion Date: Belt Filter Press Administration Bldg Phase I&II Phase III Original Contract $21,232,000 365 days 1/1/1987 9/1/1987 Previous Changes $155,384** *14 Weeks This Revised Change Contract $43,068 To be determined** 90 days *From receipt of written order. Completion Date is 12/5/85. **CAI#5 for an additional $1,271.48 is pending. **CM#6 is a force account CM, the cost of which is to be determined. APPROVED: FAYETTEVILLE P.O. Drawer F Fa ville, Bev - Dat 7 OLSON CONSTRUCTION CO. 3300 Rock Island Road 01 Irving, Texas 95060 Date: fl9. )y f6 jd/MGDS/011 CH2M HILL *14 Weeks 455 days (4/1/86) 2657 Fai ane Drive Nontgo y, AL 36/}/-- By: R9tt-� Date: (06