RESOLUTION NO. I7-86
A RESOLUTION AUTHORIZING THE MAYOR AND CITY C'f.FRK
TO EXECUTE CHANGE ORDER NO. 5 AND CHANGE ORDER
NO. 7 IN THE CITY'S WASTEWATER TREATMENT PLANT
CONSTRUCTION CONTRACT WITH OLSON CONSTRUCTION
COMPANY.
HE IT RESOLVED BY THE BOARD OF DIREXIORS OF THE QTY OF FAYETTEVILLE,
ARKANSAS:
That the Mayor and City Clerk are hereby authorized and directed
to execute Change Order No. 5 and Change Order No. 7 in the City's
Wastewater Treatment Plant construction contract with Olson Construction
Company. Copies of the change orders authorized for execution hereby
are attached hereto marked Exhibits "A" and "B" and made a part hereof.
PASSED AND APPROVED this 21st day of January , 1986.
w. CYC .
a. d
a .•.
CONTRACT MODIFICATION (Change Order) DATE: 10/14/85
Contract Modification No.: 5
Owner: Fayetteville, Arkansas
Project Name: Wastewater Treatment Plant Improvements
Contractor: Olson Construction Company
Project No. MG18766.A2 & .A5
The following modifications to the contract are hereby ordered: (Use additional pages if
required)
- Add two telephone receptacles and conduit at Administration Building (CMIR#5) $ 447.00
-Revise sump detail at Primary Influent Pump Station 1CR#26) 978.00
-Revise construction joints at Clarifiers (CR#38A) 6,586.00
- Deepen roof beam at Primary Influent Pump Station (CR#51) 901.00
- Reroute plumbing in ceiling of Administration Building (CR#62) 1,180.00
- Plumb cup sinks at fume hoods in Administration Building (CR#83) 273.00
- Move W. reservoir dike east & steepen interior slope (CMIR*8) (Credit) (18,789.00)
-Add an 8" valve to strainer (CMIR#10) 789.00
- Add two control stations at Sludge Reservior (CR#52)
- Change Manhole #7 to drop manhole (CR#73)
866.00
5,152.00
- Replace sludge pits with granular material along Bypass pipe - (force account) 2,888.48
This contract modification constitutes full and mutual accord and satisfaction
for all time and all costs related to this change. By acceptance of this contract
modification, the contractor hereby agrees that the modification represents an equitable
adjustment to the contract, and further, agrees to waive all right to file any further claims
or changes arising out of or as a result of this change or the accumulation of ahmogas on this
Contract. Va4r - oyic4,14A c4e,1G as%rJ
04 getC1
'�'z/8b
Phase I
($8,424.60)
Phase II
$9,695.48
TOTAL
$1,271.48
Contract Amount:
Contract Duration/Completion Date:
Original Previous This Revised
Contract Changes Change Contract
$21,232,000 $155,384 $1,271.48 $21,388,655.48
Belt Filter Press
Administration Bldg 365 days
Phase I&II 1/1/1987
Phase III 9/1/1987
*14 Weeks *14 Weeks
*From receipt of written order
APPROVED:
FAYETTEVILLE OLSON CONSTRUCTION CO. CH2M HILL
P.O. Drawer F 3300 Rock /stand Road 2657 F
ane Driv
AL
Fa,a teville,�/i as 72701 Irving,
{/4/U Texas�//95060 Montg
8 f / BY:A/741 1 — By: 0- �J
Da S `h 9.j Date: /l2 )71.v 4G Date: �,O/'/`±613
CONTRACT MODIFICATION (Change Order) DATE: 1/3/86
Contract Modification No.: 7**
Owner:
Project Name:
Contractor:
Fayetteville, Arkansas
Wastewater Treatment Plant Improvements
Olson Construction Company
Project No. MG18766.A2 & .A5
The following modifications to the contract are hereby ordered: (Use additional pages if
required)
Provide temporary utility hookups (water, gas; electricity, sewer) to the Administration
building to permit the Owner to occupy and use the building, and provide and maintain a
temporary gravel walkway to permit the Owners personnel access, per CMIR #12, in return for a
90 -day extension of time on the Administration Building. Said time extension includes any time
delay that may be granted due to weather occurring prior to October 1, 1985.
Provide sump pumps and sumps for 3 scum pump stations per CMIR #4 $11,388 - Phase I
Provide 14 outdoor lights around the existing plant per CMIR #4 $31,680 - Phase II
This contract modification constitutes full and mutual accord and satisfaction
for all time and all costs related to this change. By acceptance of this contract
modification, the contractor hereby agrees that the modification represents an equitable
adjustment to the contract, and further, agrees to waive all right to file any further claims
or changes arising out of or as a result of this change, or the accumulation of executed
contract modifications on this Contract.
Contract Amount:
Contract Duration/Completion Date:
Belt Filter Press
Administration Bldg
Phase I&II
Phase III
Original
Contract
$21,232,000
365 days
1/1/1987
9/1/1987
Previous
Changes
$155,384**
*14 Weeks
This Revised
Change Contract
$43,068 To be
determined**
90 days
*From receipt of written order. Completion Date is 12/5/85.
**CAI#5 for an additional $1,271.48 is pending.
**CM#6 is a force account CM, the cost of which is to be determined.
APPROVED:
FAYETTEVILLE
P.O. Drawer F
Fa ville,
Bev -
Dat
7
OLSON CONSTRUCTION CO.
3300 Rock Island Road
01 Irving, Texas 95060
Date: fl9. )y f6
jd/MGDS/011
CH2M HILL
*14 Weeks
455 days
(4/1/86)
2657 Fai ane Drive
Nontgo y, AL 36/}/--
By: R9tt-�
Date: (06