Loading...
HomeMy WebLinkAbout105A-86 RESOLUTION• RESOLUTION NO, 105A-86 A RESOIBTION AUTHORIZING THE MAYOR AND CITY NUMBER ONE TO TASK ORDER NUMBER EIGHT IN THE PLANT ENGIN ; CC TRACE WITH CH2M HILL IN SCOPE OF EQUIPMENT REHABILITATION SARK. • CLERK TO EXECUTE N1flI IT CITY'S WASIW ATSR TRENIMilTT SOUIHF.AST, INC. TO EXPAND BE IT RESOLVED by the Board of directors of the City of Fayetteville, Arkansas; Section 1. That the Mayor and City Clerk are hereby authorized and directed to execute Amendment No. 1 to Task Order No. 8 in the City's Wastewater Treatment Plant Engineering Contract with CH2M Hill Southeast, Inc. to expand the scope of equipment rehabilitation work. A copy of the amendment authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 210 day of Octobei , 1986. • TASK ORDER NO. 8 AMENDMENT 1 EXISTING PLANT EQUIPMENT REHABILITATION DESIGN AND SERVICES DURING CONSTRUCTION This Amendment No. 1 amends Task Order No. 8 executed between CH2M Hill Southeast, Inc. (Engineer) and the City of Fayetteville, Arkansas (Owner) on April 21, 1986. Article 1 The amended scope of work is to include preparation of design plans and specifications for bidding rehabilitation or replacement, as appropriate, of the existing non -potable water system; pump #28 (future digested sludge transfer pump) and valves; the slide gates in the diversion box on the east side of lift station #2; the plant and storm sump pumps and controls; removal of old coil filter filtrate pumps; demolition of the filtrate pump and coil filter vacuum pump concrete mounting pads; the grit pumps, motors and controls; baffle plates downstream of bar screens; rodding and cleaning of suction and discharge pipeline from pump #11 and #12, #13 and #14; demolish the scum holding tank; the 2 six-inch valves in the drain lines for the #1 and #2 gravity thickeners; the six-inch valve in line #38 supplying activated sludge to the #1 diversion box; the six-inch valve in line #85 which supplys activated sludge to the #1 Lift Station; the eight -inch valve in Line *24 from the #1 Lift Station which can supply primary influent to air eductors and/or DAF units; the 16 -inch valve in Line #61 which allows choice between primary influent and process water to DAF's and pumps #5 and #6; the four personnel doors and frames for the bar screen room; the four outside personnel doors; the roll -up door with personnel door for the north bay opening on the east side of the lower level; two 7' x 16' metal frame windows on the east wall located above the sludge holding tank; replacement of several broken panes of glass in the existing windows together with glazing; and repair work on the other doors not listed herein. Article 2 As consideration for performing the additional services enumerated in Article 1 above the total amended cost shall be increased by $3,600 to a cost not to exceed $69,195 unless authorized by the City in writing. MGDS/040 1 13.06 1 Article 4 In witness whereof, the parties hereto each herewith subscribe the same in triplicate: FOR BY: ITY AYEVI LE, ARKANSAS FOR CH2M BY: HILL SOUTHEAST, INC. Ay ween Title DATED: AY OF e �a-r�-cc ^ 1986 MGDS/040