HomeMy WebLinkAbout105A-86 RESOLUTION•
RESOLUTION NO, 105A-86
A RESOIBTION AUTHORIZING THE MAYOR AND CITY
NUMBER ONE TO TASK ORDER NUMBER EIGHT IN THE
PLANT ENGIN ; CC TRACE WITH CH2M HILL
IN SCOPE OF EQUIPMENT REHABILITATION SARK.
•
CLERK TO EXECUTE N1flI IT
CITY'S WASIW ATSR TRENIMilTT
SOUIHF.AST, INC. TO EXPAND
BE IT RESOLVED by the Board of directors of the City of Fayetteville,
Arkansas;
Section 1. That the Mayor and City Clerk are hereby authorized
and directed to execute Amendment No. 1 to Task Order No. 8 in the
City's Wastewater Treatment Plant Engineering Contract with CH2M Hill
Southeast, Inc. to expand the scope of equipment rehabilitation work.
A copy of the amendment authorized for execution hereby is attached
hereto marked Exhibit "A" and made a part hereof.
PASSED AND APPROVED this 210 day of Octobei , 1986.
•
TASK ORDER NO. 8
AMENDMENT 1
EXISTING PLANT EQUIPMENT REHABILITATION
DESIGN AND SERVICES DURING CONSTRUCTION
This Amendment No. 1 amends Task Order No. 8 executed
between CH2M Hill Southeast, Inc. (Engineer) and the City of
Fayetteville, Arkansas (Owner) on April 21, 1986.
Article 1
The amended scope of work is to include preparation of
design plans and specifications for bidding rehabilitation
or replacement, as appropriate, of the existing non -potable
water system; pump #28 (future digested sludge transfer
pump) and valves; the slide gates in the diversion box on
the east side of lift station #2; the plant and storm sump
pumps and controls; removal of old coil filter filtrate
pumps; demolition of the filtrate pump and coil filter
vacuum pump concrete mounting pads; the grit pumps, motors
and controls; baffle plates downstream of bar screens;
rodding and cleaning of suction and discharge pipeline from
pump #11 and #12, #13 and #14; demolish the scum holding
tank; the 2 six-inch valves in the drain lines for the #1
and #2 gravity thickeners; the six-inch valve in line #38
supplying activated sludge to the #1 diversion box; the
six-inch valve in line #85 which supplys activated sludge to
the #1 Lift Station; the eight -inch valve in Line *24
from the #1 Lift Station which can supply primary influent
to air eductors and/or DAF units; the 16 -inch valve in Line
#61 which allows choice between primary influent and process
water to DAF's and pumps #5 and #6; the four personnel doors
and frames for the bar screen room; the four outside
personnel doors; the roll -up door with personnel door for
the north bay opening on the east side of the lower level;
two 7' x 16' metal frame windows on the east wall located
above the sludge holding tank; replacement of several broken
panes of glass in the existing windows together with
glazing; and repair work on the other doors not listed
herein.
Article 2
As consideration for performing the additional services
enumerated in Article 1 above the total amended cost shall
be increased by $3,600 to a cost not to exceed $69,195
unless authorized by the City in writing.
MGDS/040
1
13.06 1
Article 4
In witness whereof, the parties hereto each herewith
subscribe the same in triplicate:
FOR
BY:
ITY AYEVI LE, ARKANSAS
FOR CH2M
BY:
HILL SOUTHEAST, INC.
Ay ween
Title
DATED:
AY OF
e
�a-r�-cc ^
1986
MGDS/040