HomeMy WebLinkAbout79-85 RESOLUTIONRESOLUTION NO. 79-85 SCANNED A RESOLUTION AUTHORIZING AND DIRECTING THE MAYOR AND CITY CITRIC TO EXECUTE AN AMENDMENT 'TO THE CITY'S ENGINEERING CONTRACT WITH MCrI FLLAND CONSUITIINE ENGINEERS, INC. FOR THE CONSTRUCTION OF A TAXIWAY EXTENSION AT THE FAYETTEVILLE MUNICIPAL .AIRPORT TO PROVIDE FOR ELECTRICAL CONTROLS OF THE TAXIWAY LIGHTING SYSTEM AND TO PROVIDE FOR FULL-TIME RESIDENT CONSTRUCTION OBSERVATION. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYErTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute an amendment to the City's engineering contract with McClelland Consulting Engineers, Inc. for the construction of a taxiway extension at the Fayetteville Municipal Airport. A copy of the amendment authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this loth day of July • .., 1424 .w M.4 . "ATTEST APPROVED BYG? Mayor 1985. AMENDMENT N0. 1 to AGREEMENT FOR ENGINEERING SERVICES The LETTER AGREEMENT dated January 15, 1984, between the City of Fayetteville (Owner) and McClelland Consulting Engineers, Inc (Engineer) is amended hereinafter for the purposes of 1. Correcting a captioned date which is in error on the first three pages of the letter. 2. Complying with requirements of the Federal Aviation Administration (FAA) regarding: A. The need for "full time resident" construction observation as opposed to general periodic observation. B. The inclusion of Title VI Assurances by the Engineer. C. The need for the Engineer to provide a set of "As -Built" drawings of the project at the conclusion of construction. D. The need for the Airport Layout Plan (ALP) to be updated in conjunction with this project. , 3. Increasing the scope of engineering services proposed to include modifications to the electrical controls for the taxiway and runway lighting, systems and the addition of an electrical manhole and duct extension to accommodate future hangar expansion on the east side of the airport. 4. Agreeing to notify the City in writing and to obtain City approval prior to exceeding the "estimated" fee of $2,500 for construction materials testing. Specifically, these revisions to the AGREEMENT are to be effected by the following changes: Pages 1-3, LETTER OF AGREEMENT The date appearing at the top of each page is to be revised, accurately stating the year as "1985" - not "1984". Page 3, Paragraph 1.6.2., GENERAL PROVISIONS Delete the first two sentences of this paragraph and replace them with the following sentence: "Provide full-time resident construction observation to determine, in general, if the project is proceeding in accordance with the Contract Documents." In the last sentence of said paragraph, delete the opening four words, beginning the last sentence with: "On the basis....". Page 5, GENERAL PROVISIONS Following paragraph 1.6.7., add a new paragraph as follows: Provide a set of As -Built drawings at the conclusion of the including an updated Airport Layout Plan (ALP)." "1.6.8. project, Page 10, Paragraph 5.9, ACKNOWLEDGEMENTS, GENERAL PROVISIONS Add a fourth paragraph, as follows: "The ENGINEER hereby states that he will comply with the requirements stated in the Title VI Assurances, Appendix 2, of AC 150/5100-4". Page A-3, FURTHER DESCRIPTION OF BASIC ENGINEERING SERVICES AND RELATED MATTERS At the request of and with assistance from the City staff, an amended work scope has been developed to provide design of a system which will allow control of runway and taxiway lighting systems to remain at the Flight Service Station (FSS) and the existing Air Traffic Control Tower (ATCT) until the new ATCT is operational. At that time the base station in the existing ATCT would be relocated to the new ATCT. • Ei Specifically, the original scope involving lighting controls is amended to include the design of the following: 1. Relocation of the two existing lighting regulators from the FSS building to the east side of the airport. Installation of these existing regulators as well as the proposed taxiway lighting regulator is to be within the south room of the east T -hangar building. This will require a horizontal bore of approximately 90 feet under the existing taxiway and apron; 2. A ground -to -ground radio control system to permit control of the lighting regulators from the FSS and the existing ATCT and in the future from the new ATCT. The base station installed in the existing ATCT would later be relocated to the new ATCT. This system would provide for temporary and permanent control of all -three lighting regulators and would be designed with future expansion capabilities. 3. The design of an electrical manhole and duct extension at the north end of an existing 4 -way duct under the taxiway near the new maintenance hangar. This is required to avoid existing cable interference with the concrete apron which has been constructed south of that new hangar. Page B-1, Paragrapha3, Compensation for Engineering Services Revise the opening sentence of paragraph 3 to read: "A basic fee not to exceed $35,745 is to be paid in accordance with the following schedule:" The increase in compensation is due to the increase in scope of engineering services required to include full-time construction observation (for a construction -period of 65 working days) and to increase the scope of taxiway lighting control design. The sum mentioned in paragraph 3.A. shall be revised from $16,000 to $16,900 to account for the increase in the scope of work to include taxiway lighting control design changes. Paragraph 3.B. shall remain unchanged. Paragraph 3.C. shall be renumbered as paragraph 3.C.1., and the sum of $7,000 shall be reduced to read "$2,311" Just below paragraph 3.C.1., add paragraph 3.C.2., as follows: "A full-time construction observer will be provided by the Engineer at an hourly charge of $27.95, for the actual time that he is engaged on the project; but the total amount charged for the full-time construction observer shall not exceed $14,534 unless actual construction time exceeds 65 working days. 40 at Page B-2, Paragraph 3.D. Regarding compensation for construction materials testing, the following statement shall be added at the end of paragraph 3.D.: "The Engineer will notify the Owner in writing prior to exceeding a fee of $2,500 for construction materials testing.". Except as specifically provided for herein, all other provisions of the referenced AGREEMENT, dated January 15, 1984, shall remain in full force. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this AGREEMENT in duplicate on the date heretofore stated. (SEAL) ATTEST: By Type Name SUZANNE KENNEDY Title City Clerk Date 7-29-85 (SEAL) ATTEST: OWNER: Type Name PAUL R. NOLAND Title Mayor Date 7-29-85 ENGINEER: McCLELLAND CONSULTING ENGINEERS, INC. BY AlCLtouc L. a e- dediet4B �� Type Name MAURICE A. McCLELLAND ype Name J. E. McCLELLAND Title Secretary/Treasurer Title President Date Date • AIRPORT Drake Field FEDERAL AVIATION ADMINISTRATION Engineering Contract Cost Estimate CITY Fayetteville Project No.AIP-3-0S-0020-05-85 Name of Organization submitting estimate McClelland Consulting Engineers, Inc. PROJECT DESCRIPTION Aircraft Taxiway Extensions 8 Lighting Improvements Indicate major items of work at top of column such ass Paving/Runway-Taxiway-Apron; Electrical/Runway-Taxiway-Ramp; Beacon, VASI; Fence; Airport Layout Plan (if new); Zoning Map (if required); Resident Inspection (if applicable) DIRECT SALARY COST Engineers Designers Draftsmen Surveyors Supervision • Others:(Specify) Clerical Construction Observer Subtotal Taxiway Ext. Design Lighting Imp. Design Construction Mgmt. MAN HOURS COST MAN HOURS COST MAN HOURS 153 $ 2,760.00 40 $ 794.00 26 COST 482.00 8 82.00 165 1,700.00 40 414.00 6 12 300.00 4 100.00 4 24 600.00 4 100.00 4 16 120.00 4 30.00 15 .526 $ 5,562.00 ,$ 1,438.00 1 59.00 41.00 100.00 113.00 5,444.00 $ 6,239.00 PAYROLL ADDITIVE (Vacation, sick leave, retire- ment, FICA, etc.) DIRECT NON -PAYROLL COSTS Materials & supplies Reproduction Data processing Travel expenses Equipment rental Outside engr. consultants Others: (Specify) Mtls. Testing @ Unit Prices Subtotal - All Direct Costs INDIRECT COSTS (Administration, rent, utilities, telephone, etc. Subtotal -Direct & Indirect PROFESSIONAL FEE (Profit) TOTAL IMUMBIMMOD.FEE Prepared by PERCENT 40 2.225.00 $ 575.00 2,496.00 150.00 50,00 50.00 7,937.00 2,063.00 7 S00 00 11,285.00 5,283.00 1,365.00 5,798.00 13,220.00 $ 3,428.00 $ 1,807.00 $ 460.00 17,083.00 2,247.00 15,027.00 3,888.00 Ls 19,330.00 (Signature) Date: May 29, 1985