Loading...
HomeMy WebLinkAbout71-85 RESOLUTION3 RESOLUTION NO. 71-85 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO. 4 IN THE CITY'S WASTEWATER TREATMENT PLANT CONTRACT WITH OLSEN CONSTRUCTION COMPANY TO PROVIDE FOR INSTALLATION OF A PERMANENT BELT PRESS. BE IT RESOLVED BY THE BOARD OF DIRECIDRS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute Change Order No. 4 in the City's Wastewater Treatment Plant Contract with Olsen Construction Company to provide for installation of a permanent belt press at a cost of $286,200.00. A copy of the Change Order authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 16th day of ATTEST July , 1985. J Exhibit "A" CONTRACT MODIFICATION (Change Order) DATE: 7/2/85 Contract Modification No.: 4 Owner: Fayetteville, Arkansas Project Name: Wastewater Treatment Plant Improvements Project No. MG18766.A2 Contractor: Olson Construction Company The following modifications to the contract are hereby ordered: (Use additional pages if required) Add a Jones Belt Filter Press with new conveyor belt in conformance with the plans and specifications contained in the request for proposals dated April 1985 as modified by the proposal from Olson Construction Company dated July 1, 1985. This contract modification constitutes full and mutual accord and satisfaction for all time and all costs related to this change. By acceptance of this contract modification, the contractor hereby agrees that the modification represents an equitable adjustment to the contract, and further, agrees to waive all right to file any further claims or changes arising out of or as a result of this change, or the accumulation of changes on this Contract. Contract Amount: Contract Duration/Completion Date: Belt Filter Press Administration Bldg Phase I&II Phase III *From receipt of written order APPROVED: FAYETTEVILLE P.O. Drawer F Fayetteville, n Arkansas 72701 By: A�tY9s4t/tc4..a*-' By: 7-4014 Original Previous Contract Changes $21,232,000 ($130,816) 365 days 1/1/1987 9/1/1987 OLSON CONSTRUCTION CO. 3300 Rock Isl Irving, T Date: jd/MGDS/011 Road 95D6O This Revised Change Contract $286,200 $21,387,384 *14 Weeks *14 Weeks CH2M HILL 2657 Fai lane Drive 7 Montgo , AL 3 ,116 By: .e,,It's `b li,G.jtit Date: -47169/91- Date: EXHIBIT A • • MICROFILMED 7/ -FS TASK ORDER NO. 4, AMENDMENT 1 INTERIUM SLUDGE ENGINEERING SERVICES This Amendment No. 1 amends Task Order No. 4 executed between CH2M HILL Southeast, Inc. "ENGINEER", and the City of Fayetteville, Arkansas (OWNER), on the 19th day of February, 1985. Article 1 The scope of work for Task No. 2 is hereby amended to include engineering services for: o Addition and design of two Owner -furnished polymer feed systems and two Contractor -furnished polymer feed systems o Demolition of the westerly lime slurry tank, and repair of the hole left in the floor o Relocation of the existing polymer storage tank and the redesign of the polymer feed system to the vicinity of the new belt filter press installation o Move the stairway on the Jones belt filter press alternative o Make necessary piping revisions Article 2 As consideration for providing the services enumerated in Article 1 as amended, the cost ceiling shall be increased to $55,900. Article 3 (Not Changed) 1 • • • • Article 4 IN WITNESS WHEREOF, the parties hereto each herewith subscribe the same in triplicate. FOR SAYE TEVZLLE,,eARKANSAS 44 Dated this 3 _daY of (Tit FOR CH2M HILL SOUTHEAST, INC. By: ATTEST:j70„:gr) (4)et) • 1985 (Title)