Loading...
HomeMy WebLinkAbout63-84 RESOLUTION7v1- 141 RESOLUTION NO. 63-84 A RESOLUTION APPROVING CHANGE ORDERS FOR COMMUNITY DEVELOPMENT PROJECTS FOR IMPROVEMENTS TO EAGLE STREET, OAKLAND AND BERRY STREETS, AND THE HEADSTART FACILITY. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Board of Directors hereby approves the change orders attached hereto, marked Exhibits "A", "B";,"C", and "D" and made a part hereof. PASSED AND APPROVED this 1'5 day of rr • FATTEST: ? v Bea y Clerk APPROVED: By:19)&1 Mayor May , 1984. • • • • • • • • • • 5.02 U. S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CONTRACT CHANGE ORDER rd NO, "Street & Drainage Improvements" for the City of' Fayetteville eorder No. 2 (pg. 2 of 4) • • Date Dec. "5, 1983. Project No. 3T-82-09 LocationOakland, Berry (Eagle • HUD -4201 (7'49) (Contractor) McClinton -Anchor Co.Div. of APAC - Arkansas, Inc. re hereby requested to comply with the following changes from the contract plans and specifications: TEM NO. (1) DESCRIPTION OF CHANCES—QUANTITIES. UNITS, • UNIT PRICES, CHANGE IN CO APL.ETION SCHEDULE, ETC, (7) DECREASE IN CONTRACT PRICE (3) INCREASE IN CONTRACT PRICE (4) le:. Item #1 Item # • Item#3 c Item#4' • Construct i " thick asphaltic overlay @ Lindell; 194 S.Y. @ $3.00/S.Y. Construct reinforced concrete retaining wall from Sta. 0+22 to Sta. 0+75 Right, per at- tached detail, "@ $16.00/S.F.,. 200 S.F. of surface area. Add 10' Drop Inlet extension throat t� Std. Drop Inlet @ Sta. 12+70 Left, $500.00 Lump Sum... - -Add 6" thick, 18" wide concrete pavement on each side of' slotted drain for support @ St' Change in contract piice due to this Change Order:S.A. Total -decrease Total Increase _. Difference -between Col. -(3) -and (4): - Net (increaseXdavdiliii contract price rrm . 3+33, @$1.50/S.F , 100 S.F. 5 $ $ 582.00 3200.00 • 500.00 r,< $ 150.00 S$4432.00 s 0.00 S$4432.0O um of S 4432.00 Is hereby added to. dreatitXBdlt'acrx, the total contract price, and the adjusted contract price to date thereby is s 102,616.23 (Eagle Only) me provided for completion in the contract is unchanged, iscxassecIpainorissecti, by 0 calendar This document,41i 11 becojne en ameMdment to the contract and all provisions -of the contract will apply hereto. ted by: ,mc�TEdbed by: red by: • Nchl,i„eafidei Lni Wc, • • • t, it 5.03 1. Project No. STS --$2-09 Contract No. Chinge Order ,No. 2 (pg. 3 of 4) • REQUEST AND JUSTIFICATION FOR CHANGE 11rccssity for change: Oakland: ' New Item: Existing chain-link fence i$ from 4' to 10'_ inside street • Right -of -Way; resulting in problems.for soil stabilization and backfill. Berry: Item 12.C.: Due to unstable soil conditions, a retaining wall will be necessary to obtain proper backsloping the alleviate Severe erosion problems. New Item: To obtain proper continuity of asphalt surfaces, an overlay will be'necessary. - 2. Is proposed change an alternate bid? • • Yes W No 3. Will proposed change alter the size of the project? ' • Yea If yes, explain. • • • t.Sfect of this change on other prime contractors: NONE • 5. Has consent of surety been obtained? • • • Yes Q Not necessary 6. Will this change affect expiration or extent of insurance coverage? 11 Yea ' If yes, still the policies be extended? .. 0 Yes . ,Q No 7. Effect on operation and maintenance costs: • None • • ' .• ▪ . �•. •• • • • v7 • • • • • • • 1. . . .• - . , • • • O 0 • MUD-a•.L. D.C. • • • • 0. • • • (It r.. 344) 1f ` i Is • •• • • • • • • • • • 5.04 U. S. DEPARTMENT OF HOUSING AND URDAN DEVELOPMENT • • CONTRACT CHANGE ORDER Contract No. "Street & Drainage Improvements" for the City of Fayetteville Change Order No....2 (pg. 1 of 6) • Elute "February -28, 1984 HUD -4201 (3-69) • • Project No. • ST -82-09 Location Oakrand,` erry,Eagle To: (Contractor) McClinton -Anchor Co., Division or APAC - Arkansas, Inc. You are hereby requested to comply with the following changes from the contrnct plant and specifications: ITEM NO. (1) DESCRIPTION OF CHANGES—QUANTITIES, UNITS, • UNIT PRICES, CHANGE 1N CO:lPLETION SCHEDULE, ETC. . (2) DECREASE IN CONTRACT PRICE (3) INCREASE R7 CONTRACT PRICE (4) Oakland New Item. • Construct reinforced concrete retaining wall 1.0 foot surface height from STA 0+76 to STA 1+65 LEFT; -1.0 foot tapering to 1.5 foot surface height from STA 1+65 to STA 2+00 LEFT; 1.5 foot surface height from STA 2+00 to STA 3+25 LEFT, per at- tached detail; @ $16.00/S.F. surface area, +320 S.F. surface area. Walls to be turned . @ drives & walks to Right -of -Way. Change in contract price due to this Change Order: Total decrease . Total increase Difference between Col. (3) and (4): Net (increaseXSitdfIH5 ») contract price S 0.00 S $ $5120.00 S 5120.00 S 5120.00 $ 5120.00 le sum of 5 :5120:00 is hereby added to, &Mei = &Kik the total contract price, and the tal adjusted contract price to date thereby is S 90,077.39 (Oakland only) ,e time provided for completion in the contract is unchanged, increased, decreased, by ys. This document shaLM1ls:come an amen 5 ent to the contract and all provisions.o( the contract will apply hereto. 8:ritior. C. i,.- a :. E^ calendar cepted by: calmunt :ommended by: A'�/' Le, or • N.h� ..rte.,. • ,roved by: • 2- C-tY • • Pot ce 1. • proed No. ST -82-09 Contrail No. Change Order No. REQUEST AND JUSTIFICATION FOR CHANGE • Necessity for change: 5.05 Due to unstableT soil conditions, a retaining wall will be necessary to obtain proper back sIoping to alleviate severe erosion problems. . • • • • 2. Is proposed change an alternate bid? Yea E] No 3. Will -proposed change alter the size of the project? - If yes; explain. • 4. Effect of this change on other prime contractors: • • NONE 5. Nes consent of surety been obtained? • 11 MN Yea • • • • • • • • Yes 1t Not necessary 6. Will this change affect expiration or extent of insurance coverage? EJ Yes If yes, will the policies be extended? . Q Yee . [J No 7. Effect on operation and maintenance costs: None • .. • •'r • • • • • • • • • • • • • • • Owner • • • 4201 (Y!r) MUD-a..A. once • • • W • • ••.r. MIKt. ,•.•-.r.-.••r+• • 4 •i • • • • p No • • • GP • • • • • • • • • • • • .. • �• • (Rim. 3•44) t. r: •r •, • - .•_r_, ••A • • 5.06 Project; Headstart HS 8202 ye • Item A 2 -:12"'z 24' stl. culverts and gravel. for drainage at driveway. 15Oyd gravel at $7.50 = $1125 48' x $11/ft = 528, $1653 Item B Office partition change for privacy Item C Mop sink, hose bib and carrier mount handicapped sink TOTAL CO ##1 Architect Contractor Owner • • • • $1653 $ 975 $ 350 $ 2978 9-i5, 53, Acte) a1%f"Q/'pJ July .FA!/ • • • 1983 • 5.07 • PROJECT: HEADSTART HS 8202 Change Order #5 • SEP 2 01983 eLii, ulna Cost Asphalt paving, 181 wide access $13,350 road & parking (1}" base & 2" asphalt) Includes backfill, clean up, strap ing and bumper blocks. TOTAL C. O. #5Th ARCHITECT $13,350 CONTRACTOR / OWNER::. •ThiOn1Zl : / 42;e 4Z-f."l / September /Z 1983