HomeMy WebLinkAbout5-84 RESOLUTION•
•
RESOLUTION NO. 5'- 84
1
A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO
EXECUTE AN AMENDMENT TO TASK ORDER NO. 1 DATED JULY 20,
1983, UNDER THE CITY'S CONTRACT WITH CH2M HILL SOUTHEAST,
INC. FOR THE DESIGN AND CONSTRUCTION SUPERVISION OF
IMPROVEMENTS TO THE CITY'S WASTEWATER TREATMENT PLANT
TO DELETE VALUE ENGINEERING FROM THE WORK SCOPE AND
TO AMEND THE WORK SCOPE AND COMPENSATION FOR SERVICES
REQUIRED.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
That the Mayor and City Clerk are hereby authorized and
directed to execute Amendment No. 1 to Task Order No. 1 dated
July 20, 1983, under the City's contract with CH2M Hill
Southeast, Inc. for design and construction supervision of
improvements to the City's wastewater treatment plant. A
copy of said Amendment No. 1• is attached hereto, marked
Exhibit "A", and made a part hereof.
PASSED AND APPROVED this 17th day of January, 1984.
ATTEST:
-
r
.44
APPROVED:
By : 0)c 9, 2
Mayor
ti
AMENDMENT NUMBER 1 TO
TASK ORDER NUMBER 1 DATED JULY 20, 1983
This amendment modifies Articles 1, 2 and 5 of Task Order
Number 1 to delete value engineering from the work scope and
to establish work scope and compensation for services now
required but not currently described in Task Order Number 1.
Article 1
In order to meet EPA and ADPC&E desire for a separate
engineering firm to perform value engineering, the Engineer
has worked with the Owner to accomplish this objective.
Therefore, value engineering services are removed from the
scope of services described in Task Order Number 1.
In addition, services not currently included in the scope of
services described in Task Order Number 1 have been re-
quired. These services are more fully described in a letter
dated December 23, 1983, from the Engineer but include
services in the following areas:
o Sludge Management System
o Cooperative and Effluent Irrigation
o City Protest of ADPC&E Funding Decision
o Water Quality Standard Revision
o Value Engineering
o Existing Buried Lime Sludge
The services have been provided beginning in September 1983
and should be completed by June 1984.
Article 2
The compensation described in Task Order Number 1 shall not
be reduced as a result of the deletion of value engineering
from the work scope described in Article 1.
The compensation for services described in Article 2 of this
Amendment will be on the basis of payroll cost plus 125%
plus direct project expenses not to exceed a total cost to
the Owner of $26,000.
A
Article 5
IN WITNESS
scribe the
•
WHEREOF, the parties hereto
same in triplicate.
idM
By: ��771A
(Name)
Att
Attest:
ETT
each herewith sub-
VILLE, ARKANSAS
FOR CH2M HILL SOUTHEAST, INC.
(Title)
By:
(
Dated this 13th day of
jd/CGT/033
January, 1984
•
AAif;RO�ILN1f.�
AMENDMENT NUMBER 1 TO
TASK ORDER NUMBER 1 DATED JULY 20, 1983
•
vJ5 G 0I Li
This amendment modifies Articles 1, 2 and 5 of Task Order
Number1 to delete value engineering from the work scope and
to establish work scope and compensation for services now
required but not currently described in Task Order Number 1.
Article 1
In order to meet EPA and ADPC&E desire for a separate
engineering firm to perform value engineering, the Engineer
has worked with the Owner to accomplish this objective.
Therefore, value engineering services are removed from the
scope of services described in Task Order Number 1.
In addition, services not currently included in the scope of
services described in Task Order Number 1 have been re-
quired. These services are more fully described in a letter
dated December 23, 1983, from the Engineer but include
services in the following areas:
o Sludge Management System
o Cooperative and Effluent Irrigation
o City Protest of ADPC&E Funding Decision
o Water Quality Standard Revision
o Value Engineering
o Existing Buried Lime Sludge
The services have been provided beginning in September 1983
and should be completed by June 1984.
Article 2
The compensation described in Task Order Number 1 shall not
be reduced as a result of the deletion of value engineering
from the work scope described in Article 1.
The compensation for services described in Article 2 of this
Amendment will be on the basis of payroll cost plus 125%
plus direct project expenses not to exceed a total cost to
the Owner of $26,000.
Article 5
IN WITNESS WHEREOF, the parties hereto each herewith sub-
scribe the same in triplicate.
FOR CI A ETT VILLE, ARKANSAS
7
By:
(Name)
T
FOR CH2M HILL SOUTHEAST, INC. p ,
(�i'afhe I�Gu,
(Title)
By:
Dated this 13th day of January, 1984
jd/CGT/033