HomeMy WebLinkAbout53-83 RESOLUTION-
RESOLUTION NO. a _3
A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLEkir_TO.
EXECUTE AN AMENDMENT TO THE CITY'S JUNE 17, 1980
CONTRACT WITH BLACK & VEACH, CONSULTING ENGINEERS,
_
FOR A WASTE WATER RATE STUDY TO AUTHORIZE AN INCREASE
IN THE COMPENSATION TO BE PAID THE ENGINEERS.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
That the Mayor and City Clerk are hereby authorized and
directed to execute an amendment to the City's June 17, 1980
contract with Black & Veach Consulting Engineers for a waste
water rate study to authorize an- increase in the compensation
to be paid the engineers. A copy of the amendment authorized
for execution hereby is attached hereto, marked Exhibit "A",
and made a part hereof.
PASSED AND APPROVED this /M day of
w...ti••••r
,A“m: 0:r. • -tle,
V PA
i ; 14:44(70 t
%
4 •
A 4)4.!
C °ON'cl
1
BY aeLteet
City Clerk
APPROVED:
/9/44).e./L. , 1983.
By Oue,b %#d/
Mayor
X.. ••••40:: tr •
• • •
•
• ' • •
•••••aomm. : masa
April 19, 1983
•st.:—•••r_ ••••4
••• • •• • a
• ••••
C : •
• .
• a•la
mi "I
I... ml• • sag .
"• .1 • ! ••••
•- •••l!7"" 1'Vi1;+.7:-"al• •
•
ifi/fa-& et -45— pager
/0:30
1SEWER RATES: An ordinance raising monthly sewer rates.
An increase in sewer rates was first considered by the Board
on February 15, but the one now before the Directors --and
recommended by the Water 8 Sewer Committee --is in a lesser
amount, that is applied equally to all classes of customers
according to monthly volume. The effect of the increase
illustrated below:
Monthly
volume
2,000 gallons
5,000
8,000
15,000
30,000
50,000
300,000
500,000
1000,000
4,000,000
40,000,000
Present
rate
Proposed Percentage
rate
$ 3.98 $ 4.71
8.30 9.75f
12.62 14.79
19.95 23.20
33.30 38.35
51.10 58.55
273.60 311.05
383.60 513,05
658.60 1,018.05
2,308.60 4,048.05
22,108.60 40,408.05
increase /la
18.3%
17.5
172
16.3
15.2
14,6
13.7
33,7
54.6
75.3
82.8
-148
Zor
f; deer')
-titcoce
tve-
lo
Cpti•Cei
err
2CONTRACT AMENDMENT: A resolution authorizing a 330,000 amendment to a sewer
rate engineering contract with Black 13. Veatch Consulting Engineers, for :ditional
work in connection with the computation of sewer rates. A 4,5,
• 44 A pp 6e -o
•
HOUSING BONDS: A request by Director Sharp that the Board reconsicht a request
by the Public Facilities Board for authorization to issue up to S4,000,000 irs revenue
bonds to finance the construction of a 96 -unit multi -family housing project.
//7L�
Under the terms of' this proposal, the bond proceeds would be r •
loaned to N & R Properties (Clemen Neff and Sam Rogers) witheat
the two being required to make payments sufficient to pay debt
service on the bonds. The housing project would be built west per
P-Soefeen
of the Ramada Inn.
Considered by the Board at the April 5 meeting, the request was
voted down,•by a 5-0-1 vote, with Director Osborne in the
minority and Director Bumpass absent- Legal counsel for •
Messrs.. Neff and Rogers was unavoidably detained in Little Rock
that 4ev e n and was not present. at the Board meeting..
. .
Under'lhe CitV Board's. "Rules of.:Orditet,arid.Procedure" :tiny gy,L1:4.11,
Ciirectorlvating with the majority on an issue May request that,
it be brought up for, reconsideration at the next meeting.
Director. Sharp is making such a request,
•
•
E.
Ili . 'I Ey ill • • •• , •• •
. • • ' li.1""jgt 4n•m.;
' •• •c1• r•••a' .
i •
'4.1rms.d.'" -'' 121' r ; '' m •.4 11 S. •T ••.1 am•iii . i 4 .•. ...61.. . .. _.I -I!I .r!i1..;ha..:•••••••••1wesom esmi..• .a
.,1s -
--a...sI. 1 1 .. .- -„._,„4.
,2-ir:
2.61 ...1. 0.7 as • I •••••••::
•. •••• ••• •••••‘, i• El
• • WO
I Oen • Ill •• m •
i • • •
i
I I • • ••
rathrrannait,sakitaact
P.O. DRAWER F
(DEPARTMENT OF FINANCE
MEMORANDUM
7E7172
1E015 6214700
• TO: Fayetteville City Board of Directors; Don Grimes, City Manager
FROM: Scott C. Linebaugh, Finance Director,. )//:>7
SUBJECT: CONTRACT MODIFICATION IN THE AMOUNT OF $30,000 FOR BLACK
& VEATCH' RATE STUDY
DATE: April 13, 1983
As you are aware the City Board and Staff have requested considerable
extra work from our rate consultants, Black & Veatch. This work has been
in addition to the work defined in the original contract and is covered
under Section II -C. Additional services (attached). The additional work'
performed to date consitts of changing from the original rates projected
for the 201 Facilities Plan to three alternatives from the 201 Facilities
Plan, to two alternatives from the CH2M Hill Plan. Also we have added
many additional meetings. The additional work estimated in the future
consists of the work-up of the interim rate increase and the work-up of the
new CH2M Hill revised Facilities Plan, with sales tax included.
The charges for the work performed to date total $19,900, and the
charge for the work anticipated (interim rates and revised Facilities an)
totals $8,050. They are requesting a contract amendment of 530,000.
SCL/oak
h.
•%
I •• e•
• 1
• 4 .1
•• •2 .. . . - - .
.... eg.
. .". ... . g•
• • 1:. -• ... •
.1
•- .- .„ .
•m•0•&•"•=.1.••:".••••=•••=.1:6•Ne.riiime•••••=
•
•xtat••
g - -w • • • —1'2,2 1' •• Ira • •
•• J1.•• •••• 2 11. ;.1,1
• 14 t • •• 1.55• %• 41.• a
% r.m.•• 17• '. my. •
al• - • - eawasmikel eatallweawma
BLACK & VEATCH
CONSULTING ENGINEERS
Mi. Scott Linebaugh
Finance Director:-;
0. Drawei.
Fayetteville,:Arkansas
,
2.02
.51;6.2..
'raw.; -wr.
• L-wmlyiwi AAA,
g• .•, . FS.; ra
I pi; •• 114111Lo• • Mullion. 1 a...
To. (91-1 )67.2000
TELEX 4; 6263
1500 MEADOW I. %KC PARKWAY
WAILING •ooricsLI r O eox WOww05
KANSAS CITY. M SSOLIR1 641141
April 8, 933
▪ 6.•
..
1;2.'2
▪ 6 L.
re
.4tar Mr. tin baugh:
!As requested, we are submitting an estimate of the cost of service.; per -
'formed to date which represent work in addition to that set fortn In our
contract. We are also providing an estimate of the level of effort required
to complete the rate design based on the revised Facilities Plan,
Work Completed
Billed $12,350'
Unbilled 7,550 $19,900
Work Anticipated
Interim Rates
Revised Facilities Plan Rates
$2,250
5.800
8,050
Total $27.950
Charges for wOrk completed and billed are described in our letter of March 21,
1983. Work completed and unbilled represents an estimate of work completed
during the period February 27, 1983 through March 31, 1983, inclueing two
trips to Fayetteville by Mr. Bickel and one by myself.
Work anticipated includes estimated man-hours of effort plus allowances for
four additional trips. Anticipated trips are as follows:
1.
2
3.
4.
Trip to Fayetteville to present interim rates at Board of
Directors Meeting.
Trip to mutually agreed site to coordinate financing plan
with CH2M Hill and McClelland Consulting Engineers.
Trip to Fayetteville to present Revised
rates to the Water and Sewer Committee.
Trip to Fayetteville to present Revised
rates at Board of Directors Meeting.
Facilities Plan
Facilities Plan
•
' i
▪ ••
.4 •11”4 j • • • 3/4▪ 1 114. a•.; :;"
/ I
1 g
1.1."rmi▪ gh inrrA• IN 11
▪ Ili ▪ • 1I1• :T. .alt•ai • " • • • .
BLACK & VEATCH
1
Mr. Scott Linebaugh
j •
• .i•
ALItt °AI -nu.
April 8, 1983
Based on the level of work completed to date and anticipated additional
work, it is suggested that $30,000 be appropriated to complete the swlge
rate studies.
Please contact us
if you have any questions ,regarding these estimate;.
Veiy tijily:yours,
::BI.AC 16 / AT
sita
.4
• . .
. .
. • . • ' 4
lw
J. R. Brown
•
•
• is • • i' ' • PI 1 1 11••••• In : 1 ..
l'• . no! 711. . r • • SIII • in • • ••I. • 4 •• . • r tr .
. •••• . . • •
• .. • ..• . .. I • '1111.1 •MI. •• • :•••• or
• •11.1 • •1.71,.: III m 1.15r; m. • lir. • •• .
• • I • .1: , a .
: • .
• • '• • • 1E4 • • 0 ••. ,
I. 1 1mmilimmimilmi"11.6thimnimmilmjaligark•sm;SlalammieWildimamplwabem•• °•1 .....
I.
•
2,04
•••"
RESOLUTION NO.,
•
A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO
EXECUTE AN AMENDMENT IN THE CITY'S JUNE 17, 1980,
CONTRACT WITH BLACK & VEATCH, CONSULTING ENGINEERS,
FOR A WASTEWATER RATE STUDY TO AUTHORIZE AN INCREASE
IN THE COMPENSATION TO BE PAID THE ENGINEERS.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY
OF FAYETTEVILLE, ARKANSAS:
That the Mayor and City Clerk are hereby authorized'ani
,; 'directed to execute an amendment in the City's June 17, 198).
contract with Black & Veatch, Consulting Engineers, for a
wastewater rate study to authorize an increase in the
compensation to be paid the engineers. A copy of che
amendment authorized for execution hereby is attached
hereto, marked Exhibit "A", and made a part hereof.
Ind
PASSED AMD APPROVED thiacta day of March, 1982,
ATTEST:
_-'y% A4/
CITY CLERK!'
/9
c
APPROVED:
/12 /i. ;-7)-2faiCtd/ • •
,lj
MAYOR
•
.1 d;..
I .
11."• :mite
I 3! : 11
11
•11. • •
• • •
I •
• II lia I 'I •• •I
If
• • I In • , •••• ••• • I a . 1 i I .•
••• r
V • . •
nt • • • • ••1 •
• • .1 Nu
• • • . •• / 0 I don it'll • p •
•
R.A.....: ate 1 a r44 I i •
1.....A....I.M1..••• • %Ens • mu! • 0J =FIN 'I 1 1•. :•iniai •••••••••=11= II 41•Idegnhall
•
!if ,t6.
• I ;
FIRST AMENDMENT
TO 2.05
CONTRACT BETWEEN
CITY OF FAYETTEVILLE, ARKANSAS
AND
BLACK & VEATCH
1
THIS CONTRACT, executed in duplicate this day of
1982, between Fayetteville, Arkansas, hereinafter called the City, and Hack
6 Veatch, Consulting Engineers of Kansas City, Missouri, hereinafter cafled
the Engineers:
WHEREAS, the parties entered into a written agreement dated June 17, 19:T
relative to a comprehensive water rate study and wastewater utility serfIce
charge study; and
WHEREAS, the City requested that the Engineer not proceed with the wastewater
service charge study at the time that the water rate study was undertaken, and
WHEREAS, the City now wishes to proceed with the wastewater service chain:e
study and recognizes that cost increases have occurred since the origin'',
contract was executed;
' NOW THEREFORE, the City and the Engineers agree to amend Section 1131 an/182
as follows:
1 •For the services outlined in SECTION Id and the wastewater portion
of SECTION IC. the City agrees to pay the Engineers a cost-pFt
fixed fee,payment which shall include direct salary, actual crtIthead,
other indirect costs, direct expenses, and fixed fee. Thb tOL
fixed fee for the study shall be $4,200'. The total of the maathly
payments shall not exceed THIRTY-TWO THOUSAND TWO HUNDRED DOLLARS
(832,200) without further authorization.
2. Cost shall mean salary, salary times a multiplier to cover act,!al
overhead and other indirect costs, plus reimbursable expense r ;.t
actual cost. Tbe multiplier to cover actual overhead and faci:ities
capital cost of money shall be 1.033. This multiplier shall
until June 26, 1982. The multiplier shall be changed annual:ip on
June 27 to agree with actual overhead and other indirect costs of
the Engineers during the pervious calendar year.
IN WILINESS WHEREOF the parties hereto have executed this contract this
"tt day of.1.:5:70774; Pc/L. 1982.
ATTEST:
4 4 ;
CITY c4ppcU,
CIT( OV
, FAYETTEVILLErk SAS
By
)
!._7
MAYOR 74'.7
C. • ie
tacK s.vEAtgu.pcONsuarlidzsoiNEEE.4
,, .; ;117,-4;4} "".• .• PI f
r4/.11jiget ?set .
ros.e4 i;!' • 4
rig:4
;Fp; CIF . • ,61. .14 A:IA...,
- • . - /I .1.: %IT .) H 1 -es... at.t.11111; I 1""6 t2.0 WIELf”.:
•-•-....61.160., • • eg.z....ligalisig
(.
BLACK & VEATCH
CONSULTING ENGIrEERS
Mr. Don Grimes
City Manager
City of Fayottovillo
P. 0. Drawer F
Fayetteville, Arkansas 72701
Dear Mr. Crimes:
2.06
TEL. (913i 957.200ci
TELcx 42-6263
1500 MEADOW LAKE PAM, A ly
MAILIP40 ADDPEOS: P.O. DOI NO 11'15.
KANSAS CIT*. MISSOURI r 4'14
March 21, 1983
We are enclosing our statement for engineering services in connection
with the Waste Water Rate Study, our Project No. 9242.002. These charges
are for the period November 27, 1982 through February 26, 1983. These
charges include $2,024.08 that should have been billed on our invoice
No. 9242.005-12-2-424 for Mr. Algie's time and was inadvertently added
to the 002 phase of the work, and the remaining charges are all the
result of requested trips to Fayetteville by both Mk. Bickel and myself.
We recognize that these charges exceed the maximum established for the
Waste Water Rate Study; however, they are all as a result of direct
requests from either. Mr. Bunn, the Maya, or yourself. If there are
.any questions regarding this statemeot, please let us know.
At 41 'Sp
1 I:0 "ip C. • .
e• •
O.
a -
••..4.• 1.:
IP1. '
... •
11j
Enclosure
- •
r• • i• e•
;7531•12r;11;I;
1 •• •
• 1 M• 1, • • •
• I
6 im•-•-•4.-11. •Astr ••••; • •••• • wwthiLklahlrim •
NIP elei••
• 1 " ; IT
ii•egLehni •
BLACK & VEATCH
CONSULTING ENGINEERS
City of Fayetteville
P. O. Drawer F
Fayetteville, Arkansas 72701
Attention: Mr. Don Grimes
City Manager
INVOICE 9242.002-03-3-865
0398-2
March 10, 1983
Engineering services in connection
Our Project No. 9242.002
•:•• r•••:.• .0, : •
• •las.anamakm.-;-la • I
with •mas
: • ; -
•.•.:
• liE s
TEL i 912 67.2000
Tan : 6263
1500 MEADOW t '.KE PARKWAY
1.1AILWO AOOKOM. 1 3. 001 110 0405
KANSAS CITA. PA mourn 64114
Waste Water Rate S:udy.
Unbilled on our Invoice 9242.002-12-2-371 dated 12/13/82 $ 2,024.08
DECEMBER 1982 - FEBRUARY 1983
J.H. ALG/E.
K.L. ARTH
J.P, JACKS
ta.K: MITCHELL,
LI? WILLIArSI
2t.tC. BICKEL
47.11:. BROWN
M.T. PATTON
TELEPHONE
TRAVEL
COMPUTER
POSTAGE
REPRODUCTION
OVERHEAD & FACILITIES
CAPITOL COST OF MONEY
@ SALARY X 1.02135
SALARY
157.70
6•15
8.34
11.85
1,236.76
1,732.18
22.10
•
.$ 3,199.13
3,267.43
$ 6,466.56
FIXED FEE TO DATE $ 4,200.00
TOTAL BILLED TO DATE $ 43,073.57
•
149.00
552.97
34.43
1,596.00
9.44
11.09
30.00
$ 2,382.93
$ 2,382.93
8,849.49-
• •
-"•"T T '
.
.W.aci-al"
• • ;I
;Ft.: zer=yr
: I • jaejda
•
• ailri:114entor/;k'7•1CIPi0•
p-
,414i.:$t1r•p.i14at-
..,
1:
dioa13us_'a , .a „loin,' no Sat
" • -
BLACK & VEATCH
CONSULTING ENGINEERS
. City of •Fayetteville'
P. O. Drawer F
Fayetteville, Arkansas 72701
:1
Attention: Mr. Don Grimes
City Manager
INVOICE 9242.006-03-3-866
0398-2
2.08
ilitadiumiHr Fai sa
TEL (D13 ;7-2000
TELEX 4 J263
1900 MEADOW 4E PARKWAY
•I AMINO ADONE•f• . L BOY NO • DS
KANSAS CITY.'1 IOURI 64114
March 10, 1983
Engineering services in connection with Alternative Compnr.son.
Our Project No. 9242.006
FEBRUARY 1983
S.W. BICKEL
H.D. DOTY
PLUS 100%
PAYROLL
$ 568.75
169.18
73793•
737.93
EXPZISE
. 11...
r
•Frrimoinsat‘
t
z•E:t. jat
!I . • 1' :••••
1.•
, • y
$ 1,47546,
TO.AL BILLED
$ 1,475.86
daf e cO•O 5-
•
•
2.09
BLACK & VEATCH
CONSULTING ,ENGINEERS
TEL. 19131 96%4 300
TELEX 42.626:
1500 MEADOW LAK! F kRKWAY
IMMLINO ADDRESS: P0.. Of NO 040,
KANSAS CITY. .N11111£< 64t11
!larch 16, 1'2 V.
Wit i ..... atal .: -7: --"' 7-
7.--414.tiriiii74'et,:
11
p.1•rizfri:„...." .777:: r : ' :i. 7:;-:::04`
:
:
rtir•c•-nr. : ..-7:-.;,„ .
•
Mr.•. -Don Critics :1
.0...,..ut.,-
r-.1, :•••
,. ,, pi ,. IV cit:'? :.lan.ager ., •
. .... '. 7 . City of Fayetteville
...' P.O. Drawer F .
Fayetteville, Arkansas 72701
Dear Mr. Crimes:
We are enclosing our statement for engineering services in connecti 1.1
with the water rate study, our Project No. 9242.006. These charges
are for the period from January 27 through February 26, 1983 for wo
related to development of the five alternative rate schedules requeLed
by the Board of Directors.
If there are any questions regarding this statement, please let us'
know.
Very truly yours,
N..70W9
J. R. Brown
Ilj
Enclosure
•
mar
•
'1•11,••••••••-.."-'1"&irmi•T • :• ••••
• •
4101 • •
.7rJl. •• •L • , '1••••W•A
:1 • .1•1•1.•. •m •
vmaA"e•lI ••
i•g; . •1A•• •In •
•
1.
00•11611amii• .I: ."• - -•
•• - •
• •=1
I •
•
Efl•• •
2.107tEN1.€ q'i, 191;16 ale'l ilf207-4--'
1.
!•• , • •
mt :"
.1
I .
a •••
••• .....
I. Lim
.. : • z • , .. •L ....••• • •
• 1 A
,
' A •
•
• • • •
I
Am ••
• .
a
•
•
10 For the services outlined in SECTION TB and the wastewalal 1 .y• • ..
• ,
portion of SECTION IC, the City agrees to pay the Engin. .273 a . do,. . .
:. •
cost-plus fixed fee payment which shall include direct .a'ary,
actual overhead, other indirect costs, direct expenses, a d
fixed fee. The total fixed fee for the study shall be 3 200.
The total of the monthly payments shall not exceed TWENFN-FOUR
THOUSAND SIX'HUNDRED DOLLARS ($24,600) without further at:horization.
B. Wastewater Service Charge Study
2. Cost shall mean salary, salary times a multiplier to COJCC
actual overhead and other indirect costs, plus reimbuntie
expenses at actual cost. The multiplier to cover acturl
overhead and facilities capital cost of money shall be 0 92908.
This multiplier shall apply until June 26, 1980. • The :al tiplier
shallbe changed•annually on June 27 to agree with act:al •
, •overhead and other indirect costs of the Engineers durt; the
Previous calendar year.. .
, ...
, . .
. .
, . . . • - . .
'Reimbursable expenses and cotts:shalI'be actua.
. , , , . .
.,
..pocket travel and subsittencelflpenses oft;petconnelo gi40 irn::.
trill; work Whilrraway'from the officerthe:Engineers aaii.all"...
. other directiouts6ofakpocket c6tts forprintiut..long 0
Iblephone, cOmputer Uric charges, copying and other inc .dental
costs expended in connection with this work. Includin;; iny• • I
work performed by a subcontractor for the Engineers.-
4. The City agrees to make monthly payments to the Enginacrs,
within thirty (30) days after the date of billing, for the
services rendered under this contract on the basis of :tatements
subriitted each month. Statements shall be,accompanici by
adequate itemization to fully indicate the,basisiof charges.
Additional Services
1. The maximum payments limits for the water and wascesc.:(:er
studies outlined above shell not be exceeded unless, additional
meetings, appearances, or studies are required and sa':cifically
authorized by the City. Such supplemental services 5alt be
furnished on the basis of charges set forth in SECTIO:: II,
Paragraph A2, except that they will not be included ia the
stated maximum payments limits for either study.
2. For additional services, the City agrees to pay the Engineers,
within thirty (30) days after date of billingthe araunt due
for such services rendered during the month.
tstcrtor ru - MUTUAL UNDERSTANDING
is mutually understood and agreed:
A
m •
A :C
Immms
•
•
•