Loading...
HomeMy WebLinkAbout49-83 RESOLUTION• En• RESOLUTION NO. 1/4? -4C3. ; •••C A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A CHANGE ORDER IN THE CITY'S CONTRACT WITH KAN-ARK INDUSTRIES, INC. FOR THE RENOVATION OF THE CITY ADMINISTRATION BUILDING FOR THE INSTALLATION OF A VIDEO CONTROL BOOTH ADJACENT TO THE BOARD OF DIRECTORS ROOM/MUNICIPAL COURT, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute a change order in the City's contract with Kan -Ark Industries, Inc. for the renovation of the City Administration Building to provide for the installation of a video control booth adjacent to the Board of Directors Room/Municipal Court. PASSED AND APPROVED this 5-413 day of April, 1983. •!•Ltes .j"? -4"! • •• 4 !...• 'It .4 *** AN. i g•:c; 14st 4 •: - .'ATTEST :b . ,o4t • ^. 1} ••••• • ••• • City Clerk • APPROVED: BY ya,:.,)r,2%„, ORDER AIA DOCUMENT G701 PROJECT: RENOVATION OF (name, address) CITY ADMINISTRATION BUILDING FAYETTEVILLE , ARKANSAS TO (Contractor): . [AN -ARK INDUSTRIES, P. 0. BOX 277 ROGERS , ARKANSAS 72756 [_ATTENTION: MR. JOE S GRANA PROJECT MANAGER You are direc ed to make the following changes in this Cont act: _ OWNER ` ARCHITECT CONTRACTOR FIELD OTHER CHANGE ORDER NUMBER: INITIATION DATE: ARCHITECT'S PROJECT NO: CONTRACT FOR: Construction (Remodel April 6, 198 810 CONTRACT DATE: 14 September 198; To make revisions per Proposal Request No. 5 attached. ADD $ 10,928.00 atatc.4_1TirFeA_to u ot Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) V/MalSki/e4 KOMOSOLA klksX)Xwas $ 1,077,435.00 Net change by previously authorized Change Orders 28,302.00 The (Contract Sum)Nglal(aYaieXcl KAIU AG X rX t.1(4)Xprior to this Change Order was $ 1 105,737.00 The (Contract Sum)XXXANANXvi‘XilnXikiXdfoXIX will be (increased)XcliadeXAMX0(iitKihati by this Change Order 10,928.00 The new (Contract Sun) YOU 44 ificAd4ANIMIALJEIXad(S19 including this Change Order will be $ 1.1116 ,665.00 The Contract Time will be M3fiXaXodicH14(stirNXunchanged) by . 1 Days. The Dale of Substantial Completion as of the date of this Change Order therefore is . HAILEY • POWERS ••FRONING KAN-ARK ARCHITECTS, LTD. 4fiCHITECT raYPfrov-111P ArkanCae Address Don BY DATE J. Froning, AIA INDUSTRIES, INC. CONTRACTOR Rogers, Arkansas Address Kenneth BY DATE 41 /e -fl Authorized: THE CITY OF FAY ETTEVILI kiThicipai Corporatioi Address Assistal David McWethy, City M DATE • OWNER PROPOSAL ARCHITECT REQUEST CONTRACTOR FIELD AIA DOCUMENT G709 OTHER PROJECT: (name, address) OWNER: TO: (Contractor) riAN-ARK INDUSTRIES, INC. P. 0. Box 277 Rogers, AR 72756 LAttn: Joe S. Graney Project Manager Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modifica tions to the Contract Documents described herein. RENOVATION OF CITY ADMINISTRATION BUILDING FAYETTEVILLE, ARKANSAS THE CITY OF FAYETTEVILLE, ARKDATE: A MUNICIPAL CORPORATION PROPOSAL REQUEST NO: March 15th, 19E ARCHITECT'S PROJECT NO: 81C CONTRACT FOR: Construction/Remode CONTRACT DATED: 14 September 198 THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN Description: Witten description of the work) To make revisions at Second Floor Board Room and add control booth as shown on Sheets X-9, X-10, and X-11 attached. To add fourteen (14) radio outlets consisting of 3/4" conduit with junction box mounted 12" above finished floor and extending 12" above ceiling. They will be in the following rooms: 010 (2), 011, 013, 031, 033, 116, 120, 125, 206, 303, 309, 316, and 322. (See Architect for exact locations.) To add 3" conduit stubbed through roof with gooseneck at Room 331. Attachments: (1.isi attached documents that support description) Sheets X-9, X-10, and X-11. ARCHITECT: HAILEY-POWERS.FRONING ARCHITECTS, LTD. BY: Donald J. Froning, AIA 4ItR111 titrf201.ciettITH- - • d • ot4Titici.!!ef.:LAESeLic-CI:02. Hcs..ziATI....S444Apil9 1.4C.C. • I - . - el'5aCri" ION .._ reskei loseLe Nor cPA4ee--4.-frieweverz --ir -.Nee:215_22r° se. Lear...Ares, Ate- *4- secrico4 if 1 I I 1I LL,,,k/IiLj .Dzys.r.r.r4T-4.1.1-Aivfek4=L-- • • -„ ir wetottri t -t _ —. 141J# ±4coofm • . VecHAH to A-- - tizebtesa. ..7"") 1 tiLsn. ig1-1,4 7 CetiarSOM - ' -ff_160>i_ll?,1---a- 7_ To (OTR,f \-Cm -1-ta8tfrm- ICO W INCAI4C2 Ol4 rMMeJS. t_.1A-Liti--n ca4OUIt Fz.LIMS _ _ To co)4112c%. Poczni-I toPM- Fot2M-Io0AA I e.,(FoR AsJoio_ - _ v 'surest- asti.Ji FP. ) Lie•HT's 4 eLectisoc.L.- t:Lt :ad izvrAA/P-OC. . ri=2•04,4-111,147,0 _ G.Ea Ft-copt..- dro efrk co _ incoscre oLlor 4.ANArreg.. WOES —AS -NEAR-7/45- PoES I ILINIED4 WALL.- -9774Aa-kg• NV: Folz- $W. AMT., Orrr PerM LJ kill tale- WA( C>1. -A P.1 przwe tisodMp IbecT'is -..-Joiels5-C —41 Epee:it/NI F-012 ia" Dice - cLe-• 1 -• 1941544E9 -, - k/At.LE- PT Gle pt.E.rIn GYP: I• -•7- 6.ff? 1::,.--;.--_-_:::. T .--r--7: ost..-.-02;51)-- ' \—.7.4e-ACSiz-_- EC7;AS.St:7' RAN coFeg., TAUIT. - - i; 211 #21 214- - -2)/4- wt anti:* --A1Lier se Arx?eri, r lsZ 7115(...C. wAbt.e. HAILEY-POWERS-FRONING, ARCHITECTS, LTD. FIRST PLACE SUITE 440- PO. BOX 790- FAYETTEVILLE, ARKANSAS PROJECT: CITY 40M114. rAteerrEm LA_ PROJECT NO, _1_ Slot i -- L SHEET II I HAILEY-POWERS-FRONING, ARCHITECTS, LTD, FIRST PLACE SUITE 440- P.O. BOX 790- FAYETTEVILLE, ARKANSAS _ PROJECT: CITY 4OMit4 rat --1-11E:v1- L -LE, Ace. 1 PROJECT NO. SHEET _•610_& X•11 • KAN-ARK INDUSTRIES, INC. GENERAL CONTRACTOR - . Telephone (501) 636-5380. RerGERS, ARKANSAS 72756 130 Kelley Drive ?. , . . April 1, 19§3 HaileyrPowers-FrOning 1st Fed. Bldg.' - P.O. Box 790 Fayetteville, AR.1 72701' rot RECEIVE. • ' :HAILEY' A_Ic PriaRSif:;,•••y.•fttliffEr!llYs:•: - • Attn:. Don Frani% RE: Renovation of . City Administration Building Fayetteville, 'A±kanSai - Dear Sir; . " We propose to make the reVisions covered under Proposal Request No. 5 far an add to the Contract Sum of Ten Thousand Nine Hundred Twenty -Eight Dollars, The breakdown is as followsi APR 2 1983 • Demolition labor Masonry Material Masonry Subcontractor - 'HollowMetal Veterial HollowMetal Labor Carpentry 'Material Carpentry Labor Millwork Material Millwork Labor • Drywall &Acoustical Subcontractor Mechanical Subcontractor Fire Protection Material Fire Protection labor Electrical Subcontractor (See attached quote) -Flooring Subcontractor Painting Subcontractor Glass & Glazing Subcontractor Finish HardwareMaterial FinistrHardware labor Roofing Subcontractor Sales Tax onMaterial Labor Overburden Contractor's Fee Total Added Cost 32.61_4% •woo', 200;00 150 00. 55.00 623.00 514.00 108.00 123.00 390.00 514.00 238.00 200.00 5,351.00 100.00 250.00 100.00 200.00 30.00 50.00 54.00 181.00 1,425.00 $10,928.00 • rage • • • ARCHITECTS; LTD. P. 0. Box 790 First Place, Suite 440 FAYETTEVILLE, ARKANSAS 72702 Phone 442-5565 LI-ffThLK1 (ID DATE F 1113dkIR April 13th, 1983 ATTENTION JOB NO. 8103 U11-1174,\LL TO The City of Fayetteville David McWethy, Asst City Manager RE PO Drawer 'F' Renovation of City Administration Building Fayetteville, AR 72702 WE ARE SENDING YOU XII Attached U Under separate cover via the following items: COPIES o Shop drawings LI Copy of letter DATE Prints 0 Plans *1 Change order S with attachments D Samples El Specifications DESCRIPTION 1 ea. 4-6-83 14 containing revisions per Proposal Request No. 5 4-6-83 15 containing revisions per Proposal Request No. 6 4-6-83 16 containing revisions per Drawing X-13 THESE ARE TRANSMITTED as checked below: REMARKS • O For approval tx Approved as submitted 0 Resubmit copies for approval • For your use 0 Approved as noted 0 Submit copies for distribution O As requested 0 Returned for corrections 0 Return corrected prints O For review and comment 0 O FOR BIDS DUE (Signed file copies) 19 D PRINTS RETURNE.D AFTER LOAN TO US • nnnnIA 1 •