Loading...
HomeMy WebLinkAbout120-83 RESOLUTION• z • RESOLUTION NO.. �_ 83 • A RESOLUTION AJJTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AMENDMENT TO THE CITY'S ENGINEERING CONTRACT DATED JUNE 21, 1983 WITH McCLELLAND,,CONSULTING ENGINEERS, INC. FOR FAA PROJECT NO. 3-05-0020-04;TO PROVIDE FOR A CONCRETE PAVEPENT-,ALTERNATIVE. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute the amendment to agreement for engineering services attached hereto, marked Exhibit "A", and made a part hereof. Wit PASSED AND APPROVED this tb T� day of October, 1983. • r P1. _ • • APPROVED: Mayor ovirvx • WC, AMENDMENT NO. TO AGREEMENT FOR ENGINEERING SERVICES The AGREEMENT, made the 21st day of June, 1983, by and between the CITY OF FAYETTEVILLE, ARKANSAS and McCLELLAND CONSULTING ENGINEERS, INC., Fayetteville, Arkansas, is amended as follows: WHEREAS, the City of Fayetteville desires that the scope of services be increased to incorporate design, construction observation services, and materials testing, for a "concrete pavement alternative", and WHEREAS, the Federal Aviation Administration (FAA) is the primary funding source for referenced Project No. 3-05-0020-;04', and requires that a formal contract amendment be executed if said additional services are to be considered as eligible for FAA funding, WITNESSETH that the additional stipulations are hereby agreed: In accordance with Section C, of the original contract, the Owner directs the Engineer to revise the Plans and Specifications to reflect a bid alternative for constructing concrete pavement, in lieu of asphalt. In accordance with the provisions of the Basic Agreement, the Engineer agrees to provide related additional engineering design services for this "concrete pavement alternative" for one -thousand, six -hundred, twenty-five dollars ($1,625). Furthermore, if (and only if) the "concrete pavement alternative" is the one selected for actual construction, the OWNER agrees to pay approximately one -thousand, seventy-five dollars ($1,075) in additional materials testing fee (bringing the total fee "estimate" for materials testing to $4,375), and four -thousand, eighty dollars ($4,080) in additional construction observation fee. This Amendment increases the Design and Construction Observation fee to forty-two thousand, seven -hundred, seventy-five ($42,775) and, if the concrete alternative is selected for construction, increases the Preliminary and Detailed Planning, Design, and Construction Observation fee to forty-six thousand, eight -hundred, fifty-five dollars ($46,855). EXH$iT A The time of performance by the Engineer will not delay the overall completion of the design,phase of the project. (SEAL);''"►.Y. ,•� . -'-fit • .rt 41By _ .O. T, a Name.`tMaE. Griffin .yP • Title Date (SEAL) ATTEST: By Type Name Title Date _ ' City Clerk 10/21/83 iC- AiJWr✓ John C. Quinn Acting Sec'y-Treas. 2 OWNER: CITYi6F.. FAYE By Type Name Paul R. oland Title Date OWNER: Mayor 10/21/83 McCLELLAND CONSULTING ENGINEER, INC. Type Name Vernon D. Rowe Title Vice President Date S`p 2S> /983 TO P.C. Fox- 1229 1810 No College Ave. FAYETTEVILLE, ARKANSAS 72702. Phone (501) 43-4271 443.2377 GENTLEMEN: COPIES c' J LLQ U U U F.1-11,113-M*11 L tl I DATE 7\SD r� w2-�U. PTTENT�n^.' �J RE *id f sic Al A4 .5 Al? * 3-o5- Onx°- o4- WE- ARE SENDING YOU Et(Attached ❑ Under separate cover via L Shop drawings ] Prints L Copy of letter DATE NO. Change order AAraine __the following items: SpecAlfi ations DESCRIPTION THESE ARE TRANSMITTED as checked below: ✓ For approval L Approved as submitted L /For your use D Approved as noted L As requested ❑ Returned for corrections VFor review and comment L' REMARKS O FOR DUE lm' Guth -p lcui c SpQC..vn Al or��►� (tee d4.2 An/Wit 19 O Resubmit copies for approval O Submit copies for distribution L• Return corrected prints L PR RETURNED ,ATER OAN TO US Ft COPY TO g .tc)