Loading...
HomeMy WebLinkAbout114-83 RESOLUTIONRESOLUTION NO. 114-83 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A CHANGE ORDER IN ITS AIRPORT ROADWAY CONSTRUCTION CONTRACT WITH McCLINTON-ANCHOR TO AUTHORIZE THE CONSTRUJCTION OF A TAXIWAY! SAND FLOOR AREA FOR A NOISE BARRIER. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute a change order in the City's airport roadway construction contract with McClinton -Anchor to provide for the construction of a taxiway and floor area for a noise barrier. A copy of the change order authorized for execution hereby is attached hereto, marked Exhibit "A", and made a part hereof. "-•-* PASSED AND APPROVED THIS 4h COiJ:;Y.-a ATTEST: By: 20th day of APPROVED: By: 0ao6/ Mayor September • , 1983. E CHANGE ORDER ,A PROJECT: Change Order No. 1 Access Road to Eastside Facilities Drake Field Fayetteville, Arkansas OWNER: Job No. MCE 82-118 ESI 83-30 City of Fayetteville FAA AIP No. 3-05-0020-03 P.0. Drawer_F -FAA AIP No. 3-05-0020-04 Fayetteville, Arkansas 72702 Date: October 12, 1983 Contract Date: September 9, 1983 CONTRACTOR: McClinton -Anchor Company P.O. Box 1367 Fayetteville, Arkansas 72702 Project Description Access Road to Serve Eastside Facilities, Drake Field Changes to be Made FAA ADAP No. 3-05-0020-04, Amendment No. 1 • 1. Add construction of Runup Apron do the contract as specified in. the attached plans. 2. Add Bid Item No. 5A for additional haul of sideslope fill material from stockpile area. 3. Add Bid Item No. 32 for construction staking required for runup apron. 4. Increase contract time by 21 calendar days for a total of 111 calendar days. EXHIBIT. • Bid Contract Item Changes No.. Original Estimated Quantity 1-A 4 6,095 1-B 5 1,755 1-C 5A -0- 1-D 7 9,300 1-E 10 5,295 1-F 11 3,010 1-G 13 975 1-H 24 4.40 1-I 32 0 Contract Unit Price $ 2.15 0.35 0.15 5:00 10.7E 1.50 37.25 1,400.00 975.00 Revised Estimated Quantity 7,074 4,528 2,773 11,240 6,219 3,438 1,437 5.50 Lump Sum Total Original Contract Amount • Increase in Contract Amount Original Estimated Cost $13,104.25 614.25 -0- 46,500.00 56,921.25 4,515.00 36,318.75 6,160.00 0.00 $164,133.50 Revised Contract Amount Revised Estimated Cost $ 15,209.10 1,584.80 415.95 56,200.00 65,854.25 5,157.00 49.430.75 7,700.00 975.00 $199,526.85 $270,151.95 + 39,393.39 $309,545.20 THE AFOREMENTIONED CHANGE, AND WORK AFFECTED THEREBY, IS SUBJECT TO ALL CONTRACT STIPULATIONS AND COVENANTS. ISSUED FOR REASONS INDICATED ABOVE: ACCEPTED BY CITY OF FAYETTEVILLE: -.--:t-'ACCEPTED•BY"McCLINTON-ANCHOR C0: ACCEPTED BY FEDERAL AVIATION ADMINISTRATION: CONDITIONS OF SATISFACTION: ELLAND CO ULTING ENGINEERS, INC. /1 /z?93 Date filaa e /0,03 ignature Mayor Tit n id P • / a/3/3 Title Date 4A6 . Smh Manager A' port 1/ Da District Office This change order is considered satisfactory. Federal participation in the increased cost is subject to the availability of federal funds. • • CHANGE ORDER PROJECT: Access Road to Eastside Facilities Drake Field Fayetteville, Arkansas OWNER: City of Fayetteville P.O. Drawer F Fayetteville, Arkansas 72702 CONTRACTOR: McClinton -Anchor Company P.O. Box 1367 Fayetteville, Arkansas 72702 Change Order No. 1 Job No. MCE 82-118 ESI 83-30 • FAA AIP No. 3-05-0020-03 FAA AIP No. 3-05-0020-04 Date: October 12, 1983 Contract Date: September 9, 1983 Project Description Access Road to Serve Eastside Facilities, Drake Field Changes to be Made FAA ADAP No. 3-05-0020-04, Amendment No. 1 1. Add construction of Runup Apron to the contract as specified in the attached plans. 2. Add Bid Item No. 5A for additional haul of sideslope fill material from stockpile area. 3. Add Bid Item No. 32 for construction staking required for runup apron. 4. Increase contract time by 21 calendar days for a total of 111 calendar days. • Bid Original Contract Item Estimated Changes No. Quantity 1-A 4 6,095 1-B 5 1,755 1-C 5A -0- 1-D 7 9,300 1-E 10 5,295 1-F 11 3,010 1-G 13 975 1-H 24 4.40 1-I 32 0 Contract Unit Price $ 2.15 0.35 0.15 5.00 10.75 1.50 37.25 1,400.00 975.00 Revised Estimated Quantity 7,074 4,528 2,773 11,240 6,219 3,438 1,437 5.50 Lump Sum • Original Revised Estimated Estimated Cost Cost $13,104.25 $ 15,209.10 614.25 1,584.80 -0- 415.95 46,500.00 56,200.00 56,921.25 65,854.25 4,515.00 5,157.00 36,318.75 49.430.75 6,160.00 7,700.00 0.00 975.00 Total $164,133.50 Original Contract Amount Increase in Contract Amount Revised Contract Amount $199,526.85 $270,151.95 + 39,393.39 $309,545.20 THE AFOREMENTIONED CHANGE, AND WORK AFFECTED THEREBY, IS SUBJECT TO ALL CONTRACT STIPULATIONS AND COVENANTS. ISSUED FOR REASONS INDICATED ABOVE: ACCEPTED BY CITY OF FAYETTEVILLE: ACCEPTED BY McCLINTON-ANCHOR CO: ACCEPTED BY FEDERAL AVIATION ADMINISTRATION: CONDITIONS OF SATISFACTION: Mc,1;LEL LAND CO ULTING ENGINEERS, INC. Signature Mayor Title 19 /De/Z-6'3 Date ‘21...<.-l\' ature /1/R ,/,!///gS Title Da • Chief, Airport District Office Date