HomeMy WebLinkAbout104-83 RESOLUTIONRESOLUTION NO. 104-83
i _
A RESOLUTION AUTHORIZING"THE MAYOR AND CITY CLERK TO
EXECUTE A.CONTRACT FOR ENGINEERING SERVICES WITH
NORTHWEST ENGINEERS, INC. FOR THE DESIGN OF STREET
IMPROVEMENTS.TO LYTTON, BI:AIR,AND MASHBURN AVENUES.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF. THE CITY OF
FAYETTEVILLE, ARKANSAS.
That the Mayor and City Clerk _are hereby+authorized and
directedto execute a contract with Northwest Engineers., Inc.
for the deisgn of street improvements to Lytton, Blair and
Mashburn Avenues.. A^copy of the contract authorized for
execution hereby is attached hereto, marked Exhibit "A" and
made a part hereof.
PASSED AND APPROVED this. 6th
1983.
,t_,
b • id4f ..
.110
. rAtArintS di
.y
1
erk
day- of September
APPROVED:
HUD PROJECT NO.
ST -83M702
AGREEMENT FOR ENGINEERING SERVICES
FOR
RIGHT OF WAY MONUMENTATION AND STREET IMPROVEMENTS
THIS AGREEMENT, made and entered into this 19 day of September
1983, by and.between the City of Fayetteville, hereinafter referred to as the
"Owner", and Northwest Engineers, Inc., Consulting Engineers of Fayetteville,
Arkansas, hereinafter referred to as the "Engineers
WITNESSETH THAT:
WHEREAS, The Owner desires to make specific improvements within the City of
Fayetteville requiring the services of an Engineer; and
WHEREAS, the Engineer has sufficient experienced personnel and equipment to
perform the work described in this Agreement;
Now THEREFORE, in consideration of the mutual covenants and agreements herein
contained, the Owner and Engineer, the parties hereto, stipulate and agree that the
Owner does hereby employ the Engineer to perform the required engineering services
as hereinafter set out; and the Engineer agrees to provide said services for the
compensation as hereinafter set out.
Section 1. Description of Project
The project for which engineering services are to be provided is generally
described as follows:
A. Survey and monument the right-of-way for Lytton, Blair and
Mashburn Streets (from ihmtsville Rd. to end of Streets).
B. Provide Design Services for paving Lytton, Blair,and Mashburn
Streets, with curb and gutter, strom drainage and sidewalk
on one side.
C. Provide construction management for paving, curb and gutter,
storm drainage and sidewalk on Lytton, Blair, and Mashburn
Streets:
Section 2. Scope of Engineering Services
The Engineer shall provide a suitable staff to perform the basic engineering
and surveying services more specifically defined as follows:
A. Survey and Monument Street Right -of -Ways. The work to be done under this
item shall consist of the following:
1. Perform necessary field surveys and office research needed to
establish. the right-of-way boundary for Lytton, Mashburn & Blair Street:
2. Set iron pin monuments at all points of change in direction of
the boundary.
3. Prepare a plat of the. boundary showing any apparent encroachments.
All of the above described work shall be completed in fourteen (14) days from
the date of Notice to Proceed. Compensation for all of the above described work
shall be a lump sum fee of $2,500.00as set out in Section 3.
B. Prepare Preliminary Engineering Report and Detail Design. The work to be
done under this item shall consist of the following:
Perform detailed field surveys of the various sites to establish data
necessary for the preparation of. preliminary plans. The field survey
shall include:
The location of all existing utilities as best can be determined
without excavation, through co-ordination with the various
utility companies.
b. Draw cross-sections of the projects on 50 -foot stations and
additional sections as needed for design.
c. Establish a base line for each project and reference the base
line such that it can be re-established at a later date.
Prepare copies of all reduced field survey notes and reproducibles
(mylar or sepia) of the cross-sections and plans of the existing
features as determined by the field surveys and deliver to the
Owner.
Prepare one copy of "red -lined" drawings on blueprints completed
under item ."d" above showing the design which would meet the
requirements for the requested services as outlined in Section 1
of this Agreement.
f. Prepare.a construction cost estimate for each individual project.
g.
•
Advise and consult with the Owner.as to soils investigations that
might be. required.
h. Meet with the Owner and their agents to present the information
and assist in deciding which project to proceed with detailed
engineering.
i. Prepare detailed plans, specifications, and bid documents of
those projects selected by the Owner.
Assist the Owner in advertising for and receiving bids for
construction of the selected project.
•
All of tiic work described under Section 2D of, this Agreement shall he completed
within six (6),weeks from the date of the Notice to,Proceed.
•
Upon completion of the work as outlined in Section 2Ba through 2Bh the
Engineer shall be paid eighty (80) percent of the fixed fee for design as
set out ih section 3. Upon the receipt of bids for the projects, the Eng-
ineer shall be paid the remainder of the fixed design fee.
Any changes or alternate designs made at the request of the Owner will be
made at the hourly rates quoted herein and shall be considered extra work
and notsubject to the fixed fee.
C. Construction Phase. The work to be performed under this item shall be
as follows:
1. 'Provide for construction observation as necessary to insure compli-
iance with the plans and'specifications.
2. Provide for periodic visits to the job sites by a professional eng-
ineer to observe the overall progress and quality of the executed work.
3. Provide a.survey crew to lay out the project for construction.
4. Assign a project engineer to manage and coordinate the construction
activities
5. Provide other personnel as needed to assist the project engineer in
the various activities that may be required.
6. Prepare monthly partial payment estimates and a final estimate to the
contractor, including the assembly of written guarantees which are
required by the contract documents.
7. Provide for final inspection of the project in company of represent-
atives of the Owner, the project engineer, a representative of the
contractor and any other party assigned by the Owner.
Payment for the work described in Section 2C shall be made on an hourly
basis as further described in Section 3 of this Agreement.
Section 3. Compensation
Compensation for the various types of services to be provided under this con-
tract shall be made as follows:
A. Survey and Monument.Rigbt=of-Way. Compensation for right-of-way survey
and monumentation shall be a lump sum fee of $2,500,00. This fee includes
full compensation for every item of work described in Section 2A of this
Agreement, payable upon completion of the work.
B. Prepare Preliminary Engineering Report and Detail Design. Compensation
for design engineering services shall be a fixed fee of $9,854,36. This
fee includes full compensation for every item of work described in
Section 2B. Eighty (80) percent of this fee shall be payable upon accept-
ance of the "red -lined" design of the projects with the remaining twenty
Construction Phase
Compensation for the construction phase of the projects shall be
based on the actual hours of the various classifications of employees
that may be necessary to perform the work. The total fee shall not
exceed $2,440.00 so long as the total construction time for the project
does not exceed 180 working days from the date of Notice to Proceed to
the construction contractor. If the total construction time exceeds 180
working days, then the Engineer shall be compensated for the additional
time a construction inspector is required to be on the project. Payment
to the Engineer shall be made monthly on this hourly basis.
The rates to be charged for the various classifications of personnel
are set out below:
Engineer
Engineering Tech. (Inspector).
Survey Party Chief
Instrumentman
Chainman
Draftsman
$31.00/hr
$20.00/hr
$16.75/hr
$12.35/hr
$10.45/hr
$15.75/hr
Secretary. . . . . . . . . $ 9
Section 4. General Considerations
A. Termination of Contract for Cause
.50/hr
If, through any cause, the Engineer shall fail to fulfill in timely and proper
manner his obligations under this contract, or if the Engineer shall violate any
of the covenants, agreements, or stipulations of this contract, the Owner shall
thereupon have the right to terminate this contract by giving written notice to the
Engineer of such termination and •specifying the effective date thereof, at least
five days before the effective date of such termination. In such event, all finish
or unfinished documents, data, studies, and reports prepared by the Engineer under
this contract shall,. at the option of the Owner become its property, and the
Engineer shall be entitled to receive just and equitable compensation under this
contract for any satisfactory work completed on such documents.
Notwithstanding the above, the Engineer shall not be relieved of liability
to the Owner for damages sustained by the Owner by virtue of any breach of the
contract by the Engineer, and the Owner may withhold any payments to the Engineer
for the purpose of setoff untilsuch time as the exact amount of damages due the
Owner from the Engineer is determined.
B. Termination for Convenience of Owner
The Owner may terminate this contract
Owner to the Engineer. If the contract is
herein, the Engineer will receive just and
C. Changes
any time by a notice in writing from the
terminated by the Owner as provided
equitable compensation under this contrac
The Owner may, from time to time, request changes in the scope of the services
of the Engineer to be performed hereunder. Such changes, including any increase
or decrease in the amount of the Engineer's compensation, which are mutually agreed
upon by and between the Owner and the -Engineer, shall be incorporated in further
written amendments to this contract.
D. Personnel
1. The Engineer represents that he has, orwill secure at his own expense,
all personnel required in performing the services under this contract. Such
personnel shall not be employees of or have any contractual relationship with the
Owner.
2. All the services required hereunder will be performed by the Engineer or
under his supervision and all personnel engaged in the work shall be fully qualified
and shall be authorized or permitted under state and local law to perform such
services.
3. No person who is serving sentence in a penal or correctional institution
shall be employed on work under this contract.
E. Compliance with Local Laws
The Engineer shall comply with all applicable laws, ordinances, and codes of
the state and local governments and shall commit no trespass on any public or pri-
vate property in performing any of the work embraced by this contract.
F. Assignability
The Engineer shall
fer any interest in the
written approval of the
become due the Engineer
bank, trust company, or
without such approval.
promptly to the Owner.
not assign any interest in this contract and shall not trans:
same (whether by assignment or novation) without the prior
Owner; provided, however, that claims for money due or to
from the Owner under this contract may be assigned to a
other financial institution, or to a trustee in bankruptcy,
Notice of any such assignment or transfer shall be furnished
G. Access to Records
The Owner, the U. S. Department of Housing and Urban Development, the Compt-
roller General of the United States, or any of their duly authorized representatives,
shall have access to any books, documents, papers and records.of the Engineer doing
work under this contract which are directly pertinent to a specific grant program
for the purpose of making audit, examination, excerpts, and transcriptions.
Estimates
Since Engineer has no control over the cost of labor, materials or equipment,
or over the methods of determining prices, or over competitive bidding or market
conditions, the estimates of cost provided are to be made on the basis of Engineer's
experience and qualifications and represents his best judgment, being familiar with
the industry, but Engineer cannot and does not guarantee that established costs will
not vary from estimates prepared
Engineer shall secure and maintain such insurance as will protect him from
claims under the workmen's Compensation Acts and from claims for bodily injury,
death or.property damage which may arise from the performance of his services
under this contract.
J. Successors and Assigns
Each party of this contract binds himself and his partners, successors, exec-
utors, administrators and assigns to the other party of this contract in respect
to all covenants of this contract. Neither party shall assign, sublet or transfer
his interest in this contract without the written consent of the other.
•
Section 5. Equal Opportunity Provisions
During the performance of this contract, the Engineer agrees as follows:
A. The Engineer will not discriminate against any employee or applicant for
employment because of race, color, religion, sex, or national origin. The Engineer
will take affirmative action to ensure that applicants are employed, and that
employees are treated during employment, without regard to their race, color, religio
sex, or national origin. Such action shall include, but not be limited to, the
following: employment, upgrading, demotion, or transfer, recruitment or recruit-
ment advertising; layoff or termination; ratesof pay or other forms of compensation;
and selection for training;. including apprenticeship. .The Engineer agrees to post
in conspicuous places, available to employees and applicants for employment, notices
to be provided by the Contracting Officer setting forth the provisions for this non-
discrimination clause.
B. The Engineer will, in all solicitations or advertisements for employees
placed by or on behalf of the Engineer, state that all qualified applicants will
receive consideration for employment without regard to race, color, religion, sex,
or national origin.
Section 6. Conflict of Interest
A. Interest of Owner
No officer, employee, or agent of the Owner who exercises any functions or
responsibilities in the review or approval or in connection with the carrying out
of the project to which this contract pertains shall have any personal interest,
direct or indirect, in this contract.
Interest of Certain Federal Officials
No member of or delegate to the Congress of the United States, and no Resident
Commissioner, shall be admitted to any share or part of this contract or to any
benefit to arise.herefrom.
Interest of Engineer
The Engineer. covenants that he presently has no interest and shall not acquire
any interest, direct or indirect, in the above described project area or any parcels
therein or any other interest which would conflict in any manner or degree with
the preformance of his services hereunder. The Engineer further covenants that in th
performance of this contract, no person having any such interest shall be employed.
Section 7. Other Provisions
In connection with the project, the Owner shall:
A. Give thorough consideration to all documents presented by the Engineer
and inform the Engineer of all decisions within a reasonable time so as not to delay
ther work of the Engineer.
B. Make provision for the employees of the Engineer to enter public and pri-
vate lands as required for the Engineer to perform necessary preliminary surveys
and investigations.
C. Obtain the necessary lands, easements and rights-of-way for the construct-
ion of the work.
D. Furnish the Engineer such plans and records of construction and operation
of existing facilities, or copies of same, bearing on the proposed work as may be
in the possession of the Owner. Such documents or data will be returned to the
Owner upon completion of the work or upon the request of the Owner.
E. Pay the cost of making necessary soundings, borings, analyses of materials
and laboratory work exclusive of the Engineer's supervision thereof.
This agreement shall be binding upon the parties hereto, their partners,.
heirs:, successors, administrators and assigns; and neither party shall assign,
sublet or transfer his interest in this agreement without the prior written consent
of the other party hereto.
IN WITNESS WHEREOF, the Owner has caused these presents to be executed in its
behalf by its duly authorized representatives, and the said Engineer by its duly
authorized representatives, and the parties hereto haveset their hands and seals
on the date heretofore set out.
ATTEST: .:
Ha.r.c15,;-Vice President
CITY OF FFAAYETTEVILLE, ARKANSAS
0)at
Paul_ Noland, Mayor
NORTHWEST ENGINEERS, INC.
Harry G. /tray, President