HomeMy WebLinkAbout22-82 RESOLUTIONRESOLUTION NO; 02V
•
A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK
TO EXECUTE AN AGREEMENT WITH THE ARKANSAS STATE
HIGHWAY AND TRANSPORTATION DEPARTMENT REGARDING
THE FEDERAL BRIDGE REPLACEMENT AND REHABILITATION
PROGRAM.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
That the Mayor and City Clerk are hereby authorized
and directed to execute an agreement with the Arkansas State
Highway and Transportation Department regarding the Federal
Bridge Replacement and Rehabilitation Program. A copy of
the agreement authorized for execution hereby is attached
hereto, marked Exhibit "A", and made a part hereof.
PASSED AND APPROVED this c .day of c;_a itad 1982.
a --
y
.G 4421‘ afen•Alk /11
Ail‘o;i1 011.4
•
ATTEST: 4
CITY CLE
AGREEMENT OF UNDERSTANDING
BETWEEN
THE CITY OF FAYETTEVILLE , ARKANSAS
• AND
THE ARKANSAS STATE HIGHWAY AND
TRANSPORTATION DEPARTMENT
In Cooperation with the
U.S. Department of Transportation
Federal Highway Administration
RELATIVE TO
-The ieplacement`or=rehabilitation of structures -eligible -under the -Federal --
Aid Bridge Replacement and Rehabilitation Program.
WHEREAS, the 1978 Surface Transportation Assistance Act provides 80% Federal -
Aid funds to be matched with 20% local funds for the replacement or rehabilitation
of eligible structures, and
WHEREAS, the City has expressed its desire to participate in the Federal -Aid
Bridge Replacement and Rehabilitation Program, and
WHEREAS, the City understands that the Arkansas State Highway and Transpor-
tation Department will adhere to the General Requirements for recipients and sub -
recipients concerning minority business enterprises as stated on the attachment,
IT IS HEREBY AGREED that the City of Fayetteville , hereafter
referred to as the City, and the Arkansas State Highway and Transportation
Department, hereafter referred to as the Department, in cooperation with the
Federal Highway Administration, will participate in a cooperative bridge replace-
ment or rehabilitation program , and
HEREBY, accept the responsibilities and assigned duties as described hereafter.
---,THE_CITY WILL:
1. Be responsible for satisfactory maintenance and operation of all improvements
not on the Arkansas Highway System. Failure to adequately maintain and
operate the facility in accordance with Federal -Aid requirements will result
in withholding future Federal -Aid bridge funds.
2. Be responsible for 20% of the total project cost, which will include pre-
liminary engineering services, construction engineering services, appraisal
and acquisition of right-of-way, relocation services (when required), and
adjustment of all man-made improvements, including utilities, for bridge
replacement or rehabilitation projects not on the Arkansas Highway System.
3. Be responsible for 100% of all preliminary engineering and other costs
incurred should the City not enter into the construction phase of the project.
•
4. Be responsible for any and all expenditures which may be declared non=
participating, including right-of-way and utilities as discussed 'in Item 2
above; also, where sufficient Federal -Aid funds are not available to the
City.
Submit a letter to the Right -of -Way Division of the Department stipulating
the services relative to right-of-way acquisition, appraisal, relocation,
and utilities that the City will assume, or request that the Department handle
some or all of these services.
6. Transmit to the Department a copy of the Resolution from the City Council
or Board of Directors which requests a project and authorizes the Mayor or
City Manager to execute contracts with the Department for projects on city
streets and bridges.
7. Submit to the Department 5% of the estimated total project cost before
preliminary. engineering begins. •
8. Submit to the Department the local matching share of the estimated right-
of-way and construction costs upon request by the Department.
9. Make no alterations to the improvements constructed under the Federal -Aid
Bridge Replacement and Rehabilitation Program without first consulting with
the Department.
10. Adopt regulations and ordinances as necessary for proper operation of the
improvements.
11. Be responsible for the necessary enforcement of operations as required by
improvements on city streets and bridges.
12. Hereby attest that the employment policies and practices with regard to its
employees, any part of whose compensation is reimbursed from Federal funds
will be without regard to race, color, creed, or national origin.
1
THE ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT WILL:
1: Be responsible for administering Federal -Aid Bridge Replacement and Reha-
bilitation Program funds and for supervision of improvement projects funded
through„the,Federal-AidBridge Replacement and Rehabilitation Program.
2. Provide technical assistance to the City upon request for continuing the
Federal -Aid Bridge Replacement and Rehabilitation Program.
3. Provide technical assistance for developing the necessary plans and
specifications for all Federal -Aid Bridge Replacement and Rehabilitation
projects.
4. When requested, provide the necessary services relative to right-of-way
acquisition, appraisal, relocation, and utility adjustments and will be
reimbursed for costs involved in performing these services.
•
IT IS EURTIIER AGREED that, should the
and assigned duties as related in the
the City from future participation in
Rehabilitation Program
•
City fail to fulfill its tesponsibilities
Agreement, such failure will disqualify
the Federal -Aid Bridge Replacement and
IN WITNESS WHEREOF, the parties thereto have executed this Agreement this 2nd
Day of February. ,
1g £32
A SAS ST
AND T SPORT
HWAY
T FENT
Dir or of Highw
and Transportation
1
CI r iF FAYETTE1(ILLE
IMO ffillallIEM4•m••••••
GENERAL REQUIREMENTS
FOR
RECIPIENTS AND SUBRECIPIENTS
CONCERNING MINORITY BUSINESS ENTERPRISES
It is the policy of the Department of Transportation that minority business
enterprises as defined in 49 CFR Part 23 shall have the maximum opportunity
to participate in the performance of contracts financed in whole or in part
with Federal funds under this agreement. Consequently the MBE requirements
of 49 CFR Part 23 apply to this agreement.
The recipient or its contractor agrees to ensure that minority business enter-
prises as defined in 49 CFR Part 23 have the maximum opportunity to participate
in the performance of contracts and subcontracts financed in whole or in part
with Federal funds provided under this agreement. In this regard all recipients
or:conractors-shall-take-all-necessary_and,reasonahl.e.steps.in•accordance ,
with 49 CFR Part 23 to ensure that minority business enterprises have the
maximum opportunity to compete for and perform contracts. Recipients and their
contractors shall not discriminate on the basis of race, color, national origin,
or sex in the award and performance of DOT -assisted contracts.
If as a condition of assistance the recipient has submitted and the Department
has approved a minority business enterprise affirmative action program which
the recipient agrees to carry out, this program is incorporated into this
financial assistance agreement by reference. This program shall be treated as
a legal obligation and failure to carry out its terms shall be treated as a
violation of this financial assistance agreement. Upon notification to the
recipient of its failure to carry out the approved program the Department shall
impose such sanctions as noted in 49 CFR Part 23, Subpart E, which sanctions may
include termination of the agreement or other measures that may affect the ability
of the recipient to obtain future DOT financial assistance.
The recipient shall advise each subrecipient, contractor, or subcontractor that
failure to carry out the requirements set forth in Subsection 23.43(a) shall
constitute a breach of contract and, after the notification of the Department,'
=_-__ __.may,:result-in termination of the agreement or contract by the recipient or such
remedy as the recipient deems appropriate.
(NOTE: Where appropriate, the term "recipient" may be modified to mean
TTsbrecipient -"-and the term _"contractor".modi.fied..to_include "subcontractor.")_„
•
•
ARKANSAS STATE HIGHWAY
• AND
TRANSPORTATION DEPARTMENT
Henry Gray, Director
Telephone (501) 569-2000
March 17, 1982
Mr. Don Grimes
City Manager
P. 0. Drawer F
Fayetteville, Arkansas 72701
Dear Mr. Grimes:
P.O. Box 2261
Little Rock, Arkansas 72203
RECEIVED
Enclosed is your copy of a fully executed Agreement
in regard to the Appleby Road bridge project. This
submitted to the Federal Highway Administration for
approval by FHWA, the Department will request 5% of
cost for preliminary engineering.
MAR 1 81982
CITY MANAGER'S OFFICE
CITY OF FAYETTEVILLE
of Understanding
project has been
approval. Upon
the total project
The funding of the Skull Creek bridge on North Street has been changed
from Federal -Aid Urban funds to Bridge Replacement funds as previously
requested. Due to limitations on Federal funds, the Old Wire and Old
Missouri Road bridges as listed on your Resolution 1123-82 will be
programmed at a later date as funds become available.
If there are any questions „please advise.
RTL:bs
Enclosure
Sincerely,
eve Teagu
Progra'' i
Schedu
and
ing Engineer