HomeMy WebLinkAbout137-82 RESOLUTIONy
RESOLUTION NO. /3 7 gz
A RESOLUTION RATIFYING EXECUTION OF A CHANGE ORDER
IN THE AMOUNT OF $6,261.00 IN THE CITY'S CONTRACT
DATED OCTOBER 19, 1982 WITH McCLINTON-ANCHOR DIVISION
FOR THE REPAIR OF HILLDALE AND ELIZABETH STREETS.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY
OF FAYETTEVILLE, ARKANSAS:
That the Board of Directors hereby ratifies the action
of the City Manager in executing the change order attached
hereto marked Exhibit "A" and made a part hereof; and the
Board of Directors hereby approves said change order.
PASSED AND APPROVED thiscEe4 day of //./Pe.a.86.e. ,
1982.
4 %
410::
�� .
e
I4:'
t:..;. 4.
—,
.e
ATTEST:
z.Q f,
CITY CLERK /
APPROVED:
MAYOR
•
•
•
•
•
15.01
ACCEPTED: The above prices and specifications of this Change Order are satisfactory and
are hereby accepted. All work to be performed under same terms and conditions as specified
in originai contract unless otherwise stipulated.
Date ///z'• ! • 'ate Signature-.+-•I�J yd
ft
rawas
n
L _'
Milholland Engineering & Surveying
25 East Center Street
FAYETTEVILLE. ARKANSAS 72701
Phone 443.4724
TO
The City of Fayetteville
CHANGE ORDER NO.
One (1)
ADDRESS
P.O. Drawer IF'
DATE
Nov. 8, 1982
Fayetteville_) Arkansas 77702
PHONE
JOB NAME AND LOCATION
Flood Damage Project,
Priority No. 2,
JOB NUMBER
E-162
flilldale & Elizabeth Sts., Fayetteville, AR.
DATE OF EXISTING CONTRACT
Oct. 19, 1980
Due to unforeseen construction problems, the
items shall be modified as follows:
--'Bid Item #3:B --extra surface removal, increase---
Lump Sum bid
-Bid Item #4.B - change street construction
8"
following bid
-----
$ 200.00
from
SB -2 t--2" Hot Mix to 8" SB -2 base with cement ----------
__.stabalization at 3% + 2" Hot Mix at unit price
of $10.00/S.Y., increase of $2,043.90
-=Bid -Item #5 -.Concrete street pavement, -at unit
_..price of_..$13..50/S.Y..for._additional 297..56 S.Y$4,017.00
-Hillside base material as needed & directed by
-Engineer at -unit-
price of $ 00/Truck Yard in-__cluding-undercut &,disposal $ 000.00
.TOTAL INCREASE IN CONTRACT PRICE $6,260.90_
Engineer Date
Note: This revision becomes part of, and in conformance with. the existing contract.
WE AGREE hereby to make changes as specified above, at this price $
6,260
.90
Date//. - u
PREVIOUS
CONTRACT
$ 22,322
AMOUNT
.91
er je / /[ ` /' .2-:,--./ '' /
+•'�'v�rl
REVISED
P cClinton-AI
e leffecDf•P9%e2on
.
CONTRACT
TOTAL
$
28, 583.1 1
ACCEPTED: The above prices and specifications of this Change Order are satisfactory and
are hereby accepted. All work to be performed under same terms and conditions as specified
in originai contract unless otherwise stipulated.
Date ///z'• ! • 'ate Signature-.+-•I�J yd