Loading...
HomeMy WebLinkAbout137-82 RESOLUTIONy RESOLUTION NO. /3 7 gz A RESOLUTION RATIFYING EXECUTION OF A CHANGE ORDER IN THE AMOUNT OF $6,261.00 IN THE CITY'S CONTRACT DATED OCTOBER 19, 1982 WITH McCLINTON-ANCHOR DIVISION FOR THE REPAIR OF HILLDALE AND ELIZABETH STREETS. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Board of Directors hereby ratifies the action of the City Manager in executing the change order attached hereto marked Exhibit "A" and made a part hereof; and the Board of Directors hereby approves said change order. PASSED AND APPROVED thiscEe4 day of //./Pe.a.86.e. , 1982. 4 % 410:: �� . e I4:' t:..;. 4. —, .e ATTEST: z.Q f, CITY CLERK / APPROVED: MAYOR • • • • • 15.01 ACCEPTED: The above prices and specifications of this Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in originai contract unless otherwise stipulated. Date ///z'• ! • 'ate Signature-.+-•I�J yd ft rawas n L _' Milholland Engineering & Surveying 25 East Center Street FAYETTEVILLE. ARKANSAS 72701 Phone 443.4724 TO The City of Fayetteville CHANGE ORDER NO. One (1) ADDRESS P.O. Drawer IF' DATE Nov. 8, 1982 Fayetteville_) Arkansas 77702 PHONE JOB NAME AND LOCATION Flood Damage Project, Priority No. 2, JOB NUMBER E-162 flilldale & Elizabeth Sts., Fayetteville, AR. DATE OF EXISTING CONTRACT Oct. 19, 1980 Due to unforeseen construction problems, the items shall be modified as follows: --'Bid Item #3:B --extra surface removal, increase--- Lump Sum bid -Bid Item #4.B - change street construction 8" following bid ----- $ 200.00 from SB -2 t--2" Hot Mix to 8" SB -2 base with cement ---------- __.stabalization at 3% + 2" Hot Mix at unit price of $10.00/S.Y., increase of $2,043.90 -=Bid -Item #5 -.Concrete street pavement, -at unit _..price of_..$13..50/S.Y..for._additional 297..56 S.Y$4,017.00 -Hillside base material as needed & directed by -Engineer at -unit- price of $ 00/Truck Yard in-__cluding-undercut &,disposal $ 000.00 .TOTAL INCREASE IN CONTRACT PRICE $6,260.90_ Engineer Date Note: This revision becomes part of, and in conformance with. the existing contract. WE AGREE hereby to make changes as specified above, at this price $ 6,260 .90 Date//. - u PREVIOUS CONTRACT $ 22,322 AMOUNT .91 er je / /[ ` /' .2-:,--./ '' / +•'�'v�rl REVISED P cClinton-AI e leffecDf•P9%e2on . CONTRACT TOTAL $ 28, 583.1 1 ACCEPTED: The above prices and specifications of this Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in originai contract unless otherwise stipulated. Date ///z'• ! • 'ate Signature-.+-•I�J yd ft rawas n L _'