HomeMy WebLinkAbout132-82 RESOLUTION•
•
RESOLUTION NO. i OoZ
•
r
A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO
EXECUTE A CONTRACT WITH MILHOLLAND COMPANY FOR ENGINEERING
SERVICES NECESSARY TO REPAIR FLOOD DAMAGE TO TOWNSHIP
ROAD, TRUST STREET, OLD WIRE ROAD, AND OLD MISSOURI
ROAD.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
That the Mayor and City Clerk are hereby authorized and
directed to execute a contract with Milholland Company for
engineering services necessary to repair flood damage to
Township Road, Trust Street, Old Wire Road and Old Missouri
Road. A. copy of the contract authorized for execution
hereby is attached hereto, marked Exhibit "A", and made a
part hereof.
PASSED AND APPROVEDTHIS DAY OF O.ae[, 1982.
ATTEST:
; G
;;By
_ aCity,. Clerk
e. . 4 r.
tea.. Z1', elm r
LP�
By 2C a1P
Mayor
•
FAYETTEVILLE, ARKANSAS
October 21, 1982
P. 0. DRAWER F
Mr. Melvin Milholland
Milholland Company
205 W. Center Street
Fayetteville, Arkansas 72701
Dear Mel:
OFFICE OF CITY MANAGER
72702
The Fayetteville City Board of Directors, at their regular meeting held
October 19, 1982, authorized the preparation of plans and specifications
for priorities four (4), five (5), six (6), and seven (7) an the flood
damage project priority list. Therefore, it will be sincerely appreci-
ated if you will proceed with this work as rapidly as possible. This
work should be done so sealed competitive bids can be received for con-
struction.
The city directors asked that you look at the various alternative methods
available for solving the problems. We would like to keep our costs at
a minimum and it was suggested that you might look at sheet piling in-
stead of a retaining wall on Township Road.
Please feel free to contact me if you have any questions.
Sincerely yours,
Donald L. Grimes
City Manager
DLG:tm
cc Clayton Powell,
Street Superintendent
(501) 521-7700
AGREEMENT FOR ENGINEERING SERVICES
— Job[No. E-162
J
THIS AGREEMENT made this L /✓ day of L), 1982 by and
between The City of Fayetteville, Arkansas
acting herein by and through
its Manager who is duly authorized so to act and in behalf of said
_ Parties , hereinafter called the Client, and Milholland Engineering and
Surveying Company Engineers, a Company consisting of Melvin L. Mil -
holland, P.E., hereinafter called the Engineer.
WHEREAS, The Client desires to employ the Engineer to furnish Engineering
Services for miscellaneous flood damaged areas and sotrm sewer structures
within the City of Fayetteville , the Client's Projects' services consist
of engineering, surveying, inspection, and construction management as
directed by the City Management. Projects are taken from master list and
and the City reserves the right to add to and/or delete from said list as
deemed. .
necessary by the City Management.
WHEREAS, the Engineer has made a verbal agreement for the aforesaid
engineering work on September 2, 1982, by and between
City Street Superintendent, and Melvin L. Milholland
Clayton Powell,
e
and conditions including fees satisfactory to the Client. Services
the terms
rendered
shall be compensated by the hour per attached "Exhibit A," plus out-of-pocket
expenses plus 25c per mile for travel expenses plus fees for review required
by governing authorities.
NOW THEREFORE, THIS AGREEMENT WITNESSETH: That for and in consideration
of the mutual covenants and promises between the parties hereto, it is hereby
agreed that the Engineer shall furnish engineering plans and specifications
and the Client shall make payment for same in accordance with the terms and
conditions set forth in this Agreement and itemized on "Exhibit A," which
said Exhibit is attached hereto and is hereby made a part thereof.
IN WITNESS WHEREOF, the Owner has caused these presents to be executed
in its behalf by its duly authorized representatives, and the said Engineer
by its duly authorized representatives, and the parties hereto have set
their hands and seals on the date heretofore set out.
•
•
ATTEST:
ATTEST:
:tea
la Ts
ATTEST:
CITY OF FAYETTEVILLE, ARKANSAS
Donald gyp. Grimms, City Manager
MILHOLLAND ENGINEERING & SURVEYING CO.
Melvin L. Milholland, Owner
s.
ti 5.`
"EXHIBIT A"
PROFESSIONAL SERVICE FEE SCHEDULE:
1. Survey Crew: 3 men @ $45.00 per hour
2 men @ $37.50 per hour.
2. Draftsman: 1 man @ $15.00 per hour.
3. Professional Engineer: $40.00 per hour.
4. Engineer's Aide: $25.00 per hour.
5. Inspector: $18.00 per hour.
6. Office Computations: 1 man with computor @ $30.00 per hour.
7. Research & Compiling Data: 1 man @ $15.00 per hour.
8. Secretary: $10.50 per hour.
9. Printing: 81/2" x 11" @ 15c per sheet;
Blue prints @ $1.50 per sheet (any size).
10. Mileage: 25c per mile.
11. Actual Out -of -Pocket Expenses: Such as phone calls, etc.
INVOICE & PAYMENT SCHEDULE:
1. A Retainer of $000.00 in advance.
2. Actual services perfromed to be invoiced to the 1st of each month,
and paid by the 10th ofthe same month. After due date, interest
shall accumulate at 10% annual.
At such time services of the Engineeris terminated in writing,
the retainer, less services performed, will be refunded within
21 days of receipt of written Notice from the Client.