RESOLUTION NO. /.30'2a
•
A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO
EXECUTE A CONTRACT WITH McCLINTON-ANCHOR DIVISION OF
APAC-ARKANSAS, INC. FOR FLOOD DAMAGE REPAIRS TO
ELIZABETH STREET AT A TOTAL CONTRACT PRICE OF $48,527.54.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
That the Mayor and City Clerk are hereby authorized and
directed to execute a contract with McClinton -Anchor Division
of APAC-Arkansas, Inc. for the repair of flood damage to
Elizabeth Street at a total contract price of $48,527.54.
A copy of the contract authorized for execution hereby
is attached hereto, marked Exhibit "A" and made a part hereof.
PASSED AND APPROVED this /¢moi day of DCitSBcssC , 1982.
i ^ Y!�
4
'
:
FATTEST:` "•
By:
4
APPROVED:
•
By:
(71E)ed tiaLlY
Mayor
•
1
PRIORITY NO. 1 - ELIZABETH & MEADOWCLIFF
BID ITEMS
1. Remove and dispose of existing broken asphalt pavement, 72 L.F. (t)
curb & gutter, base, and preparation of subgrade to City Standards+
all material testing included; for concrete pavement; 145.00 C.Y.(-)
Go
@ (NINE Muni/fess FIFTY DeUaasr1L.szniff ($ RSO
) Lump Sum
2. *Concrete street pavement to City of Fayetteville Standards -
747.75 S.Y. @ 7E/iprt DoltAll Any Ce..ga.($ /3 SO
) per S.Y.
3. Re-route drainage ditch to new storm box, approximately 40 L.F.,
and build-up low side where existing ditch is located - Lump Sum
4. Construct new concrete curb & gutter - 72 L.F. @
FIVE DtLLbsg.1.7-Jo CRn►7s ($ S. b°
5. Storm Sewer Construction:
A. 16 ga. asphalt coated, 24" CMP - 176 L.F. @
) per L.F.
�R If D6L�PQS rig ['.ENfS
0-3_0 $21-j ) per L.F.
B . 14 ga. asphalt coated & plugged, 18" CMP - 240 L.F. @
EL1ler ELM p..LtAks , 1Jo CENT; ($ j $ ao
C. Construct concrete headwall - 1 each @
) per L.F.
gEvtw }NuNen.ED Diapts I N+_ CENT/ ($ 700 Q2 ) per each.
D . Construct concrete storm box - 1 each @
FtMer Huwo.so boLlAts, Alb CEAES ($ $DO �`• )
per each.
E . Construct concrete junction box with CI ring & lid - 1 each @
a
($ 700 ) per each.
**F.
SEUE►N iiy-Noai °SALL Al. Otto,
SB -2 base backfill under streets - 250 tons @
TEN D viLARtig.• C•ESs
TOTAL BID - PRIORITY NO. 1
(Qs
) per ton.
**NOTE: Per Tickets Signed By Engineer's Representative.
*NOTE: Concrete street paving shall be mechanicaly placed.
-14A-
$ 950,00
s /(1,09w.63
$ SOO.00
$1212J1Q____
s SaSQs o0
s X1,-3.20. o
s 'IOO. oo
$ Soca. tso
$ 700.00
s a,SOo. UQ
PRIORITY NO. 2 - HILLDALE & ELIZABETH
BID ITEMS
1. Match existing asphalt overlay on Centerwood Road at intersection
with Hilldale - 278.06 S.Y. @
Iwo DoLLAtc ANO '1•EN C Mtt
($ r� 10 ) per S.Y.
—g $ 583.C13
2. Remove & dispose of curb inlets tops , and replace with similar
concrete tops with standard cast iron ring & lids - 7 each @
TLae WAHLQ w NINry AeLLnas No GE JTL ($ ago (` ) per
each.
3. Remove & dispose of existing broken, asphalt pavement & sub -base;
preparation of subgrade to City Standards; all material testing
included:
A. 1. Asphalt surface with P.Z. of 10 or less, prepare for 6"
SB -2 base - 340.71 C.Y. disposed material @
NINETtEn 11iasnttD DcLLAR& No ($ 1 CI 0 b tL) Lump Sum. $ 1 9 CO. 60
„p4" f
OR 2. Asphalt surffce with P.I. of 10 plus, prepare for 8" SB -2
base - 417.9- C.Y. disposed material @_ _=^ two
7wtxry-&sE NaaMD*CO D.u4a_s Al. ($ x140 Q." ) Lump sum $ LO�Js GU,_
LEN7J 21,
B. *Concrete Surface: prepare for 6" concrete pavement - 56.2 C.Y.
00
@ruga Mania fl• tiapas A. Plete=gEole ($ goo-- ) Lump Sum $ L106.00.
Cha fo
4. Asphalt street pavement to City of Fayetteville Standards:
A. 6" SB -2 base plus 2" hot mix - 1,362.6 S.Y. @
f EVE►{_jZpL»Rs Fon!' CENT4 ($ 1 i ) per S.Y. $ !00 o s a4
OR B. 8" SB -2 base plus 2" hot mix - 1,362.6 S.Y. @
r
E,r147 °etches Fbcvv cines ($ 8 5 ) per S.Y. $ "1 sa. /0
5. Concrete street pavement to City of Fayetteville Standards -
290.88 S.Y. @6
DHIRT�N' P•LLAM Any $ 13 -- ) per S.Y. $ 3, 93,%. al
CiAnU
6. Construct One (1) drop inlet to City of Fayetteville Standards
on West side of Elizabeth Ave. at Hilldale intersection @
00 �j
�jyygo2L,A Dolt&Es No GENT, ($ ROO --- ) per each. $ ROO. as
7. Throughly clean all storm boxes, inlets, & storm sewer pipe with-
in
4
limits of project @
SEVIN (4a.NDCLIC) PMN /ALOIS Nu cum ($ ISD ) Lump Sum.
*NOTE: Concrete street paving shall be mechanically placed.
-14B-
730•0o
(Priority No. 2 - Bid Items coni.)
8. Repair bottom of existing storm sewer junction box at inter-
section of Hilldale and Elizabeth - 1 each @
P)uP ilatan ,flf3Y dul,r,aa,s go CE►fji_($ 150 414a ) per each.
$ ISO. 0O
TOTAL BID - PRIORITY NO. 2 (A.) With 6" SB -2 plus 2" hot mix-$ a04ad.o
OR (B.) With
SB -2 plus 2" hot
67e7744 C`onlZracf /price = ,410'5, 527. 5¢)
It is understood that any utility requiring adjustments or relocation
due to interference with construction work on this project (Priorities No. 1
and No. 2) will be performed at the owners expense.
MOCLINTON-ANCIDR 0 *iPANY
10/12/82 DIVISION OF APAC-ARKANSAS,.ITJC "7
Iv w mEDc
VICE PRESIDENT
-14C-
•
•
6on*Ac
&zy«ee r I9 and fatofyi�
205 WEST CENTER
FAYETTEVILLE, ARKANSAS 72701
1501) 443-4724
FLOOD DAMAGE PROJECT
FOR
THE CITY OF FAYETTEVILLE, ARKANSAS
51
AR..R.L.S. NO. 648
AR. P.E. NO. 3825
OKLA. P.E. NO. 10740
OKLA. R.L.S. NO. 1038
*PRIORITY NO.
1.
ITEM NO.
PROJECT **ESTIMATED CONSTRUCTION COST
16. Elizabeth St. at Meadow
Cliff intersection:
Repair flood damage to
incorporate drainage con-
trol structure west to
easement going N & S.
2. 51. Elizabeth & Hilldale in-
tersection: Total recon-
struction of 600' of street,
construct drainage structure
west to north/south easement
to control drainage.
$45,000.00
$45,000.00
3. Not Virginia St. drainage strut- $15,000.00
Listed ture previously a2proved by
the Board of Directors.
4. 18. Township Rd.: From Jane St. $30,000.00
east, construct retaining
wall in place of collasped
block wall.
- 5. '"'52. ' Unpaved streets (Trust St.) $20,000.00
total construction of street
and drainage structure to
prevent re-occurance of chro-
nic drainage problems.
6. 24. Old Wire Rd. Bridge east of $25,000.00
Hwy. 265 (not in federal
bridge program at this time).
7. 49. Old Missouri Rd. north of $20,000.00
Stubble Field Rd. intersection,
deepen, re -channel ditch and
replace wall.
Page 1
8. 35. Williams St. repair wash- $24,000.00
out, add tile, curb & gutter,
and overlay.
9. 17. Hilldale & Stanton Sts.: $15,000.00
re -construct intersection
and repair sunken spill-
ways.
10. 20. Johnson & Walnut intersec- $25,000.00
tion: drops, slope pipe,
re -pave street sections &
intersection.
11. 29. Center St. west of Razor- $28,000.00
back Rd , construct con-
struct box culvert for _.
drainage control.
12. 36. Green Acres Rd., repair $15,000.00
shoulders erosion, clean
ditch, storm drain, curb
& gutter, and overlay.
•
*NOTE 1: Projects are taken from master list submitted for diaster relief
aid, and the City reserves the right to add to and/or delete from
said list as deemed necessary by City Management.
**NOTE 2: The above estimated construction costs were determined and sub-
mitted by the City for a Diaster Relief Aid Grant.
•
Page 2
TO
Milhollagd Engineering & Surveying
ZOSGC/• TA. Genter Street
FAYETTEVILLE, ARKANSAS 72701
Phone 443-4724
Yom. Antti 'F'
7n1.217 t c , 7Z7D Z
•
GENTLEMEN:
WE ARE SENDING
❑/Shop drawings
'Copy of letter
LETrUE
: OF UM IMMOfliaLL
JOB NO.
r —/loZ
ATTE TION
(0•46 -4(A ->t 11C -Lip
7 C J' »u,ia �} LAG t
DAT
ozr. /S /987.
RE:
YOU 'Attached 0 Under separate cover via the following items:
O Prints
❑ Change order
0 Plans
0 Samples
0 Specifications
COPIES
DATE
NO.
DESCRIPTION
F//?
„
7.0
A
nn
/1.
/-/Z et ag/
2l,
r,
/
/%//8z
-44 MA A
; PALO., ,
.t.d -¢, .S &, d 7.
inC
1.
THESE ARE TRANSMITTED as
O /For approval 0 Resubmit copies for approval
rE/FFor your use 0 Submit copies for distribution
IB' As requested 0 Returned for corrections 0 Return corrected prints
❑ For review and comment '❑
❑ FOR BIDS DUE 19 0 PRINTS RETURNED AFTER LOAN TO US
checked below:
❑ Approved as submitted
❑ Approved as noted
REMARKS -
COPY TO
FORM 240-3 Available from (n/ Townsend. Masa. 01469
SIGNED:
It enclosures are not as noted, kindly notify us at once.
C
•
FAYETTEVILLE, ARKANSAS
OFFICE OF CITY MANAGER
October 21, 1982
P. 0. DRAWER F
Mr. Melvin Milholland
Milholland Company
205 W. Center Street
-Fayetteville, Arkansas. 72701
Uear Mel:
72702 (501) 521.7/00
The Fayetteville City Board of Directors, at their regular meeting held
October 19, 1982, authorized the preparation of plans and specifications
for priorities four (4), five (5), six (6), and seven (7) on the flood
damage project priority list. Therefore, it will be sincerely appreci-
ated if you will proceed with this work as rapidly as possible. This
work should be done so sealed competitive bids can be received for con-
struction.
The city directors asked that you look at the various alternative methods
available for solving the problems. We would like to keep our costs at
a minimum and it was suggested that you might look at sheet piling in-
stead of a retaining wall on Township Road.
Please feel free to contact me if you have any questions.
Sincerely yours,
z,✓
Donald L. Grimes
City°Manager —'
DLG:tm
cc Clayton Powell,
Street Superintendent
THIS AGREEMENT, made this
CONTRACT
19th day of October
and between The City of Fayetteville, Arkansas
(Corporate Name of Owner)
"Owner," acting herein through its
and APAC-Arkansas,
STRIKE OUT
INAPPLICABLE
TERMS
of Fayetteville
04
19 82, by
herein called
(Title of Authorized Official)
Inc.,. McClinton -Anchor Division
(a corporation) (xaxpaxiasxakip)
(aaxiakixiAmmixdziagxkaaiaeasxas
County of Washington , and State of Arkansas
, hereinafter called "Contractor."
WITNESSETH: That
hereinafter mentioned,
hereby agrees with the
as follows:
for and in consideration of the payments and agreements
to be made and performed by the OWNER, the CONTRACTOR
OWNER to commence and complete the construction described
Street and Storm Sewer Repairs per Bid Items,, Fayetteville Flood
Damage Project, Priorities No. 1 and No. 2.
hereinafter called the project, for the sum of Forty -eight -thousand -five -hundred -
twenty -seven & 54/100ollars ($48,527.54 ) and all extra work in con-
nection'therewith, under the terms as stated in the General and Special Con-
ditions of the Contract; and at his (its or their) own proper cost and expense
to furnish all the materials, supplies, machinery, equipment, tools, superin-
tendence, labor, insurance, and other accessories and services necessary to com-
plete the said project in accordance with the conditions and prices stated in
the Proposal, the General Conditions, Supplemental General Conditions and Special
Conditions of the Contract, the plans, which include all maps, plats, blue prints,
and other drawings and printed or written explanatory matter therof, the speci-
fications and contract documents therefor as prepared by Milholland Engineering &
Surveying Company , herein entitled the Ammhdms/Engineer, and as
enumerated in Paragraph 1 of the Supplemental General Conditions, all of which are
made a part hereof and collectively evidence and constitute the contract.
The Contractor hereby agrees to commence work under this contract on or
before a date to be specified in a written "Notice to Proceed" of the Owner and
to fully complete the project within 45 consecutive calendar days thereafter.
The Contractor further agrees to pay, as liquidated damages, the sum of $ 150.00
for each consecutive calendar day thereafter.
-17-
•
TheOWNER agrees to pay the CONTRACTOR in current funds for the performance
of the contract, subject to additions and deductions, as provided in the General
Conditions of the Contract, and to make payments on account thereof as provided.
IN WITNESS WHEREOF, the parties -to these presents have executed this contract.
in .six�(6).,counterparts, each.of which shall be deemed an original,. in the year
fr P wb." . )- ,:
andda'y'irs't above mentioned.
•
(Seal) {}
FATTEST• y
A� y
Secretary /City Clerk
Witness
(Seal)
The City of Fayetteville, Arkansas
Owner
By
oaAJ)
MAYOR
Title
.ADAC-Arkansas, Inc.
McClinton -Anchor Division
Contractor
By
Title
'=
PP.T G f ✓ ra
,�r-�
C
"lr: ,;t tom'
�f�� vtria
P.O. Box 1367
Fayetteville, Arkansas 72702
Address and Zip Code
NOTE: Secretary of the Owner should attest. If Coritractor is a
corporation, Secretary should attest.
-18-
•
CERTIFICATE OF OWNER'S ATTORNEY
I, the undersigned; James N. McCord
duly authorized and acting legal representative of
Fayetteville , do hereby certify as
follows:
City of
the
I have examined the attached contract(s) and surety bonds and the manner of
execution thereof, and I am of the opinion that each of the aforesaid agreements
has been duly executed by the proper parties thereto acting through their duly,
authorized representatives; that said representatives have full power and
authority to execute said agreements on behalf of the respective parties named
thereon; and that the foregoing agreements constitute valid and legally binding
obligations upon the parties executing the same in accordance with terms,
conditions and provisions thereof.
Date: 10/19/82
-19-
/ 3v -Fa_
Milholland Engineering & Surveying
205 West &SaVe ter Street
FAYETTEVILLE, ARKANSAS 72701•
Phone 443-4724
TO Olivia Kelly, City Clerk
P 0. Drawee 'F'
Fayetteville, Arkansas 72702
GENTLEMEN:
ocflcEa of T
EniMMITMEL
DATE
November 3, 1982
JOB NO.
E-162
ATTENTION
Olivia Kelly, City Clerk
RE:
Flood Damage Project
Priorities No. 1 and No. 2
Fayetteville, Arkansas
Original
10/19/82
WE ARE SENDING YOU PCI Attached 0 Under separate cover via
❑ Shop drawings 0 Prints
❑ Copy of letter 0 Change order Yj Certificate
0 Plans
the following items:
0 Samples 0 Specifications
COPIES
DATE
NO.
DESCRIPTION
Original
10/19/82
Certificate of Ownerts Attorney
44
[-
/U�
i
l)
THESE ARE TRANSMITTED as checked below:
❑ For approval 0 Approved as submitted 0 Resubmit copies for approval
❑ For your use 0 Approved as noted 0 Submit copies for distribution
IN As requested 0 Returned for corrections 0 Return corrected prints
❑ For review and comment 0
❑ FOR BIDS DUE 19 0 PRINTS RETURNED AFTER LOAN TO US
REMARKS
COPY TO File
FORM 2403 Available from (MEW] Townsend, Mass, 04469
SIGNED
If enclosures ere not as noted, kindly notify us at o
Mulholland Engineering & Surveying
205 West7Q',"terftertreet
FAYETTEVILLE, ARKANSAS 72701
Phone 443-4724
TO Olivia Kelly, City Clerk
P.O. Drawer 'F'
Fayetteville, Arkansas 72702
GENTLEMEN:
LEMN OF Y. G1R9pri0TYAd
OATE
November 3, 1982
JOB N�
E-162
ATTENTION
Olivia Kelly City Clerk
RE:
Flood Damage Project
Priorities No. 1 and No. 2
Fayetteville, Arkansas
Contract between McClinton -Anchor and City of Fayetteville
WE ARE SENDING YOU N Attached )axlioneoszeaultenomexvia Hand Carried the following items:
❑ Shop drawings 0 Prints 0 Plans 0 Samples 0 Specifications
❑ Copy of letter 0 Change order
II Contract
COPIES
DATE
NO.
DESCRIPTION
Original
10/19/82
Contract between McClinton -Anchor and City of Fayetteville
THESE ARE TRANSMITTED as checked below:
❑ For approval
❑ For your use
LX As requested
❑ Approved as submitted
❑ Approved as noted
❑ Returned for corrections
❑ Resubmit
❑ Submit
❑ Return
copies for approval
copies for distribution
corrected prints
❑ For review and comment 0
❑ FOR BIDS DUE 19 0 PRINTS RETURNED AFTER LOAN TO LIS
REMARKS Per your request on the above date, and in accordance with City of Fayetteville
Regulations, our office is providing you with the Original Contract between APAC-Arkansas,
Inc. McClinton -Anchor Division, and the City of Fayetteville on the Flood Damage Prosect,
Priorities No. 1 and No. 2, Fayetteville, Arkansas.
COPY TO File.
FORM 240-3 AraNEle from /N s/Tawmona. Mass. 01489
SIGNED:
If enclosures are not es noted, kindly notify us at once.
rfr -V. le a /0
ACCEPTED: The above prices and speEifications of this Change Order are satisfactory and
are hereby accepted. All work to be performed under same terms and conditions as specified
in original contract unless otherwise stipulated.�/'`J
Date - / t signature /j// 7 v,_��.L /` •e�/+a�fn�
H
!r
0
Ci
l°MOOR
0
o
m
Milholland Engineering & Surveying
25 East Center Street
FAYETTEVILLE ARKANSAS 72701
Phone 443-4724
TO
The City of Fayetteville
CHANGE ORDER NO.
One (1)
ADDRESS
P.O. Drawer 'F'
DATE
Nov. 8, 1982
Fayetteville Arkansas -77702
PHONE
JOB NAME AND LOCATION
Flood Damage Project, Priority No. 2,
JOB NUMBER
E-162
_Hilldale & Elizabeth Sts., Fayetteville, AR.
DATE OF EXISTING CONTRACT
Oct. 19, 198;
Due to unforeseen construction problems, the following bid
items shall
etid-item-#3:B--
be modified
as follows:
-surface
increase
extra -removal,
Lump Sum bid:n. $ 200.00
-Bid Item #4.B - change street construction from
--8"-SB-2-+-2" Hot 8"
stabalization
Mix to -SB -2 -base -with -cement ----
at 3% + 2" Hot Mix at unit price
/of $10.00/S.Y., increase of $2,043.90
-
=Bid Item-#5—Concrete-street-pavement, at unit
price of $13.50/S.Y. for additional 297.56 S.Y$4,017.00
-Hillside base material as needed &'directed by
-Engineer -unit -price
et of-$$00/Truck-Yard-i-n- ----
cluding undercut & disposal $ 000.00
TOTAL_INCREASE INNNCCONTRACT PRICE
$6,260.90
L_/
%�--vim ,,/
-CG/O dG -
I
Engineer Date
Note: This revision becomes part of. and in conformance with. the existing contract.
WE AGREE hereby to make changes as specified above, at this price $
64,260
.90
Date 1/..�/ f v
' PREVIOUS
WAMOUNTT
$ 22,322
.91.
/� _ i
0.lop
REVISED
coTOTAL RACT
$ 28, 583.61
cC iA40 WEA000n
ACCEPTED: The above prices and speEifications of this Change Order are satisfactory and
are hereby accepted. All work to be performed under same terms and conditions as specified
in original contract unless otherwise stipulated.�/'`J
Date - / t signature /j// 7 v,_��.L /` •e�/+a�fn�