A RESOLUTION APPROVING A $2,928.20 CHANGE ORDER
IN THE CITY'S WATER LINE RELOCATION CONTRACT WITH
KRAUS CONSTRUCTION COMPANY TO PROVIDE FOR THE
INSTALLATION OF BLOW -OFFS ON DEADEND LINES AND TO
PROVIDE FOR THE INSTALLATION OF ADDITIONAL BORE
AND CASING.
•
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY
OF FAYETTEVILLE, ARKANSAS:
That the Mayor and City Clerk are' hereby authorized and
directed*to execute the change order attached'hereto, marked
Exhibit "A" and made a part hereof.
PASSED AND APPROVED this /q$4 day of OC742S froc , 1982.
ATTEST:6
t • C
• ♦ .. art .. I
By : „iota
City -Clerk
.
e-ef
'APPROVED:
„act 9.s -d7
Mayor
•
•
CHANGE NO. 1
Relocation and Adjustment of Water & Sewer Facilities
Fayetteville, Arkansas
Arkansas Highway Job No. 4705
Plan No. FY -92
•
The contract, dated June 24, 1982, between the City of Fayetteville,
Arkansas, and Kraus Construction Company, of Ft. Smith, Arkansas, is hereby
changed to provide for the installation of blow -offs on the dead-end lines so
that the project will comply with Arkansas Health Department requirements.
Also, the installation of an additional 10 feet of bore and casing at highway
station 115+75 to extend the casing to the edge of a box culvert that is to
T— be-built=bytthe'highway-contractart- The!following bid'item-quantities are '''
hereby added to the Proposal:
31. ADD 6 each, Blow -off and flushing stations
@$400.00 each = $2,400.00
32. ADD 10 L.F. 16 inch casing installed to grade
@$52.82/L.F. = 528.20
Net addition to Contract, this Change Order No. 1 = $2,928.20
Total Contract Price
Net Increase Change Order No. 1
Total Contract Price, including
All other provisions of the Contract
Approved this
Engineer:
»9
day of
McGoodwin, Williams,
and Yates, Inc.
= $629,626.85
= 2,928.20
Change Order No. 1 = $632,555.05
remain in force.
/4 , 1982.
Contractor: Kraus Construction
Compan
Joe
Tarvin, P E.
Alvin L. Prieur, P.E.
Owner: City of Fayetteville
VaeteqPaul R. yor
FAYETTEVILLE, ARKANSAS
P.O. DRAWER F
CITY ENGINEER'S OFFICE
TO: Board of Directors
FROM: : City Engineer
SUBJECT: Change Order No. 1 - Relocation of Water Line Farmington
DATE: October 11, 1982
72701 (501)521-7700
Attached is a copy of Change Order #1 in connection with the
water line relocations through Farmington. Item 31, the blow -off
and flushing stations were required by the Arkansas Health Department
and adds $ 2,400.00 to the contract. Item 32, 16 -inch encasement,
was required by the Arkansas Highway Department and adds $ 528.20 to
the contract.
I recommend approval of the Change Order.
•