HomeMy WebLinkAbout128-82 RESOLUTION• • RESOLUTION NO. ":22-84 A RESOLUTION APPROVING A $2,928.20 CHANGE ORDER IN THE CITY'S WATER LINE RELOCATION CONTRACT WITH KRAUS CONSTRUCTION COMPANY TO PROVIDE FOR THE INSTALLATION OF BLOW -OFFS ON DEADEND LINES AND TO PROVIDE FOR THE INSTALLATION OF ADDITIONAL BORE AND CASING. • BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are' hereby authorized and directed*to execute the change order attached'hereto, marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this /q$4 day of OC742S froc , 1982. ATTEST:6 t • C • ♦ .. art .. I By : „iota City -Clerk . e-ef 'APPROVED: „act 9.s -d7 Mayor • • CHANGE NO. 1 Relocation and Adjustment of Water & Sewer Facilities Fayetteville, Arkansas Arkansas Highway Job No. 4705 Plan No. FY -92 • The contract, dated June 24, 1982, between the City of Fayetteville, Arkansas, and Kraus Construction Company, of Ft. Smith, Arkansas, is hereby changed to provide for the installation of blow -offs on the dead-end lines so that the project will comply with Arkansas Health Department requirements. Also, the installation of an additional 10 feet of bore and casing at highway station 115+75 to extend the casing to the edge of a box culvert that is to T— be-built=bytthe'highway-contractart- The!following bid'item-quantities are ''' hereby added to the Proposal: 31. ADD 6 each, Blow -off and flushing stations @$400.00 each = $2,400.00 32. ADD 10 L.F. 16 inch casing installed to grade @$52.82/L.F. = 528.20 Net addition to Contract, this Change Order No. 1 = $2,928.20 Total Contract Price Net Increase Change Order No. 1 Total Contract Price, including All other provisions of the Contract Approved this Engineer: »9 day of McGoodwin, Williams, and Yates, Inc. = $629,626.85 = 2,928.20 Change Order No. 1 = $632,555.05 remain in force. /4 , 1982. Contractor: Kraus Construction Compan Joe Tarvin, P E. Alvin L. Prieur, P.E. Owner: City of Fayetteville VaeteqPaul R. yor FAYETTEVILLE, ARKANSAS P.O. DRAWER F CITY ENGINEER'S OFFICE TO: Board of Directors FROM: : City Engineer SUBJECT: Change Order No. 1 - Relocation of Water Line Farmington DATE: October 11, 1982 72701 (501)521-7700 Attached is a copy of Change Order #1 in connection with the water line relocations through Farmington. Item 31, the blow -off and flushing stations were required by the Arkansas Health Department and adds $ 2,400.00 to the contract. Item 32, 16 -inch encasement, was required by the Arkansas Highway Department and adds $ 528.20 to the contract. I recommend approval of the Change Order. •