HomeMy WebLinkAbout117-82 RESOLUTION•
•
•
•
•
RESOLUTION NO. )77-8a.
A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO
EXECUTE A CONTRACT WITH NORTHWEST ENGINEERS, INC. FOR
ENGINEERING SERVICES NECESSARY FOR IMPROVEMENTS TO
ROCK STREET, SOUTH STREET, AND WEST STREET.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
That the Mayor -and City Clerk are hereby authorized and
directed to execute a contract with Northwest Engineers, Inc.
for engineering services necessary for improvements to Rock
Street, South Street, and West Street. A copy of the contract
authorized for execution hereby is attached hereto, marked
Exhibit "A" and.made a part hereof. L
PASSED AND APPROVED this / day of (De 70B E/ , 1982.
•
APPROVED:_
Pi
-6ATTEST.:
144 nor
�ajea.d //
7 `
•
,',City Clerk
By:
Mayor
dLiA
•
•
AGREEMENT FOR ENGINEERING SERVICES '
FOR
RIGHT-OF-WAY MONUMENTATION AND STREET CONSTRUCTION
THIS AGREEMENT, made and entered into this oWh day of QC.—A;Xide
1982, by and between the City of Fayetteville, Arkansas, hereinaeter referred
to as the "Owner," and Northwest Engineers, Inc., Consulting Engineers of
Fayetteville, Arkansas, hereinafter referred to as the "Engineer."
WITNESSETH THAT:
WHEREAS, the Owner desires to improve, construct or reconstruct certain
streets within the City of Fayetteville; and
WHEREAS, the Engineer has sufficient expierenced personnel and equipment
to perform the work described in this Agreement;
NOW THEREFORE, in consideration of the mutual covenants and agreements
herein contained, the Owner and Engineer, the parties hereto, stipulate and
agree that the Owner does hereby employ the Engineer to perform the required
engineering services as hereinafter set out; and the Engineer agrees to pro-
vide said services.
Section1.- Description of'Project
The project for which engineering services are to be provided is generally
described as follows:
A. Establish and monument the right-of-way of the following streets:
1. Rock Street from:West Street to School Street
2. South Street - from West Street to School Street
3. West Street - from Rock Street to South Street
B. Widening of the following streets:
1. Rock Street - from West Street to School Street
2. South Street - from West Street to School Street
3. West Street (East side only) - from Rock Street to South Street
Section 2. Scope of Engineering Services
The Engineer shall provide a suitable staff to perform basic engineering
design services more specifically defined as follows:
PHASE I: RIGHT-OF-WAY MONUMENTATION
A. Establishing and Monumentating:8treet'Right-of=Way. The work to be
done under this item shall consist of the following:
1. Perform necessary field surveys and office research needed to
establish the right-of-way boundary.
1
•
•
2. Set concrete monuments at all points of change in direction
of the boundary.
All of the above described work of Phase I shall be completed in
seven (7) days from the date of the Notice to Proceed. Compensation
for all of the above described work of Phase I shall be a lump sum
fee of $1,175.00 as set out in Section 3.
PHASE II: PRELIMINARY ENGINEERING REPORT
A. Field-SurveySand Basic Drawings. The work to be done under this
item shall consist of the following:
1. Perform detailed field surveys of the various sites to establish
data necessary for the preparation of preliminary plans. The
field surveys shall include:
a. The location of all existing utilities as best can be located
without excavation, and the location of apparent street right-
of-way lines.
b. Profiles as necessary to provide information to draw cross-
sections on 50 -foot stations.
c. The establishment of a base line on the ground and referenced
so that it can be re-established at a later date.
2. Prepare copies of all reduced field survey notes to be delivered
to the Owner by the Engineer.
3. Prepare reproducible plan and profiles and cross-sections of the
existing features as determined by the above field surveys. Said
reproducibles to be delivered to the Owner.
4. Advise the Owner as to soils investigations that might be requir'ed.'
B. " Design and Cost Estimate. Work to be done under this item shall consist
of the following:
1. Prepare one copy of "red -lined" drawings on the blueprints completed
under Item A-3 above showing the design which would meet the present
city standards as defined by existing codes and ordaninces.
2. Prepare construction cost estimates for each individual project
shown above.
All of the above described work of Phase II shall be completed in twenty-.
one (21) days from the date of the Notice to Proceed.
Upon completion of Phase II, the Engineer shall meet with the Owner and
their agents to present the above information and assist in deciding
which projects to proceed with detailed engineering.
•
•
Compensation for all of the above described work of Phase II shall
be a lump sum fee of $3,900.00 as set out in Section 3.
PHASE III: DETAILED ENGINEERING
A.
Preparationof Detailed Plans and Specifications.
under this item shall consist of the following:
Work to be done
1. Prepare detailed plans, specifications, and bid documents of those
projects selected by the Owner.
2. Assist the Owner in advertising for and
struction of the selected projects.
receiving bids for con -
Any changes or alternate designs made at the request of the Owner will
be made at the hourly rates quoted herein and shall be considered
extra work and not subject to the maximum fee..
E. Construction Phase
Under this phase the Engineer will perform the following items of work:
Provide for periodic visits to the job sites by a professional en-
gineer to observe the overall progress and quality of the executed
work.
2. Provide for construction observation as necessary to insure com-
pliance with the plans and specifications.
3. Provide a survey crew to lay out the project for construction, ex-
cluding any necessary land and right-of-way surveys.
4. Provide a project engineer to manage and coordinate the construction
activities.
5. Provide other personnel such as secretaries, draftsmen, engineering
technicians, etc., as may be needed to assist the project engineer
in the various activities that may be required.
6. Prepare monthly partial payment estimates and a final estimate to
the contractor, including the assembly of written guarantees which
are required by the contract documents.
7. Provide for final inspection of
presentatives of the Owner, the
of the contractor and any other
the project in the company of re -
project engineer, a representative
party designated by the Owner.
Payment for the above described work shall be made on an hourly basis
as further defined in Section 3 of this contract.
"Section 3. 'Compensation
Compensation for the various types of services to be provided under this
contract shall be made as follows:
•
•
•
•
A.-.Phase:It(:Righ.tof.Way:.Monumentation•
Compensation for right=of-way monumentation shall be a lump sum
fee of $1,175.00." This fee includes full compensation for every item
of work described in Section II, Phase I.
•
Phase:Il:. Preliminary-Engineering'Report
Compensation for preliminary engineering services shall be a
lump sum fee amount of $3,900.00. This fee includes full compensation
for every item of 'work as described in Section 2, Phase II: Preliminary
Engineering Report. The fee is based on an estimate of the various
classifications•of work at the hourly rates as set out below. The
hourly rates include direct labor costs plus allowances for indirect
labor costs, overhead and profit.
Engineer (30 Hrs. @ $45.00/Hr.)
Draftsman (30 Hrs. @ $18.00/Hr.)
2 -Man Survey Crew (8 Hrs. @ $30.00/Hr.)
3 -Man Survey Crew (32 Hrs. @ $45.00/Hr.)
Material
TOTAL
Phase:III:.: Detailed Engineering Report
$ 1,350.00
540.00
240.00
1,440.00
330.00
$ 3,900.00
Compensation for Phase III shall be based on the actual hours of
the various classifications of employees that may be necessary to per-
form the work. The total fee shall not exceed $2,378.00 so long as
the total construction time is four months or less from the date of
Notice to Proceed to the construction contractor. If the total con-
struction time exceeds sik:months, then the Engineer shall be com-
pensated for the additional time a construction inspector is required
to be on the project.
The rates to be charged for the various classifications of personnel
are set out below. Along with the rates is an estimate of the hours that
will be .required to perform the work.
Engineer (12"Hrs:, @ $45.00/Hr.)
Draftsman (10 Hrs. @ $18.00/Hr.)
-344an Survey Crew (16-Hrs. @ $45.00/Hr )
Construction Inspector (40 Hrs. @ $20.00/Hr.)
Material
TOTAL
D.'.Method.:of Payment
Payments to the Engineer shall be made as follows:
1. Phase'I: Right -of -Way Monumentation
Full payment to be made upon completion of the monumentation.
$ 540.00
180.00
720.00
800.00
138.00
$ 2,378.00
4
Section 4
2. Phase II: Preliminary Engineering Report
Full payment to be made upon submittal to the Owner
quired plans and other information.
r -
3. Phase III: Detailed Engineering
i' F ,
Payment to be made monthly using
Section 3.
General Considerations
of the re-
•
the hourly rates as shown in
A. -Termination-of Contract for Cause
If, through any cause, the Engineer shall fail to fulfill in timely and
proper manner his obligations under this contract, or if the Engineer shall
violate any of the covenants, agreements, or stipulations of this contract, the
Owner shall thereupon have the right to terminate this contract by giving
written notice to the Engineer of such termination and specifying the effective
date thereof, at least five days before the effective date of such termination.
In such event, all finished or unfinished documents, data, studies, and reports
prepared by the Engineer under this contract shall, a€ the option of the Owner
become its property, and the Engineer shall be entitled to receive just and
equitable compensation under this contract for any satisfactory work completed
on such documents.
Notwithstanding the above, the Engineer shall not be relieved of liability
to the Owner for damages sustained by the Owner by virtue of any breach of the
contract by the Engineer, and the Owner may withhold any payments to the Engineer
for the purpose of setoff until such time as the exact amount of damages due the
Owner from the Engineer is determined.
•
B.' Termination forConvenience of Owner
The Owner may terminate this contract any time by a notice in writing from
the Owner to the Engineer. If the contract is terminated by the Owner as pro-
vided herein, the Engineer will receive just and equitable compensation under
this contract.
C. Changes
The Owner may, from time to time, request changes in the scope of the ser-
vices of the Engineer to be performed hereunder. Such changes, including any
increase or decrease in the amount of the Engineer's compensation, which are
mutually agreed upon by and between the Owner and the Engineer, shall be in-
corporated in further written amendments to this contract.
D."Personnel
I:. The'_Engineer:representscthat he,has, er'willmsecure'.at his own -expense,
allspersbnnel requiied-in.:performing the services'und'et7this:contractu-".Such-per-
sonnel shall not be employees of or have any contractual relationship with the
Owner.
2. All the -services required hereunder will be performed by the Engineer
or under his supervision and all personnel engaged in the work shall be fully
qualified and shall be authorized orpermitted under state and local law to per-
form such services.
3. No person who is serving sentence in a penal or correctional institution
shall be employed on work under this contract.
E. Compliance with'LocalLaws
The Engineer shall comply with all applicable laws, ordinances, and codes
of the state and local governments and shall commit no trespass on any public
or private property in performing any of the -work embraced by this contract.
F. Assignability
The Engineer shall not assign any interest in this contract and shall not
transfer any interest in the same (whether by assignment or novation) without
the prior written approval of the Owner; provided, however, that claims for
money due or to become due the Engineer from the Owner under this contract may.
be assigned to a bank, trust,company, or other financial institution, or to a
trustee in bankruptcy, without such approval. Notice of any such assignment
or transfer shall be furnished promptly to the Owner.
G. Accessto-Records
The Owner, the U. S. Department of Housing and Urban Development, the
Comptroller General of the United States, or any of their duly authorized re-
presentatives, shall have access to any books, documents; papers and records of
the Engineer doing work under this contract which are directly pertinent to a
specific grant program for the purpose of making audit, examination, exerpts,
and transcriptions.
H. - Estimates
Since Engineer has no control„over:rthe; cost of labor, materials or equip-
ment, or over the methods of determining prices, or over competitive bidding or
market conditions, the estimates of cost provided are to be made on the basis
of Engineer'sexperience and qualifications and represents his best judgment,
being familiar with the industry, but Engineer cannot and does not guarantee
that established costs will not vary from estimates prepared.
I. -Insurance
Engineer shall secure and maintain such insurance. as will protect him from
claims under the Workmen's Compensation Acts and from claims for bodily injury,
death or property damage which may arise from the performance of his services
under this contract.
J. Successors-and:Assigns
Each party of this contract binds himself and his partners, successors,
executors, administrators and assigns to the other party of this contract in
respect to all covenants of this contract. Neither party shall assign, sublet
or transfer his interest in this contract without the written consent of the
other. '
Section 5. Equal Opportunity Provisions
During the performance of this contract, the Engineer agrees as follows:
A. The Engineer will not discriminate against any employee or applicant
for employment because of race, color, religion, sex, or national origin. The
Engineer will take affirmative action to ensure that applicants are employed, and
that employees are treated during employment, without regard to their race, color,
religion, sex, or national origin. Such action shall include, but not be limited
to, the following: employment, upgrading, demotion, or transfer, recruitment or
recruitment advertising; layoff or termination; rates of pay or other forms of
compensation; and seclection for training, including apprenticeship. The Engineer
agrees to post in conspicuous places, available to employees and applicants for
employment, notices to be provided by the Contracting Officer setting forth the
provisions for this non-discrimination clause.
B. The Engineer will, in all solicitations or advertisements for employees
placed by or on behalf of the Engineer, state that all qualified applicants will
receive consideration for employment without regard to race, color, religion,
sex,.or national origin.
'Section 6. Conflict of Interest
A. Interstof Owner.
No officer, employee, or agent of the Owner who exercises any functions or
responsibilities in the review or approval or in connection with the carrying
out of the project to which this contract pertains shall•.have any personal in-
terest, direct or indirect, in this contract.
B. Interest:of Certain Federal Officials
No member of or delegate to the Congress of the United States, and no Resident
Commissioner, shall be admitted to any share or part of this contract or to any
benefit to arise herefrom.
C. Interest of'Engineer
The Engineer covenants that he presently has no interest and shall not ac-
quire any interest, direct or indirect, in the above described project area or
any parcels therein or any other interest which would conflict in any manner or
degree with the performance of his services hereunder. The Engineer further
covenants that in the performance of this contract, no person having any such in-
terest shall be employed.
Section 7. -Other Provisions
In connection with the project, the Owner shall:
A. Give thorough consideration to all documents presented by the Engineer
and inform the Engineer of all decisions within a reasonable time so as not to
delay the work of the Engineer.
•
•
B . .Make provision for the employees of the Engineer to enter public and
private lands as required for the Engineer to perform necessary preliminary
surveys and investigations.
C. Obtain the necessary lands, easements and rights-of-way for, • the con-
struction of the work. - a !
D. Furnish the Engineer such plans and records of'construction and operation
of existing facilities, or copies of same, bearing on -the -proposed work as may be
in the possession of the Owner. Such documents or data will be returned to the
Owner upon completion of the work or upon the request of the Owner..
E . Pay the cost of making necessary soundings, borings, analyses of materials
and laboratbryywork exclusive of the Engineer's supervision thereof.
F. Pay all plan review costs and all cost of advertising in connection with
the project.
Original documents, plans, design and survey notes represent the product and
training, experience, and professional skill, and accordingly belong to and remain
the property of, the Engineer who produced them regardless of whether the instru-
ments were copyrighted or whether the project for which they were prepared is ex-
ecuted.
This agreement shall be binding upon the parties hereto, their partners, heirs,
successors, administrators and assigns; and neither party shall assign, sublet or
transfer his interest in this agreement without the prior written consent of the
other party hereto.
IN WITNESS WHEREOF, the Owner has caused these presents to be executed in its
behalf by its duly authorized representatives, and the said Engineer by its duly.
authorized representatives, and the parties hereto have set their hands and seals
on the date heretofore set out.
Af1't.ST:''a
Olivia Kel1y4City Clerk
ATT
Harry G. Cfray, Sec. -Tres.
OF FAYETTEVILLE, ARKANSAS
phody
Paul NolandMayor
NORTHWEST ENGINEERS, INC.
t�/�
Erv- eh Wimmerly, President )