Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
13-80 RESOLUTION
• e • • RESOLUTION NO. J3 -&O A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A CHANGE ORDER IN THE CITY'S CONSTRUCTION CONTRACT WITH BRENNAN-BOYD CONSTRUCTION COMPANY FOR A CONTINUING EDUCATION CENTER. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute a change order in the City's Construction Contract with Brennan -Boyd Construction Company, Inc. for a Continuing Education Center. A copy of the change order authorized for execution hereby is attached hereto, marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this � day of 1980. '/r IS dr «or ATTEST:1 • y1 r` CIT -CLERR c ntactiock APPROVED: • `CHANGE ORDER AIA DOCUMENT G701 OWNER ARCHITECT CONTRACTOR HELD OTHER 0 PROJECT: Continuing Education Center (name, address) Fayettevi 1 1 e, Arkansas TO (Contractor) Brennan -Boyd Construction Co Suite 580 First Place Fayetteville, AR L J CONTRACT DATE: You are directed to make the following changes in this Contract: CHANGE ORDER NUMBER: ONE ARCHITECT'S PROJECT NO: CONTRACT FOR: (See attached) 78-1 October 8, 1979 The original Contract Sum was $ Net change by previous Change Orders $ The Contract Sum prior to this Change Order was $ $ The new Contract Sum including this Change Order will be $ The Contract Time will be (increased) (decreased) (unchanged) by The Date of Completion as of the date of this Change Order therefore is Warren D. Segraves and Associates Brennan -Boyd Architects and Engineers, Inc. Construction Co., Inc. suLteT 610 First Place Add es Fayetteville, AR 72701 The Contract Sum will be (increased) (decreased) (unchanged) by this Change Order . • BY DATE February 5, 1980 DATE February 5, 1980 CONTRACTOR Shite 520 First Plare Address Fayetteville, AR 72701 3,218,100.00 3,218,100 . 00 70,130 . 00 3,147,970 . 00 ( -0- ) Days. City of Fayetteville OWNER P 0 Drawer Address a'' 1/4s,s.• Fa e'4-evi+1 R 72 701 BY DATA A (`�J�. /. r "..- er AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1970 EDITION • AIA® ' © 1970 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 ONE PAGE A. CONTINUING EDUCATION CENTER FAYETIEVILLE, ARKANSAS ATTACHMENT TO CHANGE ORDER NUMBER 1 JANUARY 15, 1980 Delete the sixth story including all ceramic pavers,, delete the operable walls on the sixth story, and make' the necessary changes in the facia, windows, roof, masonry and other items as a result of this change, 811 as currently reflected on the drawings as revised on November 16, 1979. This does not change any steel, mechanical or electrical item below the 6th level except for the steel structures for the operable walls which is deleted as these hangers will come with the walls. DEDUCT $ 320,180.00 B. Change the operable walls on the fourth floor from Modernfold Acou'sti-Seal 402 to Modernfold Divisiflex 301. This leaves an allowance of $38,029.00 for these operable walls. DEDUCT 27,735.00 C. Increase the operable wall allowance from $38,029.00 to $42,000.00. This includes the hangers for the operable walls. ADD 3,971.00 D. Change the DP -500 electrical panel in section 16C.3.14 from 32 poles to 42 poles, and (4) type L fixtures on the 5th floor with necessary conduit, and change the telephone entry from 4" rigid metallic conduit to two 4" PVC conduits run under the first floor rather than above the ceiling. ADD 547.00 E Change the stair nosings from Belco type H2006 to vinyl stair treads to be selected by the architect. This 'also deletes the vinyl floor covering on the stair treads since the proposed vinyl stair treads will cover the entire tread and nose of each step. The landings will still have the vinyl flooring specified. DEDUCT F. Add the ceramic pavers bock in for Foyers 201 and 202. (Item A on page 1 included a credit for deleting all ceramic pavers). ADD 1,245.00 3,612.00 • G. Include alternates 1, 3, 4, 5, 6, 7, 8, 9, and 10 back into the job. ADD $ 270,900.00 NET CREDIT 70,130.00 CONTRACT AMOUNT $3,147,970.00