Loading...
HomeMy WebLinkAbout77-79 RESOLUTION• • RESOLUTION NO. 11-19 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NUMBER THREE WITH HECKATHORN CONSTRUCTION COMPANY FOR AN EXPANSION TO THE FAYETTEVILLE YOUTH CENTER. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute a change order number three with Heckathorn Construction Company for an expansion to the Fayetteville Youth Center. A copy of the change order authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 1979. ATTEST: day of APPROVED: I 'MAYOR MiCROFII(LMED DATE 3 1919 REEL CHANGE" ORDER AIA DOCUMENT G701 • OWNER ARCHITECT CONTRACTOR FIELD OTHER (7--75 EXHIBit ::(A PROJECT: AN ADDITION TO FAYETTEVILLE BOYS CLUB CHANGE ORDER NUMBER: 3 (name, address) AND YOUTH CENTER 915 California Drive, Fayetteville, AR 72701 TO (Contractor) rHeckathorn Construction Company 1880 Birch Fayetteville, Arkansas 72701 L J ARCHITECT'S PROJECT NO: 78-A-15 77-195 CONTRACT FOR: CONTRACT DATE: You are directed to make the following changes in this Contract: 1. a. February 14, 1979 To remove and replace concrete floor for new concession room and hallway to existing building due to excessive settlement of existing floor in this area, ADD. . . .$ 621.00 b. To replace the west wall of the hallway for a distance of 16 feet with a new 8" concrete block wall. The existing wall was unstable when two new door openings were installed. ADD. . . .$ 677.00 To reroute gas line to existing building in the ceiling and removing gas line from hallway. ADD. . . .$ 432.00 fPIN D. To install a concrete walk and steps for the east entrance on the first floor. The existing asphalt pavement had been removed during the relo- cation of gas, water and sewer lines. ADD. . . .$ 637.00 TOTAL ADDITION. . . .$2,367.00 The original Contract Sum was Net change by previous Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be (increased) (1) O by this Change Order . The new Contract Sum including this Change Order will be The Contract Time will be Er ) (decrrnsed) (unchanged) by The Date of Completion as of the date of this Change Order therefore is A JOINT VENTURE: Fletcher, Miller, Dean , LR Heckathorn Construction Co. linie land Consulting Engineers 1880A ABirch CAddress P. 0. Box 1229 Address Fa ettev e R 72711 FayetteeevilleAR 72701 BY 17 . 0' _ / L BY 4�i /J i�.v✓'^"r,CGw. DATE R /3 - DATE g (3-7 `r $ 564,622.00 $ 4,956.00 $ 559,666.00 3 2,367.00 $ 562,033.00 ( ) Days. • • • • City of Fayetteville OWNER P. 0. Drawer F Address Fayettev ille, AR 72701 BY DATE /-./ ATTEST -7 Cia`ir Clerk AMA DOCUMENT G701 • CHANGE ORDER • APRIL 1970 EDITION • AIA® • ® 1970 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 ONE PAGE