Loading...
HomeMy WebLinkAbout68-79 RESOLUTION1— • • • RESOLUTION NO. 623--T9 • • A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NUMBER ONE WITH BENNETT CONSTRUCTION COMPANY FOR IMPROVEMENTS TO THE POLLUTION CONTROL PLANT. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute change order number one with Bennett Construction Company for improvements to the Pollution Control Plant. A copy of the change order authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED)this day of 1979. ATTEST: APPROVED: tea\J r.Q -J<. CI Y CL �X 0- F'1 t ia6dd, MAYOR V. - Oa a i`. T Id-- n -""_ ,c S .)W1� CL •.". MKROFILLMED 1979 DATE �- REEL X717 v q wls x•23 CHANGE ORDER NO. 1 MICROFILM® • DATE OCT 3 1919 EXHIBIT A REFI The Contract dated 26 February, 1979, between the City of Fayetteville, Arkansas, and Bennett Construction Company, Inc., Springdale, Arkansas, for improvements to the Fayetteville wastewater treatment plant, is changed in the following particulars. Whereas the City of Fayetteville has an urgent need to provide for aeration of the effluent discharge from the municipal wastewater treatment plant prior to discharge to the White River, the Contractor, Bennett Construction Company, Inc., is authorized to provide all labor and materials as required to construct a side -stream pumping injector system for the purpose of increasing the oxygen content of the wastewater effluent, in accordance with the plans executed by the Engineer and attached hereto and in accordance with this Change Order. In brief, the work includes the following: 1. Fabricate the pump base and install pump and motor, including all electrical starting and control equipment. The turbine pump and motor is to be furnished by the City. 2. Furnish and install all piping, valves, header and eductor system within the plant yard and within the existing chlorine contact chamber, as detailed on the plans. 3. Furnish materials for and construct concrete foundation and unloading slab for oxygen storage tank (said tank to be furnished and installed by others) . 4. Furnish and install a submersible sump pump within the existing transfer pit. 5. Remove, by sawing, the concrete roof of the chlorine contact tank to the lines detailed by the Engineer. Concrete shall be disposed of on City property at a location as designated by the Fayetteville City Engineer. All of the work set out above shall be performed on a force account basis under the times and rates in force under the Contract of 26 February, 1979. It is further agreed that the total cost for the work performed under this Change Order, as shown on the plans or herein described, shall not exceed the sum of $40,839.00. All provisions of the original Contract shall not be changed, except in the follow- ing particulars: 1. All excavation shall be performed by Bennett Construction Company. 2.. The use of small tools by the Contractor shall be billed on a monthly basis. However, the total material charge for the work performed under this Change Order section shall not exceed $500.00. In witness whereof, the City of Fayetteville, Arkansas, and Bennett Construction Page 1 of 2 pages C. • Company, day of Inc., have hereto set their hands and seals, respectively, this (934" , 1979. Witness Attes t;'k-+ v`.eAngel, lrv_7r yy,Ar 19a diock, City Clerk 41.74( Attachment: plans Contractor: Bennett Construction Compa�y, Inc. By H in Archer Owner: City of Fayetteville, Arkansas � Davi R. Malone, Mayor Page 2 of 2 pages � }b ✓- .. - .:. AGREEMENT - - This agreement executed this °�� � day of 9JPjn be✓ 1983, by and between the City of Fayetteville, Arkansas, hereinafter called "the City," and Raymond Sizemore, hereinafter called "the Contractor." TMEREAS, the City of Fayetteville desires to construct a noise barrier at the Fayetteville Municipal Airport (Drake Field); and TMEREAS, the Contractor has submitted a proposal to the City under which the Contractor would perform all coordination for the construction of said noise barrier and would provide III' all necessary labor, excluding the drilling and setting of post holes, according to plans and specifications provided by Engineering Services, Inc. of Springdale, Arkansas; and ITHEREAS, said proposal has been accepted by the City. NOU, THEREFORE, in consideration of the mutual covenants contained herein, the parties hereby agree as follows: 1. The Contractor shall perform all coordination for the construction of a noise barrier at the Fayetteville Municipal Airport (Drake Field), according to plans and specifications prepared by Engineering Services, Inc, of Springdale, Arkansas, with said barrier to be located at a site specified by the City; provided, the Contractor shall be under no obligation to provide the labor, necessary.to drill post holes and set posts but will provide assistance to insure that all posts are plum; and, the Contractor shall be responsible for assuring that all posts are plum. The City agrees to provide the Contractor with all necessary materials for�ttie"'con"strucLioiY"oi'the' 'aforesaid noise barrier. - 1+�^. =rw 2. The Contractor shall commence construction upon' receipt of a notice to proceed from the City and shall complete construction on or before December 31, 1983. Time r �i �V� a i:i 21 s3`. isRaymond.Sizemore.w 11 not be responsible for any damages.