Loading...
HomeMy WebLinkAbout49-79 RESOLUTION• RESOLUTION NO. • A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE 2 CHANGE ORDERS FOR THE DRAKE FIELD TERMINAL BUILDING PROJECT. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute the change orders marked "Exhibits A and B" attached hereto and made a part hereof for the Drake Field Terminal Project. PASSED AND APPROVED this ...5-21a' day of _ S'Age ATTLET4 4 - •• -et. 'a 4 CIT. CLERK •".. - 41- ,__ '- -4•.: ' )ieza4r-/e APPROVED: MiCROFILMED. DATL4,049.4.---1979 REEL 1979. (ThAte49v9 • • CHANGE ORDER PROJECT: Airport Improvements to Drake Field Fayetteville, Arkansas OWNER: City of Fayetteville P. 0. Drawer F Fayetteville, Arkansas 72701 CONTRACTOR: McClinton -Anchor Co. P. O. Box 1367 Fayetteville, Arkansas 72701 • • • Change Order No. 1 Contract Section I Job No. 77-183 DATE: May 18, 1979 Contract Date: April 13, 1979 FAA ADAP Project Nos.: 6-05-0020-06N, 6-05-0020-08ja 6-05-0020-09 6-05-0020-10 PROJECT DESCRIPTION Grading, drainage, asphalt paving, and lighting for aircraft apron and access road for new terminal facilities. CHANGES TO BE MADE 1. FAA ADAP Project Nos.: 6-05-0020-06; 6-05-0020-08;6-05-0020-09. 1. Revise Item No. 1-4 of the Proposal to read 8,740 gal. of Bituminous Prime Coat at same unit price of $0.80 per'gal. and same total cost of $6,992.00. FAA ADAP Project Nos.: 6-05-0020-06; 6-05-0020-08; 6-05-0020-09. 2. Revise contract sum to reflect the total revised quantities after acceptance of Deductive Alternatives 1 and 2 at the unit prices bid in the Proposal. Contract Changes 2. 2. 2. 2. Bid Item No. Original Estimated Quantity Contract Unit Price Revised Original Estimated Estimated Quantity Cost I-1 18,450 CY, $ 4.25 13,295 CY $ 78,412.50 1-2 21,900 CY 5.50 16,805 CY 120,450.00 1-4 8,740 Gal 0.80 5,696 Gal. 6,992.00 1-8 2,940 CY 17.00 9,100 CY 49,980.00 Pagel of 4 Revised Estimated Cost $ 5.6,503.754 92,427.50 4,556.80 15,470.00 Contract Changes 2. F. 2. G. 2. •H. Bid Original Item Estimated No. Quantity 12,176 SY 563 LF 10.02 A 89 SY 29 EA. Original Contract Price Contract Unit Price • Revised Original Estimated Estimated Quantity Cost $ 2.90 -0- $ 35,310.40 16.00 275 LF 9,008.00 1,200.00 6.18 A 12,024.00 10.00 72 SY 890.00 1,260.00 20 EA. 36,540.00 TOTAL $349,606.90 $469,531.93 Revised Contract Price Total Alternate Bid Price Decrease in Contract Price Revised Contract Price FAA ADAP Project No.: Non -participating public Perform excavation and embankment Nos. 1 and 2. • • Revised Estimated Cost $ -0- 4,400.00 7,416.00 720.00 25,200.00 $206,649.05 $601,020.90 149,912.85 $458,158.05 6-05-0020-06 and rental car parking area. deleted by Deductive Alternative B. Install 288 LF of 12 -inch reinforced concrete pipe deleted by Deductive Alternative No. 1. C. Install 9 area lights deleted by Deductive Alternative Nos. 1 and 2. Bid Original Contract Item Estimated Changes No. Quantity 3. A. I-1 3. B. 1-2 3. C. I-11 3. D. 1-28 13,295 CY 16,805 CY 275 LF 20 EA. Contract Revised Original Unit Estimated Estimated Price Quantity Cost $ 4.25 18,450 CY $ 56,503.75 5.50 21,900 CY 92,427.50 16.00 563 LF 4,400.00 1,260.00 29 EA. 25,200.00 TOTAL $178,531.25 Page 2 of 4 Revised Estimated Cost $ 78,412.50 120,450.00 9,008.00 36,540.00 $244,410.50 • • 2. • Revised Contract Price Increase Contract Price New Contract Price FAA ADAP Project No.: 6-05-0020-10 Access road for terminal facilities. • $458,158.05 65,879.25 $524,037.30 4. A. Construct an acceleration lane along the east side of U. S. Highway No. 71 and North of the exit drive for the new terminal facility at' Drake Field in accordance with the attached plan and paving section. This construction is necessary to provide a safe and adequate distance for vehicular traffic to merge with traffic on U. S. Highway No. 71. B. The Contractor shall provide proper signing as specified by the Arkansas State Highway and Transporation Department. Bid Original Contract Revised Original Revised Contract Item Estimated Unit Estimated Estimated Estimated Changes No. Quantity Price Quantity Cost Cost 4. A. I-1 18,450 CY $ 4.25 18,650 CY $ 78,412.50 $ 79,262.50 4. B. 1-2 21,900 CY 5.50 21,932 CY 120,450.00 120,626.00 4. C. 1-4 5,696 Gal. 0.80 5,811 Gal. 4,556.00 4,648.80 4. D. 1-8 910 CY 17.00 1,000 CY 15,470.00 17,000.00 4. E. 1-10 95 LF 3.00 355 LF 285.00 1,065.00 4. F. 1-21 6.18 A 1,200.00 6.48 A 7,416.00 7,776.00 4. G. I -2A 6,320 SY 5.35 6,620 SY 33,812.00 35,417.00 4. H. 1-3A 6,320 SY 2.90 6,740 SY 18,328.00 19,546.00 TOTAL $278,729.50 $285,341.30 krarria Revised Contract Price Increase in Contract Price New Contract Price Page 3 of 4 $524,037.30 6,611.90 $530,649.10 • • • • • • THE AFOREMENTIONED CHANGE, AND WORK AFFECTED THEREBY, IS SUBJECT TO ALL CONTRACT STIPULATIONS AND COVENANTS. ISSUED FOR REASONS INDICATED ABOVE: ACCEPTED BY CITY OF FAYETTEVILLE: , ACCEPTED BY McCLINTON-ANCHOR CO.: ACCEPTED BY FEDERAL AVIATION ADMINISTRATION: CONDITIONS OF SATISFACTION: McCLELLAND CONSULTING ENGINEERS, INC. a-2'0 Si inature %dinar Title -0 4 1.• Date Signature Title Date Chief, Airport District Office Date Page 4 of 4 es • • • PROJECT: CHANG ORDER Airport Improvements to Drake Field Fayetteville, Arkansas OWNER: City of Fayetteville P. O. Drawer F Fayetteville, Arkansas 72701 CONTRACTOR: Jerry D. Sweetser, Inc. P. O. Box 579 Fayetteville, Arkansas 72701 1 Change Order No. 1 Contract Section II Job No. 77-183 DATE: May 22, 1979 Contract Date: April 13, 1979 FAA ADAP Project Nos.: 6-05-0020-06 6-05-0020-08 6-05-0020-09 6-05-0020-10 PROJECT DESCRIPTION Concrete Paving and Concrete Drainage For New Terminal Building. CHANGES TO BE MADE FAA ADAP Project No. 6-05-0020-10 Access Road for Terminal Facilities Construct concrete curb and gutter along the acceleration lane north of the terminal exit drive. Bid Contract Item Changes No. Original Estimated Quantity 1. A. 11-4 3,986 LF Contract Unit Price $3.75 Revised Estimated Quantity 4,246 LF Original Estimated Cost Original Contract Price Increase Contract Price New Contract Price $14,947.50 Pagel of 2 Revised Estimated Cost $15,922.50 $435,635.93 975.00 $436.635.93 • • THE AFOREMENTIONED CHANGE, AND WORK AFFECTED THEREBY, IS SUBJECT TO ALL CONTRACT STIPULATIONS AND COVENANTS. ISSUED FOR REASONS INDICATED ABOVE: ACCEPTED BY CITY OF FAYETTEVILLE: ACCEPTED BY JERRY D. SWEETSER, INC.: ACCEPTED BY FEDERAL AVIATION ADMINISTRATION: CONDITIONS OF SATISFACTION: McCLELLAND CONSULTING ENGINEERS, INC. Engineer 'CFI) Signature Title ttnitak- • Date ONVigSid&tt/CL iN‘ 62—e'77 Date Signature litie Date Chief, Airport District Office Date Page 2 of 2 • • CZ .J. •4 t 0 g. l‘k 4\t; ---icraraggage - • im IM.M • I PROPOSED EXIT DRIVE • X11 In- 50' 4" CRUSHED STONE (SB -2) - 0" RIME CCAT URB 8 GUTTER PROPOSED A CCEL ERAno LANE PROPOSED CURB XX )fl 12.0; FACE TO FACE OF CURB PROPOSED 4 " ASPHALT WALK 4"- HOT- MIX ASPHALTIC CONCRETE BASE COURSE 2"- HOT -MIX ASPHALTIC CONCRETE SURFACE COURSE 8" CRUSHED STONE (SB - 2) PROPOSED ACCELERATION LANE PAVING SECTION SCALE: NONE ' EXISTING WALIk McCLELLAND CONSULTING ENGINEERS INC. fayet tev Ile , arkansas PROPOSED ACCELERATION LANE for EXIT DRIVE NEW TERMINAL FACILITIES DRAKE FIELD FAYETTEVILLE , ARKANSAS