HomeMy WebLinkAbout49-79 RESOLUTION•
RESOLUTION NO.
•
A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO
EXECUTE 2 CHANGE ORDERS FOR THE DRAKE FIELD TERMINAL BUILDING
PROJECT.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
That the Mayor and City Clerk are hereby authorized and
directed to execute the change orders marked "Exhibits A and B"
attached hereto and made a part hereof for the Drake Field
Terminal Project.
PASSED AND APPROVED this ...5-21a' day of
_
S'Age ATTLET4
4
-
••
-et. 'a
4
CIT. CLERK
•".. -
41- ,__ '-
-4•.: '
)ieza4r-/e
APPROVED:
MiCROFILMED.
DATL4,049.4.---1979
REEL
1979.
(ThAte49v9
•
•
CHANGE ORDER
PROJECT:
Airport Improvements to Drake Field
Fayetteville, Arkansas
OWNER:
City of Fayetteville
P. 0. Drawer F
Fayetteville, Arkansas 72701
CONTRACTOR:
McClinton -Anchor Co.
P. O. Box 1367
Fayetteville, Arkansas 72701
•
•
•
Change Order No. 1
Contract Section I
Job No. 77-183
DATE: May 18, 1979
Contract Date: April 13, 1979
FAA ADAP Project Nos.: 6-05-0020-06N,
6-05-0020-08ja
6-05-0020-09
6-05-0020-10
PROJECT DESCRIPTION
Grading, drainage, asphalt paving, and lighting for aircraft apron and
access road for new terminal facilities.
CHANGES TO BE MADE 1.
FAA ADAP Project Nos.: 6-05-0020-06; 6-05-0020-08;6-05-0020-09.
1. Revise Item No. 1-4 of the Proposal to read 8,740 gal. of Bituminous Prime
Coat at same unit price of $0.80 per'gal. and same total cost of $6,992.00.
FAA ADAP Project Nos.: 6-05-0020-06; 6-05-0020-08; 6-05-0020-09.
2. Revise contract sum to reflect the total revised quantities after acceptance
of Deductive Alternatives 1 and 2 at the unit prices bid in the Proposal.
Contract
Changes
2.
2.
2.
2.
Bid
Item
No.
Original
Estimated
Quantity
Contract
Unit
Price
Revised Original
Estimated Estimated
Quantity Cost
I-1 18,450 CY, $ 4.25 13,295 CY $ 78,412.50
1-2 21,900 CY 5.50 16,805 CY 120,450.00
1-4 8,740 Gal 0.80 5,696 Gal. 6,992.00
1-8 2,940 CY 17.00 9,100 CY 49,980.00
Pagel of 4
Revised
Estimated
Cost
$ 5.6,503.754
92,427.50
4,556.80
15,470.00
Contract
Changes
2. F.
2. G.
2. •H.
Bid Original
Item Estimated
No. Quantity
12,176 SY
563 LF
10.02 A
89 SY
29 EA.
Original Contract Price
Contract
Unit
Price
•
Revised Original
Estimated Estimated
Quantity Cost
$ 2.90 -0- $ 35,310.40
16.00 275 LF 9,008.00
1,200.00 6.18 A 12,024.00
10.00 72 SY 890.00
1,260.00 20 EA. 36,540.00
TOTAL $349,606.90
$469,531.93
Revised Contract Price
Total Alternate Bid Price
Decrease in Contract Price
Revised Contract Price
FAA ADAP Project No.:
Non -participating public
Perform excavation and embankment
Nos. 1 and 2.
•
•
Revised
Estimated
Cost
$ -0-
4,400.00
7,416.00
720.00
25,200.00
$206,649.05
$601,020.90
149,912.85
$458,158.05
6-05-0020-06
and rental car parking area.
deleted by Deductive Alternative
B. Install 288 LF of 12 -inch reinforced concrete pipe deleted by Deductive
Alternative No. 1.
C. Install 9 area lights deleted by Deductive Alternative Nos. 1 and 2.
Bid Original
Contract Item Estimated
Changes No. Quantity
3. A. I-1
3. B. 1-2
3. C. I-11
3. D. 1-28
13,295 CY
16,805 CY
275 LF
20 EA.
Contract Revised Original
Unit Estimated Estimated
Price Quantity Cost
$ 4.25 18,450 CY $ 56,503.75
5.50 21,900 CY 92,427.50
16.00 563 LF 4,400.00
1,260.00 29 EA. 25,200.00
TOTAL $178,531.25
Page 2 of 4
Revised
Estimated
Cost
$ 78,412.50
120,450.00
9,008.00
36,540.00
$244,410.50
•
•
2.
•
Revised Contract Price
Increase Contract Price
New Contract Price
FAA ADAP Project No.: 6-05-0020-10
Access road for terminal facilities.
•
$458,158.05
65,879.25
$524,037.30
4. A. Construct an acceleration lane along the east side of U. S. Highway
No. 71 and North of the exit drive for the new terminal facility at'
Drake Field in accordance with the attached plan and paving section.
This construction is necessary to provide a safe and adequate distance
for vehicular traffic to merge with traffic on U. S. Highway No. 71.
B. The Contractor shall provide proper signing as specified by the Arkansas
State Highway and Transporation Department.
Bid Original Contract Revised Original Revised
Contract Item Estimated Unit Estimated Estimated Estimated
Changes No. Quantity Price Quantity Cost Cost
4. A. I-1 18,450 CY $ 4.25 18,650 CY $ 78,412.50 $ 79,262.50
4. B. 1-2 21,900 CY 5.50 21,932 CY 120,450.00 120,626.00
4. C. 1-4 5,696 Gal. 0.80 5,811 Gal. 4,556.00 4,648.80
4. D. 1-8 910 CY 17.00 1,000 CY 15,470.00 17,000.00
4. E. 1-10 95 LF 3.00 355 LF 285.00 1,065.00
4. F. 1-21 6.18 A 1,200.00 6.48 A 7,416.00 7,776.00
4. G. I -2A 6,320 SY 5.35 6,620 SY 33,812.00 35,417.00
4. H. 1-3A 6,320 SY 2.90 6,740 SY 18,328.00 19,546.00
TOTAL $278,729.50 $285,341.30
krarria
Revised Contract Price
Increase in Contract Price
New Contract Price
Page 3 of 4
$524,037.30
6,611.90
$530,649.10
•
•
•
•
•
•
THE AFOREMENTIONED CHANGE, AND WORK AFFECTED THEREBY, IS SUBJECT TO ALL
CONTRACT STIPULATIONS AND COVENANTS.
ISSUED FOR REASONS INDICATED ABOVE:
ACCEPTED BY CITY OF FAYETTEVILLE:
, ACCEPTED BY McCLINTON-ANCHOR CO.:
ACCEPTED BY FEDERAL AVIATION
ADMINISTRATION:
CONDITIONS OF SATISFACTION:
McCLELLAND CONSULTING ENGINEERS, INC.
a-2'0
Si inature
%dinar
Title
-0 4
1.•
Date
Signature
Title
Date
Chief, Airport District Office
Date
Page 4 of 4
es
•
•
•
PROJECT:
CHANG ORDER
Airport Improvements to Drake Field
Fayetteville, Arkansas
OWNER:
City of Fayetteville
P. O. Drawer F
Fayetteville, Arkansas 72701
CONTRACTOR:
Jerry D. Sweetser, Inc.
P. O. Box 579
Fayetteville, Arkansas 72701
1
Change Order No. 1
Contract Section II
Job No. 77-183
DATE: May 22, 1979
Contract Date: April 13, 1979
FAA ADAP Project Nos.: 6-05-0020-06
6-05-0020-08
6-05-0020-09
6-05-0020-10
PROJECT DESCRIPTION
Concrete Paving and Concrete Drainage
For New Terminal Building.
CHANGES TO BE MADE
FAA ADAP Project No. 6-05-0020-10
Access Road for Terminal Facilities
Construct concrete curb and gutter along the acceleration lane north of
the terminal exit drive.
Bid
Contract Item
Changes No.
Original
Estimated
Quantity
1. A. 11-4 3,986 LF
Contract
Unit
Price
$3.75
Revised
Estimated
Quantity
4,246 LF
Original
Estimated
Cost
Original Contract Price
Increase Contract Price
New Contract Price
$14,947.50
Pagel of 2
Revised
Estimated
Cost
$15,922.50
$435,635.93
975.00
$436.635.93
•
•
THE AFOREMENTIONED CHANGE, AND WORK AFFECTED THEREBY, IS SUBJECT TO ALL
CONTRACT STIPULATIONS AND COVENANTS.
ISSUED FOR REASONS INDICATED ABOVE:
ACCEPTED BY CITY OF FAYETTEVILLE:
ACCEPTED BY JERRY D. SWEETSER, INC.:
ACCEPTED BY FEDERAL AVIATION
ADMINISTRATION:
CONDITIONS OF SATISFACTION:
McCLELLAND CONSULTING ENGINEERS, INC.
Engineer
'CFI)
Signature
Title
ttnitak-
•
Date
ONVigSid&tt/CL
iN‘
62—e'77
Date
Signature
litie Date
Chief, Airport District Office
Date
Page 2 of 2
•
•
CZ .J.
•4 t
0 g.
l‘k
4\t;
---icraraggage
-
•
im IM.M • I
PROPOSED EXIT DRIVE
•
X11
In- 50'
4" CRUSHED
STONE (SB -2)
- 0" RIME CCAT
URB 8
GUTTER
PROPOSED A CCEL ERAno
LANE
PROPOSED CURB
XX
)fl
12.0; FACE TO
FACE OF CURB
PROPOSED 4 "
ASPHALT WALK
4"- HOT- MIX ASPHALTIC
CONCRETE BASE
COURSE
2"- HOT -MIX ASPHALTIC
CONCRETE SURFACE
COURSE
8" CRUSHED STONE
(SB - 2)
PROPOSED ACCELERATION
LANE PAVING SECTION
SCALE: NONE '
EXISTING WALIk
McCLELLAND CONSULTING ENGINEERS INC.
fayet tev Ile , arkansas
PROPOSED ACCELERATION
LANE for EXIT DRIVE
NEW TERMINAL FACILITIES
DRAKE FIELD
FAYETTEVILLE , ARKANSAS