HomeMy WebLinkAbout103-79 RESOLUTIONse— ft • • RESOLUTION NO. /03-1 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A CHANGE ORDER IN THE CITY'S CONSTRUCTION CONTRACT FOR AN ADDITION TO THE FAYETTEVILLE YOUTH CENTER. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute a change order in the City's construction contract for an addition to the Fayetteville Youth Center. A copy of the change order authorized for execution hereby is attached hereto marked Exhibit "A" and made a part hereof. PASSED AND APPROVED this 0V day of t0ag ia, APPROVED: 1979. a4.1�,�T Sd fs'? _ice '�, g)eATT_Ey�2. ST -, .. !eked, fa . 172)11pleiwedc \CI�Si.�CL&RK: f V OR MICRQFILMIA DATE JAN S 1980 REEL __ CHANGE, ORDER AIA DOCUMENT G701 OWNER ARCHITECT CONTRACTOR FIELD OTHER 0 PROJECT: AN ADDITION TO FAYETTEVILLE BOYS CLUB (name, address) AND YOUTH CENTER 915 California Drive, Fayetteville, TO (Contractor) Heckathorn Construction Company 1880 Birch Fayetteville, Arkansas 72701 L J CHANGE ORDER NUMBER: Arkansas 72701 5 ARCHITECT'S PROJECT NO: 78-A-15 CONTRACT FOR: 77-195 CONTRACT DATE: You are directed to make the following changes in this Contract: 1. Install one 3'0" February 14, 1979 x 6'0" window in the south wall of Room 208. Window frame to be 3'4" x 6'4" x 41/2" alum w/bronze finish with 1/4" clear tempered glass. 2. Remove existing 3' door frames from west wall of of old shower room and install 6070 double doors to be 6'4" x 7'4" x 4-3/4" hollow metal w/1-3/4" w/1-1/4" tempered glass vision panels. • Add. . . $325.00 old gymnasium and the east wall at these locations. Door frames flush panel hollow metal door Add. . . $732.00 3. Reposition AC Unit No. 2 on roof with necessary duct from unit to duct in ceiling, roof curb and roof pad. Add. . $1,650.00 The original Contract Sum was Net change by previous Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be (increased) 44ercfe•`^`" ' •^�'••^^^`" by this Change Order . The new Contract Sum including this Change Order will be The Contract Time will be 4,0refeesed.HaerefeaseE4 (unchanged) by The Date of Completion as of the date of this Change Order therefore is A JOINT VENTURE Fletcher Dean Associates, LR Heckathorn Construction Co. A�RCC IT CT CONTRACTOR McClelland Consulting Engineers, 1880 BArch Addressp 0. Box 1229 Inc. Fayetteville, Arkansas BY DATE Address Fayetteville Arkansas BY 1)2'41 DATE /d-3/- 7 $ 564,622.00 $ -2,378.00 $ 562,244.00 $ 2,707.00 $ 564,951.00 ( ) Days. City. of Fayetteville OWNER P'J1 Drawer F Address teville, Ar ancac BY DATE ATTEST ,.Tty (, er AIA DOCUMENT CO1 • CHANGE ORDER • APRIL 1970 EDITION • AIA® • © 1970 • THE AMERICAN INSTI1131 E Or ARCTIC' ECTS, 1735 NEW YORK AVE.. N\V, WASHINGTON. D.C. 20006 ONE PAGE